Loading...
HomeMy WebLinkAbout20170216 Ver 1_More Info Received_20170911Homewood, Sue From: rsmall@reedyfork.net Sent: Monday, September 11, 2017 12:15 PM To: Homewood, Sue Subject: RE: Grassy Knoll Lower Pond Renovation - PCN (021717) Attachments: Grassy Knoll - installed plant list for pond 083017.pdf, grassy knoll - project complete 090717(1)jpg; grassy knoll - project complete 090717(2)jpg; grassy knoll - project complete 090717(3)jpg; grassy knoll - project complete 090717(4)jpg Sue - we finally completed the Grassy Knoll project in Blowing Rock last week. And just in time for a hurricane - awesome! I'm not sure how much information you want or need, but I do want to share a few things with you: 1. Despite what we were told by the Town engineer, the culvert replacement last fall did not result in a new culvert at the same elevation. The new culvert was actually set 10+" lower. This created more muck to excavate, reduced our ability to create a great plunge pool, lessened the slope we had to work with, etc. 2. We mobilized the first time a couple of months ago. We drained the pond, installed erosion control, removed the dam, let the pond dry a few days, and then started excavating. It was a nightmare! Even after hauling in dry dirt to mix, it was still like working with pudding. So... we pulled all the material onto the slopes, seeded/strawed everything, temporarily piped the channel, put up a silt fence containment, and let it sit and dry for two months before remobilizing a couple weeks ago. 3. The bottom of that pond is one huge groundwater seep. It is really soft and has no apparent bottom in many places. It's going to make a great pocket wetland, but most of the "stream channel" does not have a firm bottom. It was impossible to grade a true trapezoidal channel. Don't judge us too harshly — we did the best we could! 4. We did have to create a permanent swale leading to the channel. Everything else is covered in 100% biodegradable matting, but we did have to use permanent turf reinforcement matting for that Swale. 5. When removing the dam, we discovered an old concrete wall/weir/footing in the dam. Not knowing how far it extended back towards the adjacent home, we left it in place. Luckily it did not interfere with our channel, and we were able to "hide" it with a boulder and plants. I am including a few photos from last week, along with the installed plant list for your records. The grass had already germinated and was peaking up through the matting, so hopefully we'll be in good shape. Please let me know when you plan to make the first visit so I can attempt to meet you up there. Thanks! Ron 1]-IVI I0 °i may.• 111 J 1dyfork land!capaS Ronald J. Small, Jr., MS Reedy Fork Environmental and Landscapes PO Box 10406 Greensboro, NC 27404 336.558.5970 cell rsmall@reedyfork. net www.reedyfork.net -----Original Message ----- From: Homewood, Sue [mailto:sue.homewood@ncdenr.gov] Sent: Monday, June 19, 2017 3:51 PM To: rsmall@reedyfork.net Subject: RE: Grassy Knoll Lower Pond Renovation - PCN (021717) Hi Ron, Have you finished the work up there? It's one that I'm interested in making time to go see (especially on a hot summer day down here) Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue.Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: rsmall@reedyfork.net [mailto:rsmall@reedyfork.net] Sent: Tuesday, April 11, 2017 5:54 AM To: 'Elliott, William A CIV USARMY CESAW (US)' <William.A.Elliott@usace.army.mil> Cc: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: Grassy Knoll Lower Pond Renovation - PCN (021717) William - I believe this past Friday would have been 45 days since your receipt of our PCN for the Grassy Knoll Pond Renovation project. I did receive our permit from Sue, but have not heard anything back from you yet. Are we automatically able to move forward with the project as proposed, and is there any sort of documentation/authorization for me to provide to my client/property owner? Thanks! Ron Ronald J. Small, Jr., MS Reedy Fork Environmental and Landscapes PO Box 10406 Greensboro, NC 27404 336.558.5970 cell rsmall@reedyfork.net www.reedyfork.net -----Original Message ----- From: Elliott, William A CIV USARMY CESAW (US) [mailto:William.A.Elliott@usace.army.mil] Sent: Tuesday, February 28, 2017 9:51 AM To: rsmall@reedyfork.net Subject: RE: [EXTERNAL] FW: Grassy Knoll Lower Pond Renovation - PCN (021717) We received it Feb 21, 2017. I have not had a chance to look at it. -----Original Message ----- From: rsmall@reedyfork.net [mailto:rsmall@reedyfork.net] Sent: Tuesday, February 28, 2017 7:27 AM To: Elliott, William A CIV USARMY CESAW (US) <William.A.Elliott@usace.army.mil> Subject: [EXTERNAL] FW: Grassy Knoll Lower Pond Renovation - PCN (021717) William - I sent the attached PCN packet to you Certified Mail on Feb. 17, but the tracking info shows that it has not been picked up or fully delivered to you yet. Can you check and see what the situation is on your end? If it's not there for some reason, I'll get another copy in the mail to you ASAP. I mailed it to the address on the general instruction sheet you sent: USACE Attn: William Elliott Asheville Regulatory Field Office 1515 Patton Ave., Room 208 Asheville, NC 28801 Thanks! Ron From: rsmall@reedyforknet [mailto:rsmall@reedyfork.net] Sent: Friday, February 17, 2017 8:56 AM To: 'Elliott, William A SAW' <William.A.Elliott@usace.army.mil>; 'Homewood, Sue' <sue.homewood@ncdenr.gov>; 'ANDREA.LESLIE@NCWILDLIFE.ORG' <ANDREA.LESLIE@NCWILDLIFE.ORG> Subject: Grassy Knoll Lower Pond Renovation - PCN (021717) All - attached is the PCN packet for the Grassy Knoll Lower Pond Renovation project (Watauga Co.) that I mailed to you this morning. Since this is my first submittal for a project like this in the mountains, I hope it is complete and acceptable. Please let me know if you have any questions. Thanks! Ron Ronald J. Small, Jr., MS Reedy Fork Environmental and Landscapes PO Box 10406 Greensboro, NC 27404 336.558.5970 cell rsmall@reedyfork.net <mailto:rsmall@reedyfork.net> Blockedwww.reedyfork.net <Blockedhttp://www.reedyfork.net/> Grassy Knoll POA Blowing Rock, NC Pond Renovation Project Installed Plant List (completed 8/30/17) Common Name Scientific Name Size Quantity Trees and Shrubs Autumn fern Dryopteris erythrosora 2 g 15 Beautyberry'lssai' Callicarpa dichotomy 3 g 6 Serviceberry Amelanchier canadensis 7 g 1 Virginia sweetspire'Little Henry' Itea virginica 3 g 9 White fringetree Chionanthus virginicus 7 g 1 Winterberry'Mr. Poppins' (male pollinator) Ilex verticillata 3 g 1 Winterberry'Red Sprite' Ilex verticillata 3 g 11 Wetland Plants Blue flag iris Iris versicolor plug 20 Buttonbush Cephalanthus occidentalis live stake 12 Cardinal flower Lobelia cardinalis plug 15 Common three -square Schoenoplectus pungens plug 20 Elderberry Sambucus canadensis live stake 12 Lizard tail Saururus cernuus plug 15 Swamp milkweed Asclepias incarnata plug 9 Al 1 %3 1 .• t 77- . z+ t 1 r ax ` � i•e a,1 S At :iTa •". - Ir , -� _ •. - ° KAY;.. � I ._- '. rr_ c WiIt} j ! v ••! "�, ! tom_ ';i ^ . r x vr - r tt 41 Vi i_ S�waA x n s 71, !- c t..I •; a .�{� F +i. # i Rit Z,14 , // , I - k