Loading...
HomeMy WebLinkAbout20150610 Ver 3_More Info Received_20170905Homewood, Sue From: Cutler, James D <James.Cutler@amecfw.com> Sent: Monday, September 04, 2017 7:00 PM To: Homewood, Sue Cc: Ruhl, Cedric; steve.cahoon@duke-energy.com; Harmon, Richard G Subject: Dan River IP Application/Certification - RAI response Attachments: DAN RIVER SCARP REPAIR ACCESS ROAD - DR-131.pdf Hello Sue (Re: Dan River USACE Individual Permit application/DWR Certification — Request for Additional Information) You had sent an email to Steve Cahoon on August 18, 2017 requesting additional information regarding the dewatering of Stream 3 while installing the bank stabilization material and the culvert. In response to your request, please see the attached revised engineering drawings for the Dan River DR131 project. Specifically, please see the last two sheets (DNR C901.001.006 and DNR C901.001.007), which include detail/specs for the diversion coffer dam and the dewatering device. Respectfully, Jim Cutler This message is the property of Amec Foster Wheeler plc and/or its subsidiaries and/or affiliates and is intended only for the named recipient(s). Its contents (including any attachments) may be confidential, legally privileged or otherwise protected from disclosure by law. Unauthorised use, copying, distribution or disclosure of any of it may be unlawful and is strictly prohibited. We assume no responsibility to persons other than the intended named recipient(s) and do not accept liability for any errors or omissions which are a result of email transmission. If you have received this message in error, please notify us immediately by reply email to the sender and confirm that the original message and any attachments and copies have been destroyed and deleted from your system. If you do not wish to receive future unsolicited commercial electronic messages from us, please forward this email to: unsubscribe@amecfw.com and include "Unsubscribe" in the subject line. If applicable, you will continue to receive invoices, project communications and similar factual, non-commercial electronic communications. Please click http://amecfw.com/email-disclaimer for notices and company information in relation to emails originating in the UK, Italy or France. W —E- -F —F 2 0 5 .� H 0 DAN RIVER SCARP REPAIR ACCESS ROAD DAN RIVER STEAM STATION DUKE ENERGY ISSUE No. DR -131 900 S. EDGEWOOD ROAD ROCKINGHAM COUNTY, NORTH CAROLINA � -� -Faortlns'e�llle. \� v 000 je St Eden s�adam °' a 311 °eyon+l aY St Gwi 11" 8R f �a�frnsvrlle.HIvy` I, o D �r Cascade A - 1;0 VIR(.INI:1 ` NORTH CAROI INA — — 1 Pelham s 0 ' Jy� I nlhi DAN RIVER STEAM STATION AQ m Feld villa_ ti Jy m SITE VICINITY MAP - 1 I = 5 MILES MAP SOURCE: ESRI WORLD TOPOGRAPHIC BASEMAP SHEET NUMBER m I COVER SHEET c �•I Ir m GENERAL NOTES Oolli r .004 EXISTING CONDITIONS o " May c fan L 11 , .008 SITE RESTORATION PLAN eetm`A N�1 S', r' DUKE SCALE: AS SHOWN DWG TYPE: DWG 0 h d Dogwootl Dt a N I l Pine' h ,a�.r� a Hall I c Hoepilal WY n s N DNR C901.001.001 � 8 9 o m I ooyQ 000 je St Eden s�adam °' a 311 °eyon+l aY St Gwi 11" 8R