HomeMy WebLinkAbout20170952 Ver 1_B-5602 utility plan revised century link_20170821Carpenter,Kristi
From: Willis, Thomas C
Sent: Monday, August 21, 2017 3:39 PM
To: Barnes, Kyle W SAW (Kyle.W.Barnes@usace.army.mil);
Daisey, Greg; Ward, Garcy
Subject: Bridge # 8 in Hyde County, US 264 (Burgess Mil)
Creek -Rutman)
Attachments: B-5602 utility plan revised century link.pdf
Agencies,
I have attached an updated utility drawing for this project, which shows the Century Link
line going aerial on the power poles. The previous drawing I provided with the permit
package, showed the century link line being bored under the creek, that is no longer
going to take place. Once the project is complete, the Century link line will stay aerial on
the power poles. When they install the new pedestal adjacent to the existing power
pole, they will need to temporarily impact approximately 100 sq. ft. of wetland. This will
include a small line installation to make the connection from the road shoulder buried
fiber cable to the new pedestal, adjacent to the power pole.
Let me know if you have any questions about the update.
Thanks,
Clay
NCDOT— Division One
Environmental Supervisor
Office — 252-482-1876
Cell — 252-312-3692
tcwi I I is@ ncdot.gov
I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl
I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a,
I�arti��,