HomeMy WebLinkAbout20120776 Ver 2_WRC Comments_20170905Homewood, Sue From: Leslie, Andrea J Sent: Tuesday, September 05, 2017 12:31 PM To: rwhager@wkdickson.com Cc: Homewood, Sue; Hodges, Kinnon B Subject: UT to Gap Creek Hi Ryan, Due to safety issues with an overhead transmission line, you asked if contractors would be allowed to work within the trout moratorium to install a culvert on an unnamed tributary to Gap Creek for the Boone water line project. Gap Creek is a brook trout stream, and the moratorium is Oct 15 - April 15; it is important to minimize the loss of sediment from this project in order to protect trout spawning downstream. The area of work is already in the dry, with a dike placed in the stream and flows pumped around the area. We ask that you replace the culvert if at all possible before October 15. However, if the work must proceed within the trout moratorium, we will allow it, providing that you install the culvert in the dry and allow temporary vegetation to grow enough to stabilize the banks and floodplain before turning the flows back through the culvert. Andrea Andrea Leslie Mountain Habitat Conservation Coordinator NC Wildlife Resources Commission 20830 Great Smoky Mountain Expressway Waynesville, NC 28786 828-558-6011; 828-400-4223 (cell) www.ncwildlife.or Get NC Wildlife Update delivered to your inbox from the N.C. Wildlife Resources Commission. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.