HomeMy WebLinkAbout20160499 Ver 1_Certification of Completion_20170728r PAT MCCRORY
DDONALD R. VAN DER VAART
JUL 2 8 2017
Water Resources S. JAY ZIMMERMAN
ENV IROWENTAL GOAL 7Y
DEQ- A R R SOUR ES
4 1 BUFF R PE MITT N
DWR Project No: 16-0499 County: Brunswick
Applicant: Village of Bald Head Island
Project Name: Row Boat Row Shoreline — Bald Head Island
401 Water Quality Certification Issued Date: 5 July 2016
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR
401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: Date:
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
I, Erik J- Olsen , as a duly registered Professional Engineer (i.e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to
observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that,
to the best of my abilities, due care and diligence was used in the observation of the construction such
that the construction was observed to be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature: Date: 25 July 2017
61-111' ri
State of North Carolina I Environmental Quality I Water Resources
1611 Mail service Center I Raleigh, North Carolina 27699-1611
9197079000