HomeMy WebLinkAbout20171144 Ver 1_401 Application_201709072 0 1 7 1 1 4 4
Brown's Environmental Group, Inc.
Wetlands, Soils, Permitting
Brownenvgrp@gmail.com
919-524-5956
September 2, 2017
RECEIVED
Karen Higgins SEP 0 %
NCDWR — 401 & Buffer Permitting Unit 2� 7
1617 Mail Service Center DENR-LAND QUALITY
Raleigh, NC 27699 — 1617 STORMWATER PEpMj' 7NG
Re: PCN application Heritage 4 wetland impact
Johnston County
Karen
Enclosed are 3 copies of PCN and maps for wetland impact for a residential drive way
crossing a wetland. The enclosed is a fee of $240.00. The drive way impact does not
impact the Neuse Buffers or a stream.
Any questions, please do not hesitate to contact me.
Thank you
Wyatt Brown, LSS, CPESC
President
Brown's Environmental Group, Inc
242 Batten Farm Road, Selma, NC 27576
W. N. Evans Development LLC.
266 B Blue Pond Road
Clayton NC 27520
June 5, 2017
US Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Ms. Samantha Dailey
Re: W. N. Evans Development LLC.
Heritage Subdivision
I, the undersigned, a duly authorized owner of record of the property/properties identified herein, do
authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) to enter upon
the property herein described for the purpose of conducting on-site investigations and issuing a
determination associated with Waters of the U.S. subject to Federal jurisdiction under Section 404 of
the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899.
Also, Mr. Wyatt Brown of Brown's Environmental Group, Inc. has my permission to act as my agent on
this property concerning wetlands and streams.
G✓- �luC C0415
4 A
DEPARTMENT OF PUBLIC UTILITIES
POST OFFICE BOX 2263
SMITHFIELD, N.C. 27577
(919) 989-5075
July 21, 2017
Wyatt Brown. LSS, CPESC
Brown's Environmental Group. II1C.
242 Batten Farm Rd
Selma, NC 27576
Subject: Neuse River Buffer Call
N BR# NB 17-01
Project Name: l leraggt Phase 4 Parcel (NC PIN# 178001-27-7788)
Location / Directions: Nashville Drive, Clayton, NC
Subject Stream: UT to Arm Creek (C, NSW)
Determination Date: July 21, 2017 Staff: Carlos Bagley, PE
— -- -
Latitude
Longitude
Stream Not
USGS
Soil
Feature Type Subc ct Subject Start (d)
i
Stop (u? Survey
(Dec.
(Dec.
(L�i�t')`
i,o p°
Degrees)
Degrees)
POND ® ❑
—®--
-
-----
*!i I /' F phrnrE:ruf i hNrr•rurrterrl,' I'er�►uriu!
Explanation: The feature(k) listed above that are checked "Subject" to the Johnston County Neuse
Riparian Buffer Ordinance (Section 14-393 Johnston County Code of Ordinances) has or have been
approximately shown on either the Soil Survey of Johnston County, North Carolina (1994) or the most
recent version of the 1:24,000 (7.5 minute) quadrangle topographic maps prepared by the United States
Geologic Survey (USGS), and have been located on the property and possess characteristics that qualify
it to be a stream. Each feature that is checked "Not Subject" has been determined not to be a stream or
is not present on the property. 'There may be other streams located on your property that do not show up
on the maps referenced above but still may be considered jurisdictional according to the IJS Army Corps
of Engineers and/or the North Carolina Division of Water Resources.
Printed on recycled paper N
Propertry Info:
p Heritage Phase 4
-� USGS Topographic Map NC PIN 178001-27-7788
Johnston County Public Utilities
309 E. Market Street 440 220 0 440
P.O. Box 2263 Feet
Smithfield, NC 27577
jr
caw--- _14111hop olfttq�
4
:IVA, J
al
lb
a
a
O�O� WA T S;9
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Page 1 of 10
PCN Form - Version 1.3 December 10, 2008 Version
Pre -Construction Notification PCN Form
A. Applicant Information
1.
Processing
1 a.
Type(s) of approval sought from the
Corps:
® Section 404 Permit ❑Section 10 Permit
1 b.
Specify Nationwide Permit (NWP) number: 29 or General Permit (GP) number:
1c.
