Loading...
HomeMy WebLinkAbout20170769 Ver 2_401 Application_20170917Montalvo, Sheri A From: Montalvo, Sheri A Sent: Wednesday, September 06, 2017 10:52 AM To: obxwood@yahoo.com Subject: Pitt -Greenville Airport - Perimeter Road Attachments: Agent Authorization Form.pdf Importance: High C George,F We received the above PCN. The first page does not have the owner information filled out, there is not an agent authorization form with it for the owner's consent for you to represent (I have attached one for your use), nor does it have any impacts filled out on pages 5,6 and/or 8 of the PCN. I have entered what I can into our data base and placed on hold until you can email me a copy of the pages listed above with the information on them that is needed. Also, at that time I can let you know what the fee will be for this one. Thanks Sheri Montalvo Administrative Assistant 401 & Buffer Permitting Branch Division of Water Resources North Carolina Department of Environmental Quality 919-807-6303 (office) 919 807-6494 (fax) sheri.montalvo(o)-ncdenr.gov Physical: 512 N. Salisbury St., Ste 942-D, Raleigh, NC 27604 Mailing: 1617 Mail Service Center, Raleigh, NC 27699-1617 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 Montalvo, Sheri A From: Scarbraugh, Anthony Sent: Monday, September 11, 2017 12:36 PM To: Montalvo, Sheri A Subject: RE: Pitt -Greenville Airport - Perimeter Road It is a courtesy copy for record consistency only. Anthony Scarbraugh Environmental Senior Specialist Division of Water Resources — Water Quality Regional Operations Department of Environmental Quality 252 948 3924 office anthony.scarbraugh@ncdenr.gov 943 Washington Square Mall Washington, NC 27889 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Montalvo, Sheri A Sent: Monday, September 11, 2017 12:30 PM To: Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov> Subject: FW: Pitt -Greenville Airport - Perimeter Road Importance: High Anthony, George left me a voice mail saying that there are not any impacts associated with this one. Not sure what to do with it. It is still on hold. I don't know if maybe this should be a courtesy copy instead? Maybe you want to chat with him to learn more about it first? Thanks Sheri From: Montalvo, Sheri A Sent: Wednesday, September 06, 2017 10:52 AM To: obxwoodg4yahoo.com Subject: Pitt -Greenville Airport - Perimeter Road Importance: High George, We received the above PCN. The first page does not have the owner information filled out, there is not an agent authorization form with it for the owner's consent for you to represent (I have attached one for your use), nor does it have any impacts filled out on pages 5,6 and/or 8 of the PCN. I have entered what I can into our data base and placed on hold until you can email me a copy of the pages listed above with the information on them that is needed. Also, at that time I can let you know what the fee will be for this one. Thanks Sheri Montalvo Administrative Assistant 401 & Buffer Permitting Branch Division of Water Resources North Carolina Department of Environmental Quality 919-807-6303 (office) 919 807-6494 (fax) sheri.montalvo(o-)ncdenr.yov Physical: 512 N. Salisbury St., Ste 942-D, Raleigh, NC 27604 Mailing: 1617 Mail Service Center, Raleigh, NC 27699-1617 Nothing Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 2 ENVIRONMENTAL PROFESSIONALS, INC. Planning for a Better Environment P.O. Box 3368 Kill Devil Hills, NC 27948 Telephone: 252-441-0239 Fax: 252-441-0721 Email: obxwood@yahoo.com TO: North Carolina Division of Water Quality 401 Wetlands Unit Attn: Ms. Karen Higgins 1650 Mail Service Center Raleigh, NC 27699-1650 ATTACHED LETTER OF TRANSMITTAL RECEIVED SEP 01 201117 "ENR-LAN TEPT! STORMWRERMIT NG DATE: August 23, 2017 JOB NO.: 016 -001 -PT RE: Talbert & Bright Pitt -Greenville Airport COPIES DATE DESCRIPTION OF DOCUMENTS 4 August 22, 2017 Signed/Dated Pre -Construction Notification Form 4 August 2017 Legend Ma — Potential Repair Sites TARE SUBMITTED AS CHECKED BELOW: H7For your approval ❑ For your use ❑ As requested ❑ Review & Comment ❑ Signature/Notarization REMARKS: Please advise what the application fee will be, and I will forward under separate cover. Thank You. COPY TO: Project File SIGNED:-- //' Ge a H. Wood, CEP, PWS Environmental Professionals, Inc. Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the�� Corps: ® Section 404 Permit El Section 10 Permit SrD 1 b. 1 c. 1 d. Specify Nationwide Permit (NWP) number: #3 or General Permit (GP) number: Has the NWP or GP number been verified by the Corps? ® YesS"""q AND � TY Type(s) of approval sought from the DWQ (check all that apply): G ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Pitt -Greenville Airport — Perimeter Road 2b. County: Pitt County 2c. Nearest municipality / town: Greenville 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: George H. Wood, CEP, PWS 5b. Business name (if applicable): Environmental Professionals, Inc. 5c. Street address: 1404 S. Virginia Dare Trail 5d. City, state, zip: Kill Devil Hills, NC 27948 5e. Telephone no.: Office: 252-441-0239 Cell: 252-423-1234 5f. Fax no.: 5g. Email address: obxwood@yahoo.com Page 2 of 11 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1 b. Site coordinates (in decimal degrees): Latitude: Longitude: - (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: 2b. Water Quality Classification of nearest receiving water: 2c. River basin: 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project site is at the existing Pitt -Greenville Airport. The surrounding land use is a mix of unimproved land to land that supports businesses and/or residences. 