November 24, 2008
DWQ# 08-1709
Catawba County
Mr. Chris Hallman
Duke Energy Corporation
526 South Church Street
Charlotte, NC 28202
Subject: Marshall Steam Station, Industrial Landfill #1
APPROVAL of 401 Water Quality Certification with Additional Conditions
Dear Mr. Hallman:
You have our approval, in accordance with the attached conditions and those listed
below, to impact 0.154 acre of wetland in order to construct the landfill in Catawba County, as
described in your application received by the Division of Water Quality (DWQ) on November 17,
2008. After reviewing your application, we have determined that this project is covered by
Water Quality General Certification Number 3705, which can be viewed on our web site at
http://h2o.enr.state.nc.us/ncwetlands. The General Certification allows you to use Nationwide
Permit Number 39 once it is issued to you by the U.S. Army Corps of Engineers. Please note
that you should get any other federal, state or local permits before proceeding with your project,
including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge,
and Water Supply Watershed regulations.
The above noted Certification will expire when the associated 404 permit expires unless
otherwise specified in the General Certification. This approval is only valid for the purpose and
design that you described in your application. If you change your project, you must notify us in
writing, and you may be required to send us a new application for a new certification. If the
property is sold, the new owner must be given a copy of the Certification and approval letter;
and is thereby responsible for complying with all conditions.
In addition to the requirements of the certification, you must also comply with the
following conditions:
1. The Mooresville Regional Office shall be notified in writing once construction at the approved
impact areas has commenced.
2. All wetlands, streams, surface waters, and riparian buffers located on the project site where
impacts are not allowed shall be clearly marked (example- orange fabric fencing) prior to any
land disturbing activities.
3. Storm water discharge structures at this site shall be constructed in a manner such that the
potential receiving streams (of the discharge) will not be impacted due to sediment
accumulations, scouring or erosion of the stream banks.
Mailing Address
610 East Center Avenue, Suite 301
Mooresville, NC 28115
Phone (704) 663-1699
Fax (704) 663-6040
Location
610 East Center Avenue, Suite 301
Mooresville, North Carolina
One
North Carolina
.11 atura!!y
Internet: www.ncwatcrnualityor> Customer Service 1-877-623-6748
4. Sediment and erosion control measures shall not be placed in wetlands or waters without prior
approval from DWQ. If approved, they shall be removed and the natural grade restored
within two months of the date of the close out/stabilization of the given drainage area.
5. Upon completion of the project, the applicant shall complete and return the enclosed
"Certificate of Completion" form to the 401 /Wetlands Unit of the NC Division of Water Quality.
6. Continuing Compliance. The applicant (Duke Energy Corporation, Chris Hallman) shall
conduct all activities in a manner so as not to contravene any state water quality standard
(including any requirements for compliance with section 303(d) of the Clean Water Act) and
any other appropriate requirements of state and federal law. If DWQ determines that such
standards or laws are not being met (including the failure to sustain a designated or achieved
use) or that state or federal law is being violated, or that further conditions are necessary to
assure compliance, DWQ may reevaluate and modify this certification to include conditions
appropriate to assure compliance with such standards and requirements in accordance with
15 A NCAC 2H.0507(d). Before codifying the certification, DWQ shall notify the applicant and
the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC
2H.0503, and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504.
Any new or revised conditions shall be provided to the applicant in writing, shall be provided to
the United States Army Corps of Engineers for reference in any permit issued pursuant to
Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for
the project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory
hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing,
send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to
the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This
certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the
Clean Water Act. If you have any questions, please telephone Mr. Alan Johnson in the
Mooresville Regional Office at 704-663-1699 or Ms. Cyndi Karoly in the Central Office in Raleigh
919-733-9721.
Sincerely,
for Coleen H. Sullins
Attachments