Loading...
HomeMy WebLinkAbout20041612 Ver 1_Mitigation Closeout Report_20170908Water Resources ENVIRONMENTAL OUALITY September 8, 2017 Division of Mitigation Services Attn: Melonie Allen 1652 Mail Service Center Raleigh, NC 27699-1652 (via electronic mail) Re: Meredell Farms Site DMS ID #247 —CLOSEOUT ACCEPTANCE LETTER Dear Ms. Allen, ROY COOPER MICHAEL S. REGAN Scc, S. JAY ZIMMERMAN DWR Project # 2004-1612 Moore County On May 23, 2016 and March 22, 2017, the Division of Water Resources (DWR) received close-out packets from you on behalf of the Division of Mitigation Services (DMS) requesting approval to close- out the subject site from monitoring and maintenance of the riparian areas. On June 21, 2016, Katie Merritt with DWR, visited the subject site to assess the vegetation and overall site conditions. On June 22, 2016, Ms. Merritt provided correspondence to DMS documenting issues with closing out the site. On May 10, 2017, Ms. Merritt and Sue Homewood with DWR, revisited the site and determined that all issues raised by Ms. Merritt had been resolved. Additionally, Ms. Homewood performed a stream determination on UT -2. In response to Ms. Homewood's stream call on UT -2 and correspondence dated May 25, 2017, DMS submitted a revised close-out report on August 3, 2017 for review. An asset map and asset table are attached. As a result of Ms. Merritt's review of the revised close-out request, the following mitigation is approved: River Basin/Service Area Mitigation Type Mitigation Ratio Mitigation Units Distance from stream Cape Fear/Randleman Buffer 1:1 453,648 ft2 0-50' top of bank Restoration Buffer Mitigation (Grandfathered for location — site is located in 03030003) TOTAL 453,648 ft2 Please feel free to contact Katie Merritt at (919) 807-6371 if you have any questions regarding this correspondence. KAH/kym Sincerely, �ALW6*4_ Karen Higgins, Supervisor 401 & Buffer Permitting Branch State of North Carolina I Environmental Quality I Water Resources 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 919 807 6300 ATTACHMENTS: Asset Map, Asset Table cc: File Copy - Katie Merritt Page 212 Asset Table Project Applicable Credit Buffer Width Buffer Resulting Notes: Component Rule Eligible Adjustment Mitigation Mitigation All originally the success criterion of 320 buffer planted stems/acre; 11/12 Credit Ratio Units proposed (sq. ft.) All buffers= e_z (BMUs) preservation total stem density across all 50 feet P (NS, u) = 3 removed due to stems/acre respectively. P (S, U) = 3 not meeting P(NS,R)=5 P (S, R) = 10 location requirement of current rule Ut 1 15A NCAC 174,558 None 1:1 174,558 028.0252 Ut 2 15A NCAC 114,968 None 1:1 114,968 removed Oii1f 028.0252 11,335 sq ft M1 15A NCAC 164,122 None 1:1 164,122 028.0252 Totals 453,648 453,648 Success Criterion Project Component Success Criteria per Success Criteria Met Approved Mitigation Plan Riparian Buffer 320 stems per acre Yes — 9/12 plots exceeded • 5 plots/transects the success criterion of 320 planted stems/acre; 11/12 plots exceeded with volunteers Average planted density and total stem density across all plots is 475 and 1,753 stems/acre respectively. ° �6�G0b[ 2'0P-