Loading...
HomeMy WebLinkAbout20170952 Ver 1_B-5602 utility plan revised century link_20170821Carpenter,Kristi From: Willis, Thomas C Sent: Monday, August 21, 2017 3:39 PM To: Barnes, Kyle W SAW (Kyle.W.Barnes@usace.army.mil); Daisey, Greg; Ward, Garcy Subject: Bridge # 8 in Hyde County, US 264 (Burgess Mil) Creek -Rutman) Attachments: B-5602 utility plan revised century link.pdf Agencies, I have attached an updated utility drawing for this project, which shows the Century Link line going aerial on the power poles. The previous drawing I provided with the permit package, showed the century link line being bored under the creek, that is no longer going to take place. Once the project is complete, the Century link line will stay aerial on the power poles. When they install the new pedestal adjacent to the existing power pole, they will need to temporarily impact approximately 100 sq. ft. of wetland. This will include a small line installation to make the connection from the road shoulder buried fiber cable to the new pedestal, adjacent to the power pole. Let me know if you have any questions about the update. Thanks, Clay NCDOT— Division One Environmental Supervisor Office — 252-482-1876 Cell — 252-312-3692 tcwi I I is@ ncdot.gov I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a, I�arti��,