Loading...
HomeMy WebLinkAbout20171139 Ver 1_17BP 3 R46_Onslow_181_Permit Drawings Rev 20170831_20170908I II�;h�N�ly North Carolina Department of Transportation ���—� /"` \ btOYYY1W�lt�1" ' �,j „,,.,,,,,, Highway Stormwater Program � � STORMWATER MANAGEMENT PLAN �=^%' (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: 17BP.3.R.46 TIP No.: County(ies): Onslow Page 1 of 3 General Project Information WBS Element: 17BP.3.R.46 TIP Number: Project Type: Bridge Replacement Date: 10/21/2016 NCDOT Contact: Robert T. Turnbull, Enviornmental Services, Inc. Contractor / Designer: HNTB North Carolina, P.C. / James A. Byrd, PE Address: 4901 Trademark Dr. Address: 343 E. Six Forks Road Raleigh, NC 27610 Suite 200 Ralei h, NC 27609 Phone: 919 212-1760 Phone: 919 424-0437 Email: rturnbull esinc.cc Email: 'ab rd hntb.com Cit ITown: Count ies : Onslow River Basin(s): White Oak CAMA County? Yes Wetlands within Project Limits? Yes Pro'ect Description Project Length (lin. miles or feet): 0.109 mi. Surrounding Land Use: Agriculture / Suburban Proposed Pro'ect Existin Site Pro'ect Built-Upon Area ac. 0.4 ac. 0.3 ac. Typical Cross Section Description: 2- 12' asphalt paved lanes, 2- 4' paved apshalt shoulders, and 2- 2' grassed shoulders. 2- 12' asphalt paved lanes with grasses shoulders. Roadside ditches exists in the Roadside ditches are retained and amened in two quadrents with 3: 1 slopes and northeast quadrant and the southeast quandrant and tie into wetlands prior to the continues to tie to wetlands prior to Branch to Turkey Creek. Branch to Turkey Creek. Annual Avg Daily Traffic (veh/hr/day): Design/Future: 9800 Year: 2032 Existing: 4900 Year: 2012 General Project Narrative: State project 17BP.3.R.46 involves the replacement of Bridge #660181 on SR 1518 (Old Folkstone Rd.) over Branch to Turkey Creek in Onslow County, NC. The existing (Description of Minimization of Water bridge #660181 consists of 3@ 25' - 0" prestressed concrete channels. It is to be replaced with a 1@ 25' - 0", 1@ 60 - 0", 24" cored slab bridge (85' total length, 36' total width) Quality Impacts) at the same location. The project also includes 0.093 miles of roadway improvements on each end of the bridge. The proposed bridge does not contain deck drains, all storm water from the bridge approaches will be collected by storm drainage system discharged into a preformed scour hole in the southwest quadrant at -L- 20+45 RT. The eastern quadrants both contain ditches that are impacted by the propsed roadway design. To maintain existing