Loading...
HomeMy WebLinkAbout20171134 Ver 1_Build Maps_20170907 (3)GElementary Edwin M. Holt 62 62 62 Burlington-Alamance Regional Airport Bellemont H uffman MillRdP ond Rd B eaver Mackintosh Lake Cree k Back Big Creek St.Pauls Ch. See Sheet 1-A For Index of Sheets TIP PROJECT:B-5347 VICINITY MAP B-5347 BEGIN TIP PROJECT B-5347 END TIP PROJECT BEGIN TIP PROJECT B-5347 Rd. Alamance -L- STA. 17+00.00 -L- STA. 11+80.00 BRIDGE EXISTING REMOVE SIGNAL TEMP. (PRELIMINARY) RCBC W/ BEND PROP 10’x8’ SIGNAL TEMP. END TIP PROJECT B-5347SR 1145 (POND RD.) AND DEAD END TO CAPRICE LANE (ALAMANCE ROAD)To NC 62 -L- -DET-BI G ALAMANCE CREEK 09/08/99$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$ SHEET NO. STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS T.I.P. NO. ALAMANCE COUNTY TIP PROJECT:B-5347 ALAMANCE CREEK ON SR 1145 (POND RD.) LOCATION: BRIDGE NO. 170 OVER A PRONG OF B-5347 INDEX OF SHEETS 0 0 0 PROFILE (HORIZONTAL) GRAPHIC SCALES PLANS PROFILE (VERTICAL) 0 00 50 50 50 50 2010510 25 100 25 100 XX DEPART ME NT OF TRANSPORTATION STATE OF NORTH CARO LI NAUTILITIES REGIONAL ENGINEER UTILITIES ENGINEER UTILITIES COORDINATOR UTILITY OWNERS WITH CONFLICTS FAX (919) 250-4151 PHONE (919) 707-6690 RALEIGH NC 27699-1555 1555 MAIL SERVICES CENTER DIVISION OF HIGHWAYS UTILITIES UNIT UTILITIES AREA COORDINATOR UE-1 PREPARED IN THE OFFICE OF: PROJECT UTILITY COORDINATORJohn D. Schriner, PLS PREPARED IN THE OFFICE OF: ENGINEERING ETHERILLW Raleigh, N.C. 27606 Bus: 919 851 8077 Fax: 919 851 8107 CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN 1223 Jones Franklin Road License No. F-0377 PREPARED IN THE OFFICE OF: UTILITIES SHEET 1 OF 2 PERMIT DRAWING UTILITY PERMIT DRAWINGS BUFFER IMPACTS Tanga Sampson Ed Reams UE-1 (C) CATV - TIME WARNER CABLE (B) TELEPHONE - AT&T (A) POWER - DUKE ENERGY UTILITY BUFFER IMPACTS TITLE SHEET DESCRIPTION: UE-2 UE-1 SHEET NO.: Donna Jackson, PE Don Proper, PE SITE 1 SITE 2 TIMOTHY L. CROUSE NAD 83 NAD 83/ 2011REVISIONS B-5347 -L- STATION 17+00.00 END TIP PROJECT B-5347-L- STATION 11+80.00 BEGIN TIP PROJECT B-5347 9:21:52 AMR:\Utilities\Engineering\NEU\Permit Plans and Narrative\B-5347_ut_rdy4_UE2_psh.dgn28-Aug-175/14/99SHEET NO.PROJECT REFERENCE NO. POLE PROPOSED POWER UE-2 REM.REM. TIE TO EXISTING U/G TELEPHONE PROPOSED TELEPHONE POLE REM. CONNETT FAMILY TRUST THE GEORGE & MICHELLE PB 57 PG 1 DB 2696 PG 149 DB 184 PG 158 BARBARA B. KIRKPATRICK JAMES R. & DB 2459 PG 465 TIMOTHY L. CROUSE N.H. & NINA MAE SHACKLEFORD DB 179 PG 366 SARA LOU BOWMAN SHOFFNER DB 2130 PG 494 REM. REM. POWER POLE TIED TO EXISTING POWER POLE TIED TO EXISTING POLE PROPOSED POWER TEMPORARY DETOUR (UTILITIES) ALLOWABLE IMPACTS ZONE 1 (UTILITIES) ALLOWABLE IMPACTS ZONE 2 UTILITY BUFFER IMPACTS SHEET 2 OF 2 PERMIT DRAWING UTILITY IMPACTS MECHANIZED CLEARING ON ALL UTILITIES 791.7470 SQFT ALLOWABLE IMPACTS ZONE 2 718.3268 SQFT ALLOWABLE IMPACTS ZONE 1 SITE 1 441.7481 SQFT ALLOWABLE IMPACTS ZONE 2 104.8013 SQFT ALLOWABLE IMPACTS ZONE 1 SITE 228 August 2017 - Revised utility buffer impacts to coordinate with revised hydro buffer impacts.36" RCP INV=504.39’ INV=502.31’ 15" RCP METAL GATE 9’ DIRTN 4614’45" E92.43’S 4326’52" E146.66’ N 4709’32" E45.64’S 4326’52" E45.35’N 58 3 0’00" W172.92’ N 7941’20" E 268.70’ 19’ BST SR 1145 POND RD 1 2 3 4 5 6 7 WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W RW MON RW MON 60.00’48" BW 48" B W 48" BW AND WW48" BW 48" BW AND WW TWC TO NC 62 (ALAMANCE RD) TO CAPRICE LN AND DEAD END10+0015+00GREU, TL-2 GREU, TL-2 GREU, TL-2 GREU, TL-2 +83.50 -L- 73’ LT. 93’ LT. +20.00 -L- 46’ LT. +83.00 -L- 93’ LT. 130’ LT. +95.00 -L- +50.00 -L- 70’ LT. +22.00 -L- +61.62 -L- 60’ LT. +80.00 -L- 60’ LT. +25.00 -L- 50’ RT. +40.00 -L- 66’ RT. +61.62 -L- 5 3 3 2 1 4 +00.00 -L- 60’ RT. +00.00 -L- 60’ RT. +61.00 -L- 70’ RT.+91.00 -L- 80’ RT. +02.00 -L- +01.61 -L- 72.29’ RT +04.50 -L- 89.91’ RT +93.00 -L- 92’ RT 30’ RT. 30’ RT. 30’ RT. 30’ RT. 30’ LT. 30’ LT. 30’ LT. 30’ LT. F F F F F F F F (Phase IV) TEMP 84" (PHASE II) TEMP 84" TEMP 12" TEMP 12" -DET- 12+32 (29.5’ LT)-DET- 13+08 (17’ LT) -DET- 13+56 (27’ LT) TEMP. SHORING 0501 0502 0503 0504 0505 ROAD CROSSINGBRIDGEPARALLEL IMPACTZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)1 Aerial Line 11+64 to 13+63 RT718 792 15102 Aerial Line13+35 to 14+71 RT105 442 547TOTAL:823 1233 2057 0.0 0.0 0.0SHEET 3 OF 3 PROJECT: B-5347 08-28-2017N.C. DEPT. OF TRANSPORTATIONDIVISION OF HIGHWAYS ALAMANCE COUNTYIMPACTBUFFER IMPACTS SUMMARYTYPESITE NO.STRUCTURE SIZE / TYPESTATION (FROM/TO)ALLOWABLE MITIGABLEBUFFER REPLACEMENTRev. May 2006