Loading...
HomeMy WebLinkAbout20171131 Ver 1_Build Maps_20170907HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)113+34± to 13+56±Culvert0.0065 0.0078 46 58212+34± to 13+56±Riprap Banks0.0070 50TOTALS:0.0135 0.0078 96 58ATN Revised 3/31/053/10/2015YANCEY COUNTYNC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYSWBS - 17BP.13.R.126 WETLAND PERMIT IMPACT SUMMARYSURFACE WATER IMPACTSWETLAND IMPACTSSHEET 1 0F 1