Loading...
HomeMy WebLinkAbout20171146 Ver 1_Build Maps_20170908HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 12+21 TO 12+47-L- 1 @ 25' 2" 0.0 0.0 0.0 0.0 0.0 <0.1 0.0 37.0 0.0X 7'0" CAABC 2 12+10 TO 12+60-L- Excavation with63.0Floodplain Bench3 12+26 TO12+37 Pump Around29.04 12+34 TO 12+48 Pump Around9.0TOTALS: 0.0 0.0 0.0 0.0 0.0 <0.1 0.0 100.0 38.0 0.0ATN Revised 3/31/05SHEET 4/12/2016BUNCOMBE COUNTYBRG. 217 OVER GRASSY BRANCHNC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYSALONG SR 2401 (OLD FARM SCHOOL RD.) WETLAND PERMIT IMPACT SUMMARYSURFACE WATER IMPACTSWETLAND IMPACTS