3b. List the total estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3d. Explain the purpose of the proposed project: The existing airport has a perimeter road which is in various states of disrepair and will be improved for reliable use. No wetlands are being impacted by this work; however, eight areas have structures that may have been damaged during the project. The applicant proposes to repair/replace the currently serviceable structures for continued use as originally constructed. 3e. Describe the overall project in detail, including the type of equipment to be used: The perimeter road will be graded and covered with rock. Should the existing structures be damaged, they will be replaced in their current dimensions utilizing machinery and hand tools. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes [I No El Unknown(including all priorphases) in thepast? Comments: 4b. If the Corps made the jurisdictional determination, what type ®Preliminary El Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Environmental Name (if known): George H. Wood Professionals, Inc.Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. U.S. Army Corps of Engineers site visit of June 1, 2017 5. Project History 5a. Have permits or certifications been requested or obtained for ❑Yes ® No ElUnknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. Page 3 of 11 PCN Form — Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 4 of 11 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 []PMT ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 0 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 0 3i. Comments: Page 5 of 11 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary 01 ❑P❑T 02 ❑P❑T 03 ❑P❑T 04 ❑P❑T 4f. Total open water impacts 0 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: S. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar -Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required. 61 [-1 POT El Yes ❑ No B2 ❑P❑T ❑Yes ❑ No B3 ❑P❑T El Yes ❑ No 6h. Total buffer Impacts 6i. Comments: Page 6 of 11 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Only structures damaged will be replaced in their current dimension and for their current use. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. If adjacent land is disturbed, silt fence will be utilized to avoid siltation into wetlands. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ® No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: S. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form —Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer ❑ Yes ® No mitigation? If yes, you will have to fill out this entire form — please contact the State for more information. 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 8 of 11 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ®Yes E] No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0 % increase 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Does not meet the minimum requirement for authorization. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Pitt -Greenville ❑ Phase II 3b. Which of the following locally -implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ® Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ® Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ® No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ® Yes ❑ No Page 9 of 11 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 10 of 11 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ® Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ®Yes ❑ No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. ® Raleigh ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Web Page 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? 7 -2yes ❑ No 8b. If yes, explain how project meets FEMA requirements: Fill is minimal and does not impact the flood capacity of the flood zone. 8c. What source(s) did you use to make the floodplain determination? FEMA maps Applicant/Agent's Signature Applicant/Agent's Printed Name Date (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 11 of 11 Legend Potential In -Kind Point Repair 0 Approximate Limits of Shoulder Grading Approximate Pipe Rehabilitation Work Limits Area of Potential Effect Includes Permanent and Termporary Construction Impacts Airport Property Line 1 %`LI �a Paving Limits 0 Environmental Professionals Inc. - + r 1 Preliminary Wetland/Stream Areas" Areas Identified During Site Visit 2/21/2017 as Possible 404 Wetland Impact Area Feet August, 2017 arrnr: r•s asp „ • c ``j Environmental Professionals Inc. Areas of Interest Potential Repair Sites Pitt -Greenville Airport Pitt County Runway 2-20 Rehabilitation Short Form Environmental Assesment