Loading...
HomeMy WebLinkAbout20171150 Ver 1_PCN Form Submission_20170908Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 9/8/2017 5:36:15 PM (Start Event) Accept by Carpenter,Kristi 9/8/2017 5:48:07 PM (DOT Initial Review) • The task was assigned to Carpenter,Kristi . The due date is: September 13, 2017 5:00 PM 9/8/2017 5:36 PM �� � 6fvlslaa of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 28, 2017 Ver 1.8 * Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red. Below is a link to the DRAFT online help file. http://edocs.deq.nc.gov/WaterResources/0/doc/549884/Page1.aspx A. Processing Information County (or Counties) where the project is located:* Transylvania Is this a NCDOT Project?* �' Yes �' No (NCDOT only) T.I.P. or state project number: 17BP.14.R.125 WBS # 176P.14.R.125 (for f�1CDOT use only) � 1a. Type(s) of approval sought from the Corps:* rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: NWP Number Other: List all MN nurrbers you are applying for not on the drop dow n list. 14 - Linear transportation 1c. Type(s) of approval sought from the DWR:* check all that apply � 401 Water Quality Certification - Regular � Non-404 Jurisdictional General Permit r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: I For the record only for Corps Permit: 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? * l" Yes C•' No C' Yes C•' No If so, attach the acceptance letter from rritigation bank or in-lieu fee program C' Yes C•' No 1f. Is the project located in any of NC's twenty coastal counties?* C' Yes �' No B. Applicant Information 1a. Who is the Primary Contact?* Dave McHenry 1b. Primary Contact Email:* dgmchenry@ncdot.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (828)586-2141 1d. Who is applying for the permit? r% Owner r Applicant (other than owner) r AgenUConsultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: NCDOT Division 14 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) 2d.Address Street Address 253 Webster Road Address Line 2 �� Sylva Fbstal / Zip Code 28779 2e. Telephone Number: (xxx)xxx-xxxx (828)586-2141 2f. Fax Number: (xxx)xxx-xxxx 2g. Email Address:* dgmchenry@ncdot.gov State / R-ovince / F�gion NC Country USA C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Replace Transylvania Bridge Number 90 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town:* Rosman 1d. Driving directions* If it is a new project and can not easily be found in a C� rrnpping system Rease provide directions. Take US 64 from Rosman in Transylvania County, turn left on SR 1152 Upper Whitewater Road and travel about 5 miles to bridge 90. 2. Project Identification 2a. Property Identification Number: (tax RN or parcel ID) 2b. Propertysize: (in acres) 0.1 2c. Project Address Street Address Address Line 2 �' Fbstal / Zip Code State / Rovince / F�gion Country 2d. Site coordinates in decimal degrees I Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) � Latitude:* 35.079767 ex:34.208504 3. Surface Waters Longitude:* -83.008622 -77.796371 3a. Name of the nearest body of water to proposed project:* Thompson River 3b. Water Resources Classification of nearest receiving water:* C Tr Surface Water Lookup 3c. What river basin(s) is your project located in?* Savannah River Basin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project area is forested with a few scattered single family residences. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) C7ick the upload button or drag and drop files here to attach docurrent Tran 90 Topo.pdf 471.69KB Fle type rrust be pdF 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) qick the upload button or drag and drop files here to attach docurrent Tran 90 soils.pdf 534.75KB Fle type rrust be pdf 4d. List the total estimated acreage of all existing wetlands on the property: 0 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 150 4f. Explain the purpose of the proposed project: The purpose of this project is to replace an obsolete/deficient timber bridge. 4g. Describe the overall project in detail, including the type of equipment to be used: The road will be closed. Erosion control measures will be installed where possible.The old bridge deck will be removed and temporary stream diversions installed around the end walls using a track-hoe. Then the old end walls will be removed, new culvert footers constructed, and the new culvert sections installed with crane or track- hoe. Rip rap will be installed along the footers for channel stability and where shown on disturbed stream banks upstream and downstream of the culvert for bank stability. 4h. Please upload project drawins for the proposed project. qick the upload button or drag and drop files here to attach docurrent Trans 90 permit plan set.pdf 4.47MB Fle type rrust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* C' Yes C' No f Unknown Comments: Division 14 Environmental Staff 5b. If the Corps made a jurisdictional determination, what type of determination was made? * C' Preliminary c' Approved r Unknown Corps AID Number: Exarrple: SAV�2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5d1. Jurisdictional determination upload Qick the upload button or drag and drop files here to attach docurrent Fle type rrust be FflF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C' Yes C•' No �' Unknown 7. Future Project Plans 7a. Is this a phased project?* C' Yes C•' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. I No D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands rJ Streams-tributaries r Buffers r Open Waters r Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. Row 1 Row 2 3a. Site #- 3b.lmpact 3c. Type of 3d. Stream 3e. Stream 3f. 3g. Stream 3h. Impact Reason for type impact name Type Jurisdiction width length impact type 1 P Bank Thompson Perennial Both Average 110 N�p label (e.g. F�rrranent (F'� or Stabilizatio Rive r F2rennial (Fff� or 25 (linear feet) Fd�ad C7ossing 1) Terrporary (� n interrrittent (IfV� (feet) 1A T Dewatering Thompson Perennial Both N�p label (e.g. F�rrranent (P� or Rive r F�rennial (� or 13�ad CYossing 1) Terrporary (� interrrittent (IfVn "" All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 110 3i. Total temporarystream impacts: 125 3i. Total stream and tributary impacts: 235 3j. Comments: Average 125 25 (linear feet) (feet) 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 5. Pond or Lake Construction If pond or lake construction is proposed, then complete the chart below. 