Loading...
HomeMy WebLinkAbout20140762 Ver 3_Sept NPDES inspection_20170912Wetland Inspection Report Project Num: 20140762 Project Name: NCDOT- US 221 (R-2915B) County: Watauga Location: NCDOT- US 221 (R-2915B) Latitude: +35° 16' 05" SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 9�7/2017 Reason for Inspection Routine Inspection Type: Records/File Review (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: � Compliant Program Areas: NPDES SW - Roadway (DOT) Question Areas: � Operation and Maintenance Inspection Summary: Version: 3 Status: Issued Project Type: Road/Highway Widening Region: Central Title: ❑ Not Compliant Longitude: -81 ° 30' 10" Phone: Phone: 336-776-9703 page: 1 Site Number: 20140762 Inspection Date: 9/7/2017 Owner: Thorpe, Gregory Inspection Type: Records/File Review (DOT) Operation and Maintenance Are the SW measures being maintained and operated as per the permit requirements? Are the inspection and maintenance records complete and available for review? Reason for Visit: Routine Yes No NA NE � ❑ ❑ ❑ � ❑ ❑ ❑ Comment: NPDES records are in order and EC measures are being maintained. Concern was expressed by DOT staff concerning the upcoming storm event (Irma) and what measures may be damaged bv the excessive rains/runoff. Staff assured me that all measures would be in place and beefed up where needed for additional protection. page: 2