See Sheet 1-A For Index of Sheets
TIP PROJECT:B-5347 VICINITY MAP
B-5347
BEGIN TIP PROJECT
B-5347
END TIP PROJECT
BEGIN TIP PROJECT B-5347
Rd.
Alamance
-L- STA. 17+00.00
-L- STA. 11+80.00
BRIDGE
EXISTING
REMOVE
SIGNAL
TEMP.
(PRELIMINARY)
RCBC W/ BEND
PROP 10’x8’
SIGNAL
TEMP.
END TIP PROJECT B-5347SR 1145 (POND RD.)
AND DEAD END
TO CAPRICE LANE
(ALAMANCE ROAD)To NC 62
-L-
-DET-BI
G ALAMANCE CREEK 09/08/99$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$ SHEET NO.
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
T.I.P. NO.
ALAMANCE COUNTY
TIP PROJECT:B-5347 ALAMANCE CREEK ON SR 1145 (POND RD.)
LOCATION: BRIDGE NO. 170 OVER A PRONG OF
B-5347
INDEX OF SHEETS
0
0
0
PROFILE (HORIZONTAL)
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
0
00
50 50
50 50
2010510
25 100
25 100
XX
DEPART
ME
NT
OF TRANSPORTATION STATE OF NORTH CARO
LI
NAUTILITIES REGIONAL ENGINEER
UTILITIES ENGINEER
UTILITIES COORDINATOR
UTILITY OWNERS WITH CONFLICTS
FAX (919) 250-4151
PHONE (919) 707-6690
RALEIGH NC 27699-1555
1555 MAIL SERVICES CENTER
DIVISION OF HIGHWAYS
UTILITIES UNIT
UTILITIES AREA COORDINATOR
UE-1
PREPARED IN THE OFFICE OF:
PROJECT UTILITY COORDINATORJohn D. Schriner, PLS
PREPARED IN THE OFFICE OF:
ENGINEERING
ETHERILLW Raleigh, N.C. 27606
Bus: 919 851 8077
Fax: 919 851 8107
CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION
TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN
1223 Jones Franklin Road
License No. F-0377
PREPARED IN THE OFFICE OF:
UTILITIES
SHEET 1 OF 2
PERMIT DRAWING
UTILITY PERMIT DRAWINGS
BUFFER IMPACTS
Tanga Sampson
Ed Reams
UE-1
(C) CATV - TIME WARNER CABLE
(B) TELEPHONE - AT&T
(A) POWER - DUKE ENERGY
UTILITY BUFFER IMPACTS
TITLE SHEET
DESCRIPTION:
UE-2
UE-1
SHEET NO.:
Donna Jackson, PE
Don Proper, PE
SITE 1
SITE 2
TIMOTHY L. CROUSE NAD 83
NAD 83/ 2011REVISIONS B-5347
-L- STATION 17+00.00
END TIP PROJECT B-5347-L- STATION 11+80.00
BEGIN TIP PROJECT B-5347
9:21:52 AMR:\Utilities\Engineering\NEU\Permit Plans and Narrative\B-5347_ut_rdy4_UE2_psh.dgn28-Aug-175/14/99SHEET NO.PROJECT REFERENCE NO.
POLE
PROPOSED POWER
UE-2
REM.REM.
TIE TO EXISTING U/G TELEPHONE
PROPOSED TELEPHONE POLE
REM.
CONNETT FAMILY TRUST
THE GEORGE & MICHELLE
PB 57 PG 1
DB 2696 PG 149
DB 184 PG 158
BARBARA B. KIRKPATRICK
JAMES R. &
DB 2459 PG 465
TIMOTHY L. CROUSE
N.H. & NINA MAE SHACKLEFORD
DB 179 PG 366
SARA LOU BOWMAN SHOFFNER
DB 2130 PG 494
REM.
REM.
POWER POLE
TIED TO EXISTING
POWER POLE
TIED TO EXISTING
POLE
PROPOSED POWER
TEMPORARY DETOUR
(UTILITIES)
ALLOWABLE IMPACTS ZONE 1
(UTILITIES)
ALLOWABLE IMPACTS ZONE 2
UTILITY BUFFER IMPACTS
SHEET 2 OF 2
PERMIT DRAWING
UTILITY IMPACTS
MECHANIZED CLEARING ON ALL
UTILITIES
791.7470 SQFT ALLOWABLE IMPACTS ZONE 2
718.3268 SQFT ALLOWABLE IMPACTS ZONE 1
SITE 1
441.7481 SQFT ALLOWABLE IMPACTS ZONE 2
104.8013 SQFT ALLOWABLE IMPACTS ZONE 1
SITE 228 August 2017 - Revised utility buffer impacts to coordinate with revised hydro buffer impacts.36" RCP
INV=504.39’
INV=502.31’
15" RCP
METAL GATE
9’ DIRTN 4614’45" E92.43’S 4326’52" E146.66’
N 4709’32" E45.64’S 4326’52" E45.35’N 58
3
0’00" W172.92’
N 7941’20" E
268.70’
19’ BST
SR 1145 POND RD
1
2
3
4
5 6
7
WOODS
WOODS
WOODS WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
RW MON
RW MON
60.00’48" BW
48" B
W
48" BW AND WW48" BW
48" BW AND WW
TWC
TO NC 62 (ALAMANCE RD)
TO CAPRICE LN AND DEAD END10+0015+00GREU, TL-2 GREU, TL-2
GREU, TL-2 GREU, TL-2
+83.50 -L-
73’ LT.
93’ LT.
+20.00 -L-
46’ LT.
+83.00 -L-
93’ LT.
130’ LT.
+95.00 -L-
+50.00 -L-
70’ LT.
+22.00 -L-
+61.62 -L-
60’ LT.
+80.00 -L-
60’ LT.
+25.00 -L-
50’ RT.
+40.00 -L-
66’ RT.
+61.62 -L-
5
3
3
2
1
4
+00.00 -L-
60’ RT.
+00.00 -L-
60’ RT.
+61.00 -L-
70’ RT.+91.00 -L-
80’ RT.
+02.00 -L-
+01.61 -L-
72.29’ RT
+04.50 -L-
89.91’ RT
+93.00 -L-
92’ RT
30’ RT.
30’ RT.
30’ RT.
30’ RT.
30’ LT.
30’ LT.
30’ LT.
30’ LT.
F
F
F
F
F
F
F F
(Phase IV)
TEMP 84"
(PHASE II)
TEMP 84"
TEMP 12"
TEMP 12"
-DET- 12+32 (29.5’ LT)-DET- 13+08 (17’ LT)
-DET- 13+56 (27’ LT)
TEMP. SHORING
0501
0502
0503
0504
0505
ROAD CROSSINGBRIDGEPARALLEL IMPACTZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)1 Aerial Line 11+64 to 13+63 RT718 792 15102 Aerial Line13+35 to 14+71 RT105 442 547TOTAL:823 1233 2057 0.0 0.0 0.0SHEET 3 OF 3 PROJECT: B-5347 08-28-2017N.C. DEPT. OF TRANSPORTATIONDIVISION OF HIGHWAYS ALAMANCE COUNTYIMPACTBUFFER IMPACTS SUMMARYTYPESITE NO.STRUCTURE SIZE / TYPESTATION (FROM/TO)ALLOWABLE MITIGABLEBUFFER REPLACEMENTRev. May 2006