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* The bridge is being replaced with another bottomless structure to minimize aquatic life passage. An off-site detour is being used to minimize the length of structure needed for staging. The new structure will be shifted slightly upstream of the existing structure to avoid the rock cliff habitat and riparian area. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* i Erosion controls will be used and maintained. Excavation in flowing water will be avoided using temporary diversions. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C' Yes �' No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: This is a bottomless structure with only minimal permanent impacts associated with rip rap for stream and bank protection. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1a. Does this project require a Stormwater Management Plan? C•' Yes C' No 1b. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: NCDOT NCS000250 1c. What is the overall percent imperviousness of this project? 50 % 1d. Who will be responsible for the review of the Stormwater Management Plan?* r Certified Local Government fJ DWR 401 & Buffer Permitting Branch 2. Diffuse Flow Plan r DEMLR Stormwater Review r DWR Transportation Permitting Branch 2a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection I Rules? C' Yes If no, explain why: C•' No This project is not in Catawba or Neuse Basins. Storm drainage will be routed to vegetated swales and vegetated riparian buffers. 5. DWR 401 Stormwater Review Sa. Is the Stormwater Management Plan (including BMP Supplemental Forms and Operation and Maintenance Agreements) attached? C' Yes C•' No Stormwater Management Plan Upload aick the upload button or drag and drop files here to attach docurrent file type rrust be pdf G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* G Yes C' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?* C' Yes C•' No Comments:* MCC document was prepared. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * C' Yes C•' No 2b. Is this an after-the-fact permit application?* C' Yes �' No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* C' Yes C•' No 3b. If you answered "no," provide a short narrative description. I This project is a replacement of an existing stream crossing on an existing gravel secondary road without an increase in road capacity which could accommodate more traffic. 4. Sewage Disposal (DWR Requirement) 4a. Describe, in detail, the treatment methods and dispositions (non-discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. port-o-joins - no permanent wastewater generated 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? * f Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* C' Yes C•' No 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. Is this a DOT project located within Division's 1-8?* �' Yes C� No Se. Will you cut anytrees in order to conduct the work in waters of the U.S.?* C•' Yes C' No 5f. Does this project involve bridge maintenance or removal?* C' Yes C' No 5f(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? Representative photos of signs of bat use can be found in the NLEB SLOPES, Appendix F, pages 3-7. C•' Yes C' No Link to the NLEB SLOPES document: http://sav�reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf If you answered "Yes" to 5f(7), did you discover any signs of bat use?* C' Yes �' No C' Unknown If yes, please show the location of the bridge on the permit drawings/project plans. C7ick the upload button or drag and drop files here to attach docurrent Fle rrust be FDF 5g. Does this project involve the construction/installation of a wind turbine(s)?** C' Yes �' No If yes, please show the location of the wind turbine(s) on the permit drawings/project plans. C7ick the upload button or drag and drop files here to attach docurrent Fle rrust be FDF 5h. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?* G Yes C' No If yes to either, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property. aick the upload button or drag and drop files here to attach docurrent Tran 90 NWP 14 cover letter.pdf Fle rrust be FDF 323.47KB 5i. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* NHP, USFWS, and personal expertise/surveys 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes C•' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NMFS 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina historyand archaeology)?* C' Yes C•' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NCDOT HEU reviews/screenings i 7c. Historic or Prehistoric Information Upload aick the upload button or drag and drop files here to attach docurrent 10-08-0061_NoSurveyReq.pdf 3.42MB i 13-08-0061 Transylvania.pdf 10.34MB Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* C' Yes C•' No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination?* NC Floodmaps - NCDOT Hydraulic Unit Miscellaneous attachments not previously requested. Gick the upload button or drag and drop files here to attach docurrent Tran 90 pictures.pdf 945.85KB Fle rrust be FDF Signature * rJ By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Dave McHenry Signature � Date 9/8/2017 Initial Review Is this project a public transportation project? �' Yes C' No Only change this if the project has been reassigned. Has this project met the requirements for acceptance in to the review process?* �' Yes C' No BIMS # Assigned* 20171150 Version#* Reviewing Office * Asheville Regional Office - (828) 296-4500 Select Project Reviewer* Kevin Barnett:eads\khbarnett