f �a�frnsvrlle.HIvy` I, o D �r Cascade A - 1;0 VIR(.INI:1 ` NORTH CAROI INA — — 1 Pelham s 0 ' Jy� I nlhi DAN RIVER STEAM STATION AQ m Feld villa_ ti Jy m SITE VICINITY MAP - 1 I = 5 MILES MAP SOURCE: ESRI WORLD TOPOGRAPHIC BASEMAP a � � o E Arhor Ln'oo a0 c , 311 p 't Oleande' °' aWrl - Kniryy Si food Ot r'� .1 3*VL,d0a° G r� DAN RIVER STEAM STATION SITE VICINITY MAP - 1" = 2000' MAP SOURCE: ESRI WORLD TOPOGRAPHIC BASEMAP CONTACT INFORMATION OWNER: DUKE ENERGY CAROLINAS, INC ADDRESS: 400 SOUTH TRYON STREET CHARLOTTE, NORTH CAROLINA 28201 ENGINEER AMEC FOSTER WHEELER ADDRESS: 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NORTH CAROLINA 28208 PHONE: 704-357-8600 Latitude: 36°29'11. 1 6"N, Longitude: 79°43'1 5.57"W 0 4 SHEET NUMBER SHEET TITLE O.k Hill COVER SHEET Gfanl St GENERAL NOTES Oolli SITE AERIAL .004 EXISTING CONDITIONS Ev.nt.Gn1•>, rACPROPOSED SCARP REPAIR tan st L CESS ROAD DETAILS .008 SITE RESTORATION PLAN eetm`A N�1 S', Wason st rn DUKE SCALE: AS SHOWN DWG TYPE: DWG 1.711 ENEnGY© d Dogwootl Dt a etx, is - htr.h..dN DABTE 08/24/2017 h ,a�.r� a DWG SIZE "- Hoepilal WY n s I DNR C901.001.001 I. Wn45 8 9 10 m ooyQ r m _ a a � � o E Arhor Ln'oo a0 c , 311 p 't Oleande' °' aWrl - Kniryy Si food Ot r'� .1 3*VL,d0a° G r� DAN RIVER STEAM STATION SITE VICINITY MAP - 1" = 2000' MAP SOURCE: ESRI WORLD TOPOGRAPHIC BASEMAP CONTACT INFORMATION OWNER: DUKE ENERGY CAROLINAS, INC ADDRESS: 400 SOUTH TRYON STREET CHARLOTTE, NORTH CAROLINA 28201 ENGINEER AMEC FOSTER WHEELER ADDRESS: 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NORTH CAROLINA 28208 PHONE: 704-357-8600 Latitude: 36°29'11. 1 6"N, Longitude: 79°43'1 5.57"W 0 4 SHEET NUMBER SHEET TITLE 1lal COVER SHEET .002 GENERAL NOTES .003 SITE AERIAL .004 EXISTING CONDITIONS .005 rACPROPOSED SCARP REPAIR .006 L CESS ROAD DETAILS .008 SITE RESTORATION PLAN SEAL DUKE SCALE: AS SHOWN DWG TYPE: DWG 1.711 / 1Ak w o sT�'J"Y4 ✓!�%p'� � W I „ . � � w :;- + �,�:�. �!§r' '.+-".r.�' _ "lam" A ",� a DAN RIVER STEAM STATION d' 40 low +: +Y 40 SITE VICINITY MAP - 111 = 750' MAP SOURCE: ESRI WORLD TOPOGRAPHIC BASEMAP DRAWING INDEX SHEET NUMBER SHEET TITLE .001 COVER SHEET .002 GENERAL NOTES .003 SITE AERIAL .004 EXISTING CONDITIONS .005 ROAD DESIGN PLAN .006 EROSION CONTROL .007 DETAILS .008 SITE RESTORATION PLAN U PROJECT DESCRIPTION: CONSTRUCT ACCESS ROAD, INCLUDING CULVERT CROSSING, TO PROVIDE EQUIPMENT AND MATERIAL ACCESS TO THE DAN RIVER FOR IMPLEMENTATION OF THE SCARP REPAIR PROJECT. THE ACCESS ROAD AND CULVERT CROSSING WILL BE INSTALLED AS SHOWN ON THE DRAWINGS. EROSION CONTROL MEASURES WILL BE INSTALLED AS SHOWN. TOTAL DISTURBED AREA: 0.93 ACRE RIVER BASIN: ROANOKE RIVER REV DATE JOB NO. PROJECT TYPE DES I DFTR I CHKD I ENGR I APPD INCHES 1 2 3 TENTHS 10 20 30 4 5 6 Plotted By: Bell, Josh Sheet Set: DAN RIVER SCARP REPAIR ACCESS ROAD Layout:.001 COVER SHEET August 24, 2017 06: 00: 17pm Q:\Duke\DcnRiver\7810150418_Dcn River OnCall\Plansheets\DR-0130 ScarpRepalrRoadDeslgn\.001 COVER SHEET.dwg 7 DESCRIPTION DNR C901.001.001 DAN RIVER STEAM STATION ROCKINGHAM COUNTY, NORTH CAROLINA N NC STATE MAP