Has the NWP or GP number been verified by the Corps?
® Yes
❑ No
1 d.
Type(s) of approval sought from the DWQ (check all that apply):
® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e.
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification:
❑ Yes ® No
For the record only for Corps Permit:
❑ Yes ® No
1f.
Is payment into a mitigation bank or in -lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu
fee program.
❑ Yes
® No
1g.
Is the project located in any of NC's twenty coastal counties. If yes, answer 1h
below.
❑ Yes
® No
1 h.
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes
® No
2.
Project Information
2a.
Name of project:
Heritage 4
2b.
County:
Johnston
2c.
Nearest municipality 1 town:
Archer's Lodge
2d.
Subdivision name:
Heritage
2e.
NCDOT only, T.I.P. or state
project no:
3.
Owner Information
3a.
Name(s) on Recorded Deed:
W N Evans, LLC
3b.
Deed Book and Page No.
04871, 0976
3c.
Responsible Party (for LLC if
applicable):
W Neal Evans
3d.
Street address:
237 B Blue Pond Road
3e. City, state, zip:
Clayton, NC 27520
3f.
Telephone no.:
3g.
Fax no.:
3h.
Email address:
Page 1 of 10
PCN Form - Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is:
❑ Agent ❑ Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name:
Wyatt Brown
5b. Business name
(if applicable):
Browns Environmental
Group, Inc
5c. Street address:
242 Batten Farm Road
5d. City, state, zip:
Selma, NC 27576
5e. Telephone no.:
919-524-5956
5f. Fax no.:
5g. Email address:
brownenvgrp@gmail.com
Page 2 of 10
PCN Form — Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID):
178001-27-7788
1 b. Site coordinates (in decimal degrees):
Latitude: 35.69348 Longitude: - 78.38419
(DD.DDDDDD) (-DD.DDDDDD)
1c. Property size:
22.24 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
Big Arm Creek
proposed project:
2b. Water Quality Classification of nearest receiving water:
C,NSW
2c. River basin:
Neuse
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
sweet gum, maple forest, pine, area land use subdivisions and farmimg
3b. List the total estimated acreage of all existing wetlands on the property:
—2.43 ac. wetlands in project area,
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
1746.
3d. Explain the purpose of the proposed project:
Install a residential drive way across a wetland
3e. Describe the overall project in detail, including the type of equipment to be used:
A small wetland must be crossed to access a single family home site, a 15 in culvert will be installed in the wetland to
allow crossing and connectivity, track hoes will be used to place the fill, dump trucks will haul fill in temporary silt fence
will be placed at toe of fill until area is stabilized with a ground cover.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
❑ Yes ® No ❑ Unknown
project (including all prior phases) in the past?
Comments:
4b. If the Corps made the jurisdictional determination, what type
❑ preliminary ❑ Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas?
Agency/Consultant Company: Brown's Env. Group, Inc
I
Name (if known): Wyatt Brown
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
Pond Neuse Buffer Stream Determination, Carlos Bagley July 21,2017, attached
6. Project History
5a. Have permits or certifications been requested or obtained "TED
Yes ❑ No ® Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project?
❑ Yes ® No
6b. If yes, explain.
Page 3 of 10
PCN Form — Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
® Wetlands ❑ Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
2b.
2c.
2d.
2e.
2f.
Wetland impact
Type of jurisdiction
number —
Type of impact
Type of wetland
Forested
(Corps - 404, 10
Area of impact
Permanent (P) or
(if known)
DWQ — non -404, other)
(acres)
Temporary
W1 ®P F1 T
10 linear ft of 15
® Yes
® Corps
0.01
in. pipe
❑ No
® DWQ
W2 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W3 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W4 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W5 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W6 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
2g. Total wetland impacts
0.01
2h. Comments: single family residential drive way
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
3b.
3c.
3d.
3e.
3f.
3g.
Stream impact
Type of impact
Stream name
Perennial
Type of jurisdiction
Average
Impact
number -
(PER) or
(Corps - 404, 10
stream
length
Permanent (P) or
intermittent
DWQ — non -404,
width
(linear
Temporary (T)
(INT)?
other)
(feet)
feet)
S1 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S2 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S3 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S4 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S5 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S6 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
3h. Total stream and tributary impacts
3i. Comments:
Page 4 of 10
PCN Form — Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
4b.
4c.
4d.
4e.
Open water
Name of waterbody
impact number —
(if applicable)
Type of impact
Waterbody type
Area of impact (acres)
Permanent (P) or
Temporary
01 [:1 POT
02 ❑P❑T
03 ❑P❑T
04 ❑P❑T
4E Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a.
5b.
5c.
5d.
5e.
Pond ID
Proposed use or purpose
Wetland Impacts (acres)
Stream Impacts (feet)
Upland
number
of pond
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a.
® Neuse ❑ Tar -Pamlico ❑ Other:
Project is in which protected basin?
❑ Catawba ❑ Randleman
6b.
6c.
6d.
6e.
6f.
6g.
Buffer impact
number —
Reason
Buffer
Zone 1 impact
Zone 2 impact
Permanent (P) or
for
Stream name
mitigation
(square feet )
(square feet)
Temporary
impact
required?
61 ❑P❑T
❑Yes
❑ No
B2 ❑P❑T
❑Yes
❑ No
B3 ❑P❑T
❑Yes
❑ No
6h. Total buffer impacts
6i. Comments:
Page 5 of 10
PCN Form — Version 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Drive narrow as safe (10 ft), try to cross wwetland at narrow section
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Care will be taken to install fill during dry weather conditions as possible, and quickly as possible, stabilize immediately, silt
fence placed between fill and wetlands until fill is stabilized with a ground cover
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
❑ Yes ® No
2b. If yes, mitigation is required by (check all that apply):
❑ DWQ ❑ Corps
2c. If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
❑Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter)
Type
Quantity
3c. Comments:
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
❑ Yes
4b. Stream mitigation requested:
linear feet
4c. If using stream mitigation, stream temperature:
❑ warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ only):
square feet
4e. Riparian wetland mitigation requested:
acres
4f. Non -riparian wetland mitigation requested:
acres
4g. Coastal (tidal) wetland mitigation requested:
acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form —Version 1.3 December 10, 2008 Version
S. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
❑ Yes ® No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone
6c.
Reason for impact
6d.
Total impact
(square feet)
Multiplier
6e.
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
6h. Comments:
Page 7 of 10
PCN Form — Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified
❑ Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
Comments:
Yes No
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project?
15%
2b. Does this project require a Stormwater Management Plan?
® Yes ❑ No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
rrequired by Johnston County
® Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan?
❑ DWQ Stormwater Program
❑ DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
Johnston
® Phase 11
3b. Which of the following locally -implemented stormwater management programs
® NSW
❑ USMP
apply (check all that apply):
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ® No
attached?
4. DWQ Stormwater Program Review
❑ Coastal counties
4a. Which of the following state -implemented stormwater management programs apply
❑ HQW
❑ ORW
(check all that apply):
❑ Session Law 2006-246
❑ Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached?
❑ Yes ❑ No
S. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b. Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the
❑ Yes ® No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.)
❑ Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
❑ Yes ® No
or Riparian Buffer Rules (15A NCAC 2B.0200)?
2b. Is this an after -the -fact permit application?
❑ Yes ® No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
❑ Yes No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Page 9 of 10
PCN Form — Version 1.3 December 10, 2008 Version
S. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
El Yes No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act
❑ Yes ® No
impacts?
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Raleigh
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
Natural Heritage Program,
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
hftp://www.habitat.noaa.gov/protection/efh/habitatmapper.htm1
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
El Yes No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
Dept. Cultural Resources, Historic Preservation Office
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA -designated 100 -year floodplain?
❑ Yes ® No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? Flood Maps
Wyatt Brown
September 2,
2017
Applicant/Agent's Printed Namelicant/Agent's
Signature
(Agent's signature i alid only if an authorization letter from the applicant
Date
isprovided.)
Page 10 of 10
PCN Form — Version 1.3 December 10, 2008 Version
WETLAND IMPACT
MAP HERITAGE PHASE 4
1 0 50 1 o NASHVILLE DRIVE
JOHNSTON COUNTY
GRAPHIC SCALE: 100
HODGE 335 ATHLETIC CLUB BLVD
CLAYTON, 27527
& 919-243-1332
)AMI'N_%%�
_- donnie@adamsandndhodge.com