HomeMy WebLinkAbout20141169 Ver 7_In Field Mod_20170522Carpenter,Kristi From: Johnson, Jay B Sent: Monday, May 22, 2017 4:50 PM To: Steffens, Thomas A SAW (Thomas.A.Steffens@usace.army.mil); Ward, Garcy; Lane, Stephen Cc: Vorwerk, Paul J; Mcmannen, Brad T Subject: FW: Permit at Deep Gulley Attachments: Pages from R2514B-C-D 700 Project Proposal.pdf; 5-4631-163 Cover Sheet.pdf Follow Up Flag: Follow up Flag Status: Completed FYI From: Vorwerk, Paul J Sent: Monday, May 15, 2017 4:41 PM To: Johnson, Jay B Cc: Mcmannen, Brad T; 'jackson.provost@summitde.net' Subject: FW: Permit at Deep Gulley Jay, Attached is a request from BBI for a reduction in temporary impacts at Deep Gulley (R2514D). They plan on accomplishing this by building a 3-span work trestle. Please let me know if you need anything else. Thanks, Paul From: Distefano, Peter [mailto:PDistefanoCa�bbiius.com] Sent: Monday, May 15, 2017 4:32 PM To: Mcmannen, Brad T; Vorwerk, Paul J Cc: Jackson Provost Subject: Permit at Deep Gulley Gentlemen, I tried to get feedback from Mr. Steffens on this scenario, but I am now told he is out for a period of time. With that said, attached is a change that we would like to implement at the Deep Gulley Structure. After hearing the concerns of the agencies regarding the water level fluctuations at this location as well as the historic sediment losses on past projects, we do not want to use the planned 3000 SF of "Temporary Impacts" shown in the permit for this structure location. Instead we would like to install 3 spans of work trestle as shown and highlighted Green in the attached. Our impact within that green area would be limited to the necessary 24" trestle piles and would total less than 50 SF of impact area. We do plan to begin this installation the week of June 5t". In the past, we have made changes in work access plans reducing impact areas and we have not needed permit modifications. However due to this timeline we are hoping you verify that this change would be acceptable and let us know as soon as possible so that we can make preparations to move in one direction or the other. Thanks, Peter D. Distefano � Balfour Beatty Infrastructure, Inc. EA to: NC 133 Extension Project Manager � Maysville Bypass Project Manager T: 910-452-1145 � M: 910-367-7800 � E: pdistefano@bbiius.com 430 Eastwood Rd. Wilmington, NC 28403 www.bbiius.com � Linkedln ���ur� ��tty Inh+astructime Ir�. 8�,��� �� �ast �ean. �x�e�r.r��s�e�. s��e. Confidentiality Notice: The contents of this e-mail are confidential and are intended only for the use of the recipient(s) unless otherwise indicated. If you have received this e-mail in error, please notify the sender(s) immediately by telephone. Please destroy and delete the message from your computer. Any form of reproduction, dissemination, copying, disclosure, modification, distribution and/or publication of this e-mail is strictly prohibited unless expressly authorized by the sender(s). No person, without written confirmation of the contents of this e-mail, should rely on it. While this e-mail and the information it contains are supplied in good faith, no member of the Balfour Beatty plc group of companies shall be under any liability in respect of the contents of this e-mail or for any reliance the recipient may place on it. This e-mail is sent for information purposes only and shall not have the effect of creating a contract between the parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. BBI-EVW JV ��I_�v� �� Submittal Balfour Beatty Infrastructure, Inc. �-4�3�—��3 and EV Williams, Inc. Joint Venture Number'. PO Box 40 (146 Deerfield Trail) Date: 5/15/17 Maysville NC 28555 Attention: Brad McMannen, P.E. From: Peter D. Distefano Tel No. 910-595-4035 Project name: Maysville Bypass Fax No. 910-595-4603 Contract ID: C203697 Description of Contents: Deep Gulley Access Pages in Document Date (including this one) ❑ As requested Q Attached 2 5/15/17 ❑ Under separate cover For your: ❑ Records Memo: ❑ Use and information Q Approval ❑ Review and comment ❑ Use and distribution Sent Via: ❑ Overnight mail Q E-mail Remarks / Comments: ❑ U.S. Mail ❑ Hand delivered to NCDOT Office Signed as received: ❑ Fax Fax number: Copies to: Division / Field Submittal File / Number of pages in Fax Reading File (including any cover): Sender Signed: ��%-��� Sender Printed: Peter D. Distefano � �� � � � � -ts" � t �r,-,_��-,s���' ��� �. ' i�. �� �� GRASS SWALE DATA " E���E� E��H� .,.�( � �? E � �� DA= 0.91 AC PAV. � 0.13 AC GRASS 9y �� .,u � � �� 2.95 AC OFFSITE � �� �_� SLOPE= 0.003 FTiFT [R��iMiN_ aq P�n.Ns NOTE:NO DECK DRAINS li � I I/ . L REQ.= 399 FT i L PRO.= 280 FT REQUIRED FOR THIS i Q .��� �', . � , �� �� (�2= 8.0 CFS �N�V � �N�RV�'oN CHORD w srRucruaE �ITE � V �� �'�' � R I / i V2 = 1.4 FTiS � eti� �g �,� v�i'o= i's Fh BUFFER DRAWING C� �� ` 'f srn. ie+zs ro is+o5 RT -vioaPn- $HEET 20 OF 20 F � WORK ACCESS � � �, � ' � , � �� '� � 1 — — ____ F_ F � � 11 � � D —__ F iC �� � �� 2' BASE LATERAL GRASSED SWALE � � � SEE DETAIL 'Q' W 0 ��{����j� �/ - _ � � W � -BDO � M 4 I a � �� � / O i �� /,' � a1 —Y/ORPq— ,.tr�Y `" ,--------___ ; --------- --- zci � GRA �� _ �� � �`i� i; ��- �/ "' 1 „ RCP-IV 2GI �C[� � i ----- ,�I � � -Ji 1 - — F — —_ _��r�'r— � � ,'r�P�I.�r� - OTCB � �Ii - o F � � _�. i�r�urpi �' — � - � - e- �' r(I��' F o F 1 �-� � �� � � � � � � T �-T_ � - L _T� - ��� -T_. _�_--� r / T T T _ T -�: . _ — L � L�T .� � � T L — --- — \ �.' — ��--�% � ... —_ � � � - - --� �- � - - � ` , I /—� --- -- �- � ' RETAIN II F OV RETAIN � I � � � I� — — — — .— � / L__ � /�r��' � � — —� �— _—,-�_ ' �- =l� . i � T �_7� --- (JL�T� i � r i — - N / , I - �� — � - DI -L- � - /� � u' P IL W '-- -_ - �— �- - s- -64 i5" HDPE � � .' i j-' � i � FLOWABLE FILL —� -J - �_.-= i ._ ��_� '� r � �� � � � T � L��� T �_r � � L � - _ =--._-c "_ -. _ // _ � - _ --- - � ... T . T -H- ~ -- - — _ �� — - �� �� �� � ,l; 7---- � � \ I� — — � � � � � R�OVE �� RETA -���F-- l , � � Bz� < � � � - - - - TB 2GI -- —. — i ' � . .. _ -�— -- 2GI � B 2GI 2GI 15" RCP-IV CAT-1 `b// II"' ,� ' � U! � ES � 5 ` ' ,� F�L '. �i'lj u ai1,��LUJu . '�I 15" RCP-IV � �' � �, �� �� �� � o � � �_iii ii i iiiii u0aiii u 33 ���� II° �3 i � �, �� � A�' � <<<�{a�'� � = o � �' �nm � � �� �� ��� y��.l�u��i u,!W�"���" F � v'm ----F �"--- F r �p � ' F � � �i ` �\ �� � \ _. � � � _ � � � � � � FS � 2G1 F - L ----�—_ � �� � � _ � — - � i'� jl � �% \ r-w� „ ,a -__ -�- A T � V�ORife�A�C�ESS ��il_ �� � W' RK �ACC�SS � � �. GMIPHIC SCALE ���{�� ALLOWABLE IMPACTS ZONE 1;` C � l � i �� Z , I ,�� � 4' BASE LATERAL GRASSED SWALE ���� rJO ZrJ O rJO �OO \VA\VA ALLOWABLE IMPAGTS ZONE 2� r.°', � � i SEE DETAIL'A' ��`w _�q„ WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 22 26+07 to 26+67 0.02 -Y10RPA- 23 19+00 to 20+00 BRIDGE <0.01 0.01 0.17 -Y10RPA- Bank Stabilization 624+49 to 625+64 BRIDGE 0.02 -L- 627+15 to 627+40 Grassed Swale <0.01 0.01 0.02 -L- TOTALS: 0.02 0.00 0.01 0.03 0.18 0.00 0.00 0.00 0.00 0.00 OVERALL PROJECT TOTALS: 13.82 0.07 0.07 1.29 2.02 0.23 0.02 1953.00 170.00 0.00 Structure @ Sta. 18+43 to 20+43 -Y10RPA- - 15ftZ permanent impacts - 3000 ft2 temporary impacts Strucure @ Sta. 623+81 to 626+31 -L- - 70ft2 permanent impacts - 3900 ftZ temporary impacts Revised 3/31/OS � 1 N �O N