Loading...
HomeMy WebLinkAbout20080525 Ver 1_Emails_20081121Re: Terry Walters Subject: Re: Terry Walters From: Joanne Steenhuis <Joanne. Steenhuis@ncmail. net> Date: Fri, 21 Nov 2008 11:29:11 -0500 To: James Taylor <jtaylor@segi.us>, Ian McMillan <Ian.McMillan@ncmail.net>, Cyndi Karoly <cyndi. karoly@ncmail. net> James, That will be fine with me James Taylor wrote: Joanne: I did forward your e-mail to Cyndi and Ian. I have left a voice-mail message with you re: an extension. The clients are obtaining the data requested by the DWQ in the Request for More Information. The surveyor is going out to do a full topographic survey so the engineer can prepare the stormwater plan. Talbot is the surveyor, and JBS Consulting is the Engineer (Brad Sedgwick) make up "the team." The "team" states that the stormwater plan will not be delivered to the client until the mid-end of December--past the date allowed by the Request for More Information. The client wants to be certain that he can get the data submitted within any extension and is concerned that the "holidays" may cause some additional delay--with the surveyor and/or engineer. The client would like to get an extension until January 31, 2009. If this date is "too far" away, the client would request an extension as close to that date as possible. The client will send you a letter requesting the extension, but he wanted me to contact you to get your input on the date. Again, he just wants to make sure he can get all of the data in hand and meet the date requested in his extension letter. Let me know your thoughts. Sincerely, James t[v„ v NOV 9, 1 cUU6 DENR • WATER QUALITY WET1M AND SMWMTB BRANCH 1 of 1 11/24/2008 9:49 AM