MAP SOURCE: USGS COUNTY DIGITAL MAPS Environment & Infrastructure TITLE DAN RIVER SCARP REPAIR ACCESS ROAD DUKE ENERGY ISSUE NO. DR -131 2801 YORKMONT ROADDAN amec RIVER STEAM STATION SUITE 100 CHARLOTTE, NC 28208 TEL: (704) 357-8600 FAX: (704) 357-8638 foster wheeler COVER SHEET LICENSURE: FOR PERMANENT CROSSING NC ENG: F-1253 NC GEOLOGY: C-247 SEAL DUKE SCALE: AS SHOWN DWG TYPE: DWG ENEnGY© 0: 7810150418 DABTE 08/24/2017 FILENAME: .001 COVER SHEET.dwg DWG SIZE DRAWING NO. ANSI D 22"x34" DNR C901.001.001 8 9 10 REV. 0 DES: RLK DFTR: RLK CHKD: JMB ENGR: JMB APPD: JMB REVISION 0 0 0 Z I l�J\ Q O O O I 10 Fq F— 2 3 PROJECT DESCRIPTION THE PROPOSED AREA OF CONSTRUCTION WILL INCLUDE: THE REMOVAL OF TREES AND WOODY VEGETATION, THE INSTALLATION OF TWO (2) PERMANENT CULVERTS WITHIN THE RAILROAD BRANCH CREEK, THE PLACEMENT OF A PERMANENT ACCESS ROAD, AND THE INSTALLATION OF REQUIRED EROSION/SEDIMENT CONTROL MEASURES. THE ACCESS ROAD WILL BE USED TO DELIVER EQUIPMENT AND MATERIALS TO CONSTRUCT THE PREVIOUSLY APPROVED SCARP REPAIR ALONG THE NORTH BANK OF THE DAN RIVER. THE TOTAL PROPOSED CLEARING AREA (DISTURBED AREA) IS APPROXIMATELY 1.34 ACRE. EROSION AND SEDIMENTATION CONTROL NARRATIVE THE EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT INVOLVE THE PLACEMENT OF A VARIETY OF EROSION AND SEDIMENT CONTROL MEASURES AT STRATEGIC LOCATIONS THROUGHOUT THE DEVELOPMENT. THESE MEASURES A INCLUDE: 1. FILTREXX SOXX (OR EQUIVALENT) 2. TEMPORARY CONSTRUCTION ENTRANCES 3. PERMANENT SEED THESE MEASURES ARE TO BE INSTALLED PRIOR TO CLEARING. ALL EROSION CONTROL MEASURES SHALL BE PROPERLY MAINTAINED UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL MEASURES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL MEASURES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. EROSION CONTROL MEASURE NOTES 1. TEMPORARY CULVERTS WILL BE INSTALLED AT TWO (2) LOCATIONS WITHIN THE RAILROAD BRANCH CREEK. THE INSTALLATION OF THESE CULVERTS WILL BE PERMITTED BY THE USACE AND NCDEQ THROUGH A PCN #39. 2. THE EXISTING, GRAVEL ACCESS ROAD ALONG THE CREST OF THE ADJACENT DIKE WILL SERVE AS THE ACCESS POINT FOR THE PROJECT, AND AS THE CONSTRUCTION ENTRANCE. 3. PLACE FILTREXX SOXX (OR EQUIVALENT) DOWN -GRADIENT OF THE CONSTRUCTION AREA AS NOTED ON THE PLANS AND AS INDICATED IN THE DETAILS. 4. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED PER THE LATEST VERSION OF NCDEQ "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL." GENERAL NOTES 1. ALL EROSION CONTROL MEASURES SHALL BE PROPERLY MAINTAINED DURING CONSTRUCTION UNTIL THE COMPLETION OF CONSTRUCTION ACTIVITIES AND DISTURBED AREAS HAVE BEEN STABILIZED. TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 2. SEDIMENT AND EROSION CONTROL MEASURES AND PLANTED AREAS SHALL BE INSPECTED BY DUKE ENERGY OR THEIR REPRESENTATIVE EVERY SEVEN (7) CALENDAR DAYS AND AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS ONE-HALF -C (0.5) INCH IN A 24-HOUR PERIOD. DAMAGED OR INEFFECTIVE MEASURES SHALL BE REPAIRED OR REPLACED, AS NECESSARY, AS SOON AS PRACTICAL. 3. IF NECESSARY SEEDED AREAS SHALL BE FERTILIZED, RESEEDED AS NECESSARY AND MULCHED ACCORDING TO THE SEEDING PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. SEEDED AREAS SHALL BE INSPECTED PERIODICALLY BY DUKE ENERGY UNTIL FINAL GROUND COVER HAS BEEN ESTABLISHED. THE CONTRACTOR IS RESPONSIBLE FOR RESTORING VEGETATION TO ITS ORIGINAL CONDITION, OR BETTER, FOR UP TO A YEAR. SEEDING SHALL BE CONSISTENT WITH REQUIREMENTS OF THE VEGETATION MAINTENANCE AND IMPLEMENTATION PLAN (VMIP) FOR THE DAN RIVER STATION. 4. THE OWNER OR THEIR AGENT SHOULD ADHERE TO THE SELF -INSPECTION PROGRAM FOR EROSION AND SEDIMENT CONTROL (EFFECTIVE OCTOBER 1, 2010). DETAILS OF THE PROGRAM AND RECOMMENDED INSPECTION FORMS CAN BE FOUND AT THE FOLLOWING WEBSITE: WWW.DLR.ENR.STATE.NC.US/PAGES/SEDIMENTATION_NEW.HTML 5. THE OWNER'S CONTRACTOR IS RESPONSIBLE FOR NOTIFYING UTILITY COMPANIES TO LOCATE ALL UNDERGROUND UTILITIES PRIOR TO ANY CONSTRUCTION. 6. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION D ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN SEVEN (7) DAYS FOR PERIMETER AREAS AND SLOPES GREATER THAN 3H:1V AND NO MORE THAN FOURTEEN (14) DAYS FOR OTHER AREAS AFTER WORK HAS CEASED. 7. CONSTRUCTION ENTRANCES/EXITS WILL BE USED AT DOT/PUBLIC ROAD CROSSINGS. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO THE PAVED ROADWAY CONSTRUCTION AREAS. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. STANDARDS ALL EROSION AND SEDIMENTATION CONTROLS SHALL BE IN ACCORDANCE WITH THE NORTH CAROLINA SEDIMENTATION POLLUTION CONTROL ACT OF 1973. CONSTRUCTION DETAILS AND SPECIFICATIONS WITHIN THIS PLAN WERE DERIVED FROM THE EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL DATED JUNE, 2006, PREPARED BY THE NORTH CAROLINA SEDIMENTATION CONTROL COMMISSION, NCDEQ AND NCAES. SEEDING: 1. SEE SEEDING SPECIFICATION ON THIS SHEET. 2. TEMPORARY OR PERMANENT SEEDING SHALL BE PERFORMED AS PER NCDEQ'S REQUIREMENT WITHIN 14 CALENDAR DAYS OF COMPLETION OF GRADING. AREAS THAT FALL UNDER MORE STRINGENT CRITERIA SHALL BE STABILIZED WITHIN 7 CALENDAR DAYS. CONSTRUCTION SEQUENCE 1. HOLD PRECONSTRUCTION MEETING. 3. INSTALL EROSION CONTROL MEASURES ALONG PERIMETER OF DISTURBANCE LIMITS. (SEE SHEET .006). 4. FILTREXX SOXX (OR EQUIVALENT) SHALL BE TURNED UP THE SLOPE TO PROMOTE CONTAINMENT AND TO PREVENT CONCENTRATION OF FLOW. 5. FILTREXX SOXX (OR EQUIVALENT) SHALL BE MOVED ONLY TO PROVIDE EQUIPMENT ACCESS, BUT SHALL BE REPLACED PRIOR TO ANY LAND DISTURBANCE ABOVE THE SECTION OF FILTREXX SOXX (OR EQUIVALENT). 6. ALL VEGETATION SHALL BE REMOVED (BUSHES, TREES AND SHRUBS) TO BE FLUSH OR WITHIN 6 INCHES OF THE GROUND. 7. THE ACCESS ROAD AND CULVERTS SHALL BE SEQUENTIALLY CONSTRUCTED FROM THE DIKE CREST TOWARDS THE DAN F RIVER. 8. SEDIMENT CONTROL MEASURES SHALL NOT BE REMOVED UNTIL AREAS HAVE BEEN STABILIZED. INCHES 1 2 3 ITENTHS 10 20 30 I 5 DEFINITION CONTROLLING RUNOFF AND EROSION ON DISTURBED AREAS BY ESTABLISHING PERENNIAL VEGETATIVE COVER WITH SEED. PURPOSE TO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS, AND TO PERMANENTLY STABILIZE SUCH AREAS IN A MANNER THAT IS ECONOMICAL, ADAPTS TO SITE CONDITIONS, AND ALLOWS SELECTION OