Loading...
HomeMy WebLinkAbout20171135 Ver 1_PCN Form Submission_20170907Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 9/7/2017 12:49:15 PM (Start Event) Accept by Carpenter,Kristi 9/7/2017 5:22:15 PM (DOT Initial Review) • The task was assigned to Carpenter,Kristi . The due date is: September 12, 2017 5:00 PM 9/7/2017 12:49 PM �� � 6fvlslaa of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 28, 2017 Ver 1.8 * Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red. Below is a link to the DRAFT online help file. http://edocs.deq.nc.gov/WaterResources/0/doc/549884/Page1.aspx A. Processing Information County (or Counties) where the project is located:* Yancey Is this a NCDOT Project?* �' Yes �' No (NCDOT only) T.I.P. or state project number: 17BP.13.R.127 WBS # 176P.13.R.127 (for f�1CDOT use only) � 1a. Type(s) of approval sought from the Corps:* rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: NWP Number Other: List all MN nurrbers you are applying for not on the drop dow n list. 14 - Linear transportation 1c. Type(s) of approval sought from the DWR:* check all that apply � 401 Water Quality Certification - Regular � Non-404 Jurisdictional General Permit r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: I For the record only for Corps Permit: 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? * l" Yes C•' No C' Yes C•' No If so, attach the acceptance letter from rritigation bank or in-lieu fee program �' Yes C' No Acceptance Letter Attachment C7ick the upload button or drag and drop files here to attach docurrent Bridge 167 Yancey mitigation acceptance.pdf 62.85KB FlLE IYFE MJST BE FDF 1f. Is the project located in any of NC's twenty coastal counties?* C' Yes �' No B. Applicant Information 1a. Who is the Primary Contact?* Yates Allen 1b. Primary Contact Email:* ryallen@ncdot.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (828)251-6171 1d. Who is applying for the permit? rJ Owner r Applicant (other than owner) r AgenUConsultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: NC Department of Transportation 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) J. J. Swain, Jr., P.E., Division Engineer 2d.Address Street Address 55 Orange Street Address Line 2 �Y Asheville Fbstal / Zip Code 28802 2e. Telephone Number: (xxx)xxx-xxxx (828)251-6171 2f. Fax Number: (828)251-6394 (xxx)xxx-xxxx 2g. Email Address:* ryallen@ncdot.gov State / R-ovince / F�gion NC Country US C. Project Information and Prior Project History 1. Project Information � 1a. Name of project:* Bridge 167 over Shoal Creek on SR 1323 in Yancey County 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town:* Windom 1d. Driving directions* If it is a new project and can not easily be found in a C� rrapping system Rease provide directions. Begin at the intersection of US 19 and NC 197S in Burnsville. Drive east towards Spruce Pine on US 19 for 2.4 miles. Turn left on to SR 1323 Shoal Creek Rd. Go appro�mately 0.7 mile to bridge 167. 2. Project Identification 2a. Property Identification Number: (tac RN or parcel ID) 2b. Propertysize: (in acres) 0.17 2c. Project Address Street Address Address Line 2 �� Fbstal / Zip Code State / Rovince / F�gion Country 2d. Site coordinates in decimal degrees � Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* 35.92476 ex:34.208504 3. Surface Waters Longitude:* -82.25226 -77.796371 3a. Name of the nearest body of water to proposed project:* Shoal Creek 3b. Water Resources Classification of nearest receiving water:* C; Tr Surface Water Lookup 3c. What river basin(s) is your project located in?* French Broad River Basin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Existing timber bridge on 2-lane asphalt road surrounded by low density housing, farmland, and forests in rural setting 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) C7ick the upload button or drag and drop files here to attach docurrent Bridge 167 Yancey topo.pdf 1.89M6 Fle type rrust be pdF 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) qick the upload button or drag and drop files here to attach docurrent Fle lype rrust be pdf 4d. List the total estimated acreage of all existing wetlands on the property: 0 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 96 4f. Explain the purpose of the proposed project: Replace the e�asting 17' 10" long timber bridge with a double barrel reinforced concrete box culvert; each barrel is 8' wide x 6' high x 45' long with low flow sills/baffels 4g. Describe the overall project in detail, including the type of equipment to be used: A permanent impact to 96 linear feet (LF) of Shoal Creek will be necessary: 45 LF for culvert installation; 51 LF for floodplain bench/stabilization. A temporary impact to 67 LF will be necessary for an impervious dike/diversion to dewater the work area during construction. Equipment used will include excavator, crane, and trucks. 4h. Please upload project drawins for the proposed project. Qick the upload button or drag and drop files here to attach docurrent SWMP Yancey 167.pdf 1.23M6 Yancey 167 Permit Drawings (3).pdf 1.06M6 Fle type rrust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* C' Yes C•' No �' Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? * C' Preliminary C' Approved C' Unknown Corps AID Number: Exarrple: SAV�2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5d1. Jurisdictional determination upload aick the upload button or drag and drop files here to attach docurrent Fle lype rrust be F�F 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C' Yes �' No �' Unknown 7. Future Project Plans 7a. Is this a phased project?* C' Yes C•' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands r7 Streams-tributaries r Buffers r Open Waters r Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Site #- 3b.lmpact 3c. Type of 3d. Stream 3e. Stream 3f. 3g. Stream 3h. Impact Reason for type impact name Type Jurisdiction width length impact type Row 1 Site 1 P Culvert Shoal Perennial Both Average 45 N�p label (e.g. F2rrranent (F'� or CPee k F2rennial (FB� or $ (linear feet) F3�ad Qossing 1) Terrporary (� interrrittent (If� Row 2 Site 1 P Bank Shoal Perennial Both N�p label (e.g. F2rrranent (F'� or Stabilizatio Creek F�rennial (Fff� or RDad (7ossing 1) Terrporary (� n interrrittent (IfV� Row 3 Site 1 T Dewatering Shoal Perennial Both N�p label (e.g. F�rrranent (P� or Creek F�rennial (� or Id�ad (7ossing 1) Terrporary (� interrrittent (IfVn "" All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: (feet) Average 8 (feet) Average 8 (feet) 51 (linear feet) 67 (linear feet) 96 3i. Total temporarystream impacts: 67 3i. Total stream and tributary impacts: 163 3j. Comments: I Permanent project footprint is 96LF; temporary and permanent impacts overlap 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 5. Pond or Lake Construction If pond or lake construction is proposed, then complete the chart below. 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Minimized length of culvert and has lowflow sills to maintain natural stream channel bottom within the structure. One barrel will serve as main flow channel with a 1' sill and second barrel serving high flows with a 2' sill across the bottom. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Will dewater the site, erosion control measures, culvert and footprint of project minimized 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C•' Yes �' No 2c. If yes, mitigation is required by (check all that apply): r DWR �J Corps 2d. If yes, which mitigation option(s) will be used for this project? r Mitigation bank rJ Payment to in-lieu fee program r Permittee Responsible Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. fJ Yes 4b. Stream mitigation requested: (linear feet) 45 4c. If using stream mitigation, stream temperature: cold 4d. Buffer mitigation requested (DWR only): (squarefeet) 4e. Riparian wetland mitigation requested: (acres) 4f. Non-riparian wetland mitigation requested: (acres) 4g. Coastal (tidal) wetland mitigation requested: (acres) 4h. Comments F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1a. Does this project require a Stormwater Management Plan? C� Yes l" No 1b. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: The project will use BMP's to the Maximum Extent Practicable (MEP) in compliance with NCDOT's NPDES Permit No. 000250 Post Construction Stormwater Program 1c. What is the overall percent imperviousness of this project? % 1d. Who will be responsible for the review of the Stormwater Management Plan?* r Certified Local Government r DWR 401 & Buffer Permitting Branch 2. Diffuse Flow Plan r DEMLR Stormwater Review �J DWR Transportation Permitting Branch 2a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C' Yes C•' No If no, explain why: 5. DWR 401 Stormwater Review 5a. Is the Stormwater Management Plan (including BMP Supplemental Forms and Operation and Maintenance Agreements) attached? C' Yes �' No Stormwater Management Plan Upload Gick the upload button or drag and drop files here to attach docurrent file type rrust be pdf G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* C� Yes C' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?* r Yes r No Comments:* Minimum Criteria Checklist (MCCL) 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * C' Yes �' No 2b. Is this an after-the-fact permit application?* C' Yes C•' No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* �' Yes G No 3b. If you answered "no," provide a short narrative description. Merely replacing existing bridge 4. Sewage Disposal (DWR Requirement) 4a. Describe, in detail, the treatment methods and dispositions (non-discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or habitat? * C' Yes �' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* C' Yes C•' No 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. Is this a DOT project located within Division's 1-8?* �' Yes �' No 5e. Will you cut anytrees in order to conduct the work in waters of the U.S.?* C' Yes C•' No 5f. Does this project involve bridge maintenance or removal?* C' Yes C' No 5f(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? Representative photos of signs of bat use can be found in the NLEB SLOPES, Appendix F, pages 3-7. C' Yes C•' No Link to the NLEB SLOPES document: http://sav�reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf If you answered "Yes" to 5f(1), did you discover any signs of bat use?* C' Yes C' No �' Unknown If yes, please show the location of the bridge on the permit drawings/project plans. qick the upload button or drag and drop files here to attach docurrent Fle rrust be FDF 5g. Does this project involve the construction/installation of a wind turbine(s)?"`* f Yes �' No If yes, please show the location of the wind turbine(s) on the permit drawings/project plans. qick the upload button or drag and drop files here to attach docurrent Fle rrust be FDF 5h. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?* C' Yes C•' No If yes to either, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property. Gick the upload button or drag and drop files here to attach docurrent Fle rrust be FDF 5i. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* https://�nv�vv.fws.gov/raleigh/species/cntylist/nc_counties.html. Field survey of the project area and evaluation of current distribution data. With regards to Northern long-eared bats, the project is located outside of a red HUC. The bridge could not be surveyed for bat presence/usage due to proximity to water level. No trees will be removed during construction. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes C•' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* Current maps/database 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? * C' Yes C•' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* http://gis.ncdcr.gov/hpoweb/ 7c. Historic or Prehistoric Information Upload aick the upload button or drag and drop files here to attach docurrent 167 Yancey no arch surv req.pdf 167 Yancey No Hist Props.pdf Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 12.68MB 2.66MB 8a. Will this project occur in a FEMA-designated 100-year floodplain?* C' Yes C•' No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination?* http://�.ncfloodmaps.com/ Miscellaneous attachments not previously requested. Gick the upload button or drag and drop files here to attach docurrent 167 photos.pdf 7.88M6 Bridge 167 Yancey signed letter.pdf 679.34KB Bridge 167 Yancey Corps cover sheet.pdf 19.87K6 Fle rrust be FDF Signature * fJ By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Yates Allen Signature 1�,�F7�5 rQi-1-��1 i Date 9/7/2017 Initial Review Is this project a public transportation project? C� Yes C' No Only change this if the project has been reassigned. Has this project met the requirements for acceptance in to the review process?* r Yes C' No BIMS # Assigned* 20171135 Version#* 1 Reviewing Office * Asheville Regional Office - (828) 296-4500 Select Project Reviewer* Kevin Barnett:eads\khbarnett