conditions the'V' ditches have been designed to tie to the wetland boundaries with a segment of variable width base ditch. This provides time and space to disapate the concentrated ditch flow prior to it entering the wetlands. Waterbody Information Surface Water Body (1): Branch of Turkey Creek NCDWR Stream Index No.: 18-87-1 NCDWR Surface Water Classification for Water Body Primary Classification: Class SA Supplemental Classification: (ORW) Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) HighWcly North Carolina Department of Transportation / G ,a ,,, Stormwater �j Y ., �,,, „<<,,,,.,,, Highway Stormwater Program ; _ STORMWATER MANAGEMENT PLAN ���"�"�� (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: 17BP.3.R.46 TIP No.: Count ies : Onslow Page 2 of 3 Swales Station & Coordinates Surface Base Front Back Drainage Recommended Actual Longitudinal Rock BMP Sheet (Road and Non Road Water Width Slope Slope Area Treatm't Length Length Slope Q2 V2 Q10 V10 Checks Associated w/ No. Pro'ects Bod it H:1 H:1 ac ft ft (%) cfs (fps) (cfs f s Used Buffer Rules? 4 -L- 22+g0 LT (1)Branch of 0.0 3.0 3.0 2.4 240 1080 4.78°/ 1.8 2.7 2.5 2.9 No No 34.5253 / -77.4597 Turkey Creek 4 -L- 23+17 RT (1)Branch of 0.0 3.0 3.0 2.9 290 1030 3.22°/ 1.9 2.3 2.6 2.5 No No 34.5251 / -77.4596 Turkey Creek Additional Comments Hi hwa North Carolina Department of Transportation ��� � �Stormwater � � ,,,�,,,..., Highway Stormwater Program ��� STORMWATER MANAGEMENT PLAN ��"='�'"% (Version 2.07; Released October 2076) FOR NCDOT PROJECTS WBS Element: TIP No.: County(ies): Onslow Page 3 of 3 Preformed Scour Holes and Energy Dissipators Station & Coordinates Drainage Pipe/Structure BMP Sheet (Road and Non Road Surface Energy Dissipator Area Conveyance Dimensions Q10 V10 Associated w/ No. Pro'ects Water Bod Type Riprap T pe ac Structure (in) (cfs) (fps) Buffer Rules? 4 -L- 20+45 RT (1)Branch of Riprap Energy Class'B' 0.1 Pipe 15 0.8 0.2 N/A 34.5249 /-77.4602 Turkey Creek Dissipator Basin Additional Comments � Refer to the NCDOT Best Management Practices Toolbox (2014), NCDOT Standards, the Federal Highway Administration (FHWA) Hydraulic Engineering Circular No. 14 (HEC-14), Third Edition, Hydraulic Design of Energy Dissipators for Culverts and Channels (July 2006), as applicable, for design guidance and criteria. � � ; ro 15" RCP-IV MECHANIZED CLEARING IN WETLANDS = <0.07 Ac /405 SF HAND CLEARING IN WETLANDS = 0.0 Ac /0 SF FILL IN WETLANDS = <0.01 Ac/112 SF EXCAVATION IN WETLAND = <0.01 Ac /79 SF 30 20 �� 0 C�ZE '�-'°" WETLAND & STREAM IMPACTS � 1^ C "� - � -� AE�' �� / �TURBIDITY � CURTAIN Q 2Q CLASS 'B' RIP-RAP BEGIN / END / o - EST. 10 TONS �' SAFETY FENCE BEGIN / END EST.2o svGF � � � � -L- STA19+86 /LT) � _ � " � � i SAFE7Y FENCE q � STA22+44 (LT � �' r � � Y � �y \ � � VAR.WID7H - -n - 1, 1 � � � � y `� m - � SPECIAL L4T. �y � �'- t �. � �� , ., � i � �a BASE DITCH . � � � � � � � � � 1 ��� '� w 1 �i, SEE DETAIL 1 ,. ,_ � ,, ; � ` ` � • . � � � , , � � ,_ w � � ,. , BORE PiT� _ ---- , . �. . 1 .._.. , � PDE F � 15�RC.. I�. �Ar�Y �. S�� ".. C .- r�.. �. � - BEGIN CONSTR UCTION - ___ �- - - - BEGIN TIP PRO ECT 17BP.3.R.46 "� --� -L- POC STA 19 + 00.00 � LEGENp � DENOTES MECHANIZED CLEARING � DENOTES FILL IN WETLAND � DENOTES EXCAVATION IN WETLAND � DENOTES HAND CLEARING W3 MECHANIZED CLEARING IN WETLANDS = 0.0 Ac /0 SF HAND CLEARING IN WETLANDS = 0.0 Ac /0 SF FILL IN WETLANDS = 0.0 Ac /0 SF EXCAVATION IN WETLAND = 0.0 Ac /0 SF OTE: THERE IS A MORATORIUM IN PLACE FOR ALL IN WATER WORK FROM APRIL 1ST TO SEPTEMBER 30Th 15+00 16+00 BM#1 -L- STA 19 + 79.13, 46.03' R� RR SPIKE IN 8" GUM TREE ELEV. = 12.57' a� W 0 �5;, RICP-I� Y 1. a, yY � Y �� � �-' BORE PlT � � � � � � �g�� � � � � � � � � e BEGIN / END i -�' '�t� BEGIN / END � - � � SAFETY FENCE �� " � � - \ SAFETY FENCE -L- STA20+78 lRTI � � �y, \ -L- STA.22+88 (RT) � BORE� lT 1 CLA55 '6' RIP-RAP CLA55 'B' RIP-RAP EST. 1 TON EST.10 TONS EST.S SYGF EST.25 SYGF DETAIL 1 VAR. WIDTH SPECIAL LATERAL BASE DITCH � He� io s<aie� No�urol Gro�n �7:/ 3.1 � < S�lope d � F\tl e Geo�e.ada g M n. D= 0.75 to 0.0 Ft Max. d= 0.75 Ft. 8= 0.0 to 8.0 Ft. iype of Liner= Class'B' Ri�Rap FROM -L- $TA.22+60 TO STA. 22+80 LT FROM -L- STA 22+97 TO STA 23+17 RT BEGIN GRADE -L- STA 19+0 FiFv - ia nF � �� ��liiiiiiiiii � �iiiiiiiiiii ���������� ��������� � �Y���� �e �- .. ...... ...... .,-..�� -.��� ...-- � (-)7.0444' ,�, BRIDGE HYDRAUUC DAT A � DESIGN DISCHARGE = 700 CFS DESIGN FREQUENCY = 25 YRS DESIGN HW ELEVATION = 8.5 FT BORE PIT BASE DISCHARGE _ 1000 CFS SIZE DETERMINED BY CONTRACTOR BASE FREOUENCY = l00 YRS BASE HW ELEVATION = 9.36 FT OVERTOPPING DISCHAR6E _ 1500 f+J CFS OVERTOPPING FREQUENCY= 500(+) YRS OVERTOPPING ELEVATION = /3.38 FT DATE OF SURVEY = 06/08/20/6 WS. ELEVATION AT DATE OF SURVEY = 4� FT 17+00 18+00 19+00 EXCAVATION yqR. WIDTH LIMIT �NP.) SPECIAL LAT. DETAIL 2 BASE DITCH SPECIAL LATERAL 'V' DITCH SEE DETAIL 1 � Ho�,o sco�el Nalural � 1 °� Fill Ground 3;� p F�o s� Slop� Min. D- 0.75 Ft. FROM -L- STA.22+80 TO STA. 24+00 LT FROM -L- STA. 23+17 TO STA. 25+50 RT - L- WS EL.= 4.8' Sl1RVEY 06-OS-16 (+)0.6776% �EXCAVATE TO - EL = 6.9' . EXCAVATE TO EL - 5.7' MATERIAL TO 6E REMOVED DIRECTIONAL BORE 8" WL 20+00 � + � � Q N �Q m� Zw'� � W J __- _ _ZJ m I w I BEGIN VAR. WIDTH SPECIAL LAT. BASE DITCH fLT) PI =22+60.00 EI =10.00 21+00 22+00 G�INTB HNTB NORTH CAFOLINA, P C. PROJECT REFERENCE NO SHEET NO. G 3a3 E Six Forks Foad, Suite 200 aaie�9n, No�tn ca�oi��a z�sos 17BP.3.R.46 4 NC License No: C-1554 p�W SHEETNO. SCALE /" = 40' ROADWAY DESIGN HYDRAULICS i .. F{, . . �, ENGINEER ENGINEER SPECIAL LAT.'V' DITCH SEE DETAIL 2 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 'E MECHANIZED CLEARING IN WETLANDS = <0.01 Ac /308 SF -��IHAND CLEARING IN WETLANDS = 0.01 Ac/487 SF � FILL IN WETLANDS = <0.01 Ac /307 SF �To ` EXCAVATION IN WETLAND = <0.01 Ac /92 SF REiAIN SPECIAL LAT.'V' DITCH SEE DETAIL 2 SCALE l' = 40' -c � �. � . . . ...._.. � ... I� o � END TIP PROJECT 17BP.3.R.46 -L- POC STA 24 + 75.00 W4 MECHANIZED CLEARING IN WETLANDS = 0.01 Ac /480 SF �HAND CLEARING IN WETLANDS = 0.0 Ac /0 SF FILL IN WETLANDS = 0.03 Ac /1223 SF EXCAVATION IN WETLAND = <0.01 Ac /19 SF �� � LEFT DITCH - •- - -� -� - R1GHT DlTCH ----------- END GRADE A 24+75.00 - EV_ = 19 20 + ) 0.0000 % PI = 23+55.00 EL = 15.42' VC = 240' K = 97 V = 50 MPH (+) 0.0000% _""__ � ....... j50% 1+13.1491% _ i+)3.2195% , ,..,..._..,•��+1 `! � - - - - - ' END SPECIAL END SPECIAL LAT. 'V' DITCH lT LAT. 'V' DITCH RT � ' PI =24+00.00 PI =25+50.00 EI=15J3 EI=17.46 END VAR. WIDTH SPECIAL LAT. BASE DITCH RT BORE PIT BEGIN SPECIAI LAT.'V' DITCH (RT) SIZE DETERMINED PI =23+17.00 BY CONTRACTOR EI = 9.96 BEGIN VAR. WIDTH SPECIAL LAT. BASE DITCH RT PI =22+97.00 EI = 9.96 END VAR. WIDTH SPECIAL LAT. BASE DITCH LT i �EGIN SPECIAL LAT. 'V' DITCH jLT) I =22+80.00 EI =10.00 23+00 24+00 25+00 26+00 27+00 MATERIAL TO BE REMOVED 28+00 30 20 10 0 -�� � � ; ro 15" RCP-IV MECHANIZED CLEARING IN WETLANDS = <0.07 Ac /405 SF HAND CLEARING IN WETLANDS = 0.0 Ac /0 SF FILL IN WETLANDS = <0.01 Ac/112 SF EXCAVATION IN WETLAND = <0.01 Ac /79 SF 30 20 �� 0 C�ZE -� BEGIN CONSTR UCTION BEGIN TIP PROJECT I7BP 3 R 46- -L- POC STA 19 + 00.00 LEGEND � DENOTES MECHANIZED CLEARING � DENOTES FILL IN WETLAND � DENOTES EXCAVATION IN WETLAND � DENOTES HAND CLEARING W3 MECHANIZED CLEARING IN WETLANDS = 0.0 Ac /0 SF HAND CLEARING IN WETLANDS = 0.0 Ac /0 SF FILL IN WETLANDS = 0.0 Ac /0 SF EXCAVATION IN WETLAND = 0.0 Ac /0 SF ----_ S��E,�='°" WETLAND & STREAM IMPACTS i * ; _ .�..� ....i'� � _ _� - - � . , � ryO1 � �TAE�t� �� ,C � TURBIDITY �� � CURTAIN Q ' rl ��;:;-- �Q� CLASS 'B' RIP-RAP BEGIN / END - - EST. �0 TONS � SAFETY FENCE \ � � BEGIN / END EST.2o svGF - .y � � -L- STA19+86 /LTl �� � '� SqFE7Y FENCE � 1 , ' T L- A �� . � � � � ; � + vnR.wiom � ' n � y � � � y. R.� - a� SPECIAL LAT. � '- t Y 1 �. '� .. .,' , 'C '� BASE DITCH -...� �. i ... i y .,; � �- � � { '- � . � �, SEE DETAIL 1 = � � ` r � I � , '. / � w �� -� < - �,� , - - �„� .i• �,.rr''.,�,��.���.+�r:i�c�c . ,.. �.�,�:i;oro�,�� ri� �+ . / �,_ � `. i - -� �� ' �"1 .a � 1i/- �� �•i � .,� - . ��1... 'F'i.-�� � _ �:•:��� OTE: THERE IS A MORATORIUM IN PLACE FOR ALL IN WATER WORK FROM APRIL 1ST TO SEPTEMBER 30Th 15+00 16+00 BM#1 -L- STA 19 + 79.13, 46.03' R� RR SPIKE IN 8" GUM TREE ELEV. = 12.57' _ ! BBEGINI/ tND � W� � 5 REP-I� } 11{ � v }: � BEGIN /� � 1 � � � � --_..,,`e � � � �� END � � SAFETY FENCE � �" �- � ` SAFETY FENCE � -L- STA20+78 lRTJ � � � y, \ -L- STA.22+88 (RT) � BORE� lT � CLA55 '6' RIP-RAP CLA55 'B' RIP-RAP EST. 1 TON EST.10 TONS EST.S SYGF EST.25 SYGF DETAIL 1 VAR. WIDTH SPECIAL LP.TERAL BASE DITCH � No� to 5<ale) No�urol Gro�n �7:/ 3.1 � < S�lope d � F\tl e Geo�e.ada g M n. D= 0.75 to 0.0 Max. d= 0.75 Ft. 8= 0.0 to 8.0 Ft. pe of Liner= Class'B' Ri�Rap FROM -L- $TA.22+60 TO STA. 22+80 LT FROM -L- STA. 22+97 TO STA. 23+17 RT BEGIN GRADE -L- STA 19+0 FiFv - ia nF � �� ��liiiiiiiiii � �iiiiiiiiiii ���������� ��������� � �Y���� �e �- .. ...... ...... .,-..�� -.��� ...-- � (-)7.0444' ,�, BRIDGE HYDRAUUC DAT A � DESIGN DISCHARGE = 700 CFS DESIGN FREQUENCY = 25 YRS DESIGN HW ELEVATION = 8.5 FT BORE PIT BASE DISCHARGE _ 1000 CFS SIZE DETERMINED BY CONTRACTOR BASE FREOUENCY = l00 YRS BASE HW ELEVATION = 9.36 FT OVERTOPPING DISCHAR6E _ 1500 f+J CFS OVERTOPPING FREQUENCY= 500(+) YRS OVERTOPPING ELEVATION = /3.38 FT DATE OF SURVEY = 06/08/20/6 WS. ELEVATION AT DATE OF SURVEY = 4� FT 17+00 18+00 19+00 EXCAVATION VAR. WIDTH LIMIT �NP.) SPECIAL LAT. DETAIL 2 g45E DITCH SPECIAL LATERAL 'V' DITCH SEE DETAIL 7 � No�+o Scalel ll � Na��.a� , �` F��� Ground 3.� p F�o s� Slapc .�� Min. D- 0.75 Ft. � I FROM -L- STA.22+80 TO STA. 24+00 LT FROM -L- STA. 23+17 TO STA. 25+50 RT '�� - L- WS EL.= 4.8' Sl1RVEY 06-OS-16 (+)0.6776% �EXCAVATE TO - EL = 6.9' . EXCAVATE TO EL - 5.7' MATERIAL TO 6E REMOVED DIRECTIONAL BORE 8" WL 20+00 � + � � Q N �Q m� Zw'� � W J __- _ _ZJ m I w I BEGIN VAR. WIDTH SPECIAL LAT. BASE DITCH fLT) PI =22+60.00 EI =10.00 21+00 22+00 G�INTB HNTB NORTH CAFOLINA, P C. PROJECT REFERENCE NO SHEET NO. G 3a3 E Six Forks Foad, Suite 200 aaie�9n, No�tn ca�oi��a z�sos 17BP.3.R.46 4 NC License No: C-1554 RNJ SHEET NO. SCALE /"= 40' ROADWAY DESIGN HYDRAULICS i .. �'{, . . �, ENGINEER ENGINEER SPECIAL LAT.'V' DITCH SEE DETAIL 2 �E� �I � 'P � GTp REiqIN SPECIAL LAT.'V' DITCH SEE DETAIL 2 SCALE l' = 40' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED MECHANIZED CLEARING IN WETLANDS = <0.01 Ac /308 SF HAND CLEARING IN WETLANDS = 0.01 Ac /487 SF FILL IN WETLANDS = <0.01 Ac /307 SF EXCAVATION IN WETLAND = <0.01 Ac/92 SF --c ....._.. Q � ... // . . // s END TIP PROJECT 17BP.3.R.46 -L- POC STA 24 + 75.00 W4 MECHANIZED CLEARING IN WETLANDS = 0.01 Ac /480 SF HAND CLEARING IN WETLANDS = 0.0 Ac /0 SF �\ FILL IN WETLANDS = 0.03 Ac /1223 SF \. EXCAVATION IN WETLAND = <0.01 Ac /19 SF �� � LEFT DITCH - •- - -� -� - R1GHT DlTCH ----------- END GRADE A 24+75.00 - EV_ = 19 20 + ) 0.0000 % PI = 23+55.00 EL = 15.42' VC = 240' K = 97 V = 50 MPH (+) 0.0000% _""__ � ....... j50% 1+13.1491% _ i+)3.2195% , ,..,..._..,•��+1 `! � - - - - - ' END SPECIAL END SPECIAL LAT. 'V' DITCH lT LAT. 'V' DITCH RT � ' PI =24+00.00 PI =25+50.00 EI=15J3 EI=17.46 END VAR. WIDTH SPECIAL LAT. BASE DITCH RT BORE PIT BEGIN SPECIAI LAT.'V' DITCH (RT) SIZE DETERMINED PI =23+17.00 BY CONTRACTOR EI = 9.96 BEGIN VAR. WIDTH SPECIAL LAT. BASE DITCH RT PI =22+97.00 EI = 9.96 END VAR. WIDTH SPECIAL LAT. BASE DITCH LT i �EGIN SPECIAL LAT. 'V' DITCH jLT) I =22+80.00 EI =10.00 23+00 24+00 25+00 26+00 27+00 MATERIAL TO BE REMOVED 28+00 30 20 10 0 -�� 40 30 2� �� � —� � i , � � � � BEGIN GRADE -L- STA 19 + 00.00 ELEV. = 14.06 MIN. PROP. OH POWER APRROX. i ELEV. = 32.0' Z Z O ° Q PI = 23 + 55.00 o PI = 20 + 00.00 o EL = 15.42' W EL = 13.02' J J O 0 d d � � W WS ELo= 4,8' 3 p SURVEY 06-08-16 � � � X (+)0.6776% ° ___ W _ _ _ - - - - ___ ----_ ' ______���_��� -)1.0444% -- ----� ---- I TO >� EXCA` EL = � MATE BE RE r-- � � � r W � � Q � � + �cyt 10'MIN. pN m � m � — W� ZJ m � w I SCALE: 1'=10' (VERTICAL) 1' = 50' (HORIZONTAL) 18+00 19+00 20+00 3 .� 49�% � 21 + 00 22 +00 23 + 00 DIRECTIONALY BORED PHONE LINE 17BP.3.R.46 ONSLOW COUNTY BRIDGE 181 SR 1518 AERIAL POWER LINE CLEARANCE & UNDERGROUND PHONE LINE 24+00 25+00 20 �� l�J —� � WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- STA. 19+86 TO STA. 22+88 24" CORED SLAB BRIDGE 0.04 0.00 <0.01 0.03 0.01 0 0 0 0 0 TOTALS: 0.04 0.00 <0.01 0.04 0.01 0 0 0 0 0 Notes: Permanent Fill in Wetlands: 1,642 square feet Excavation in Wetlands: 190 square feet Mechanized Clearing in Wtelands: 1,193 square feet Hand Clearing in Wetlands: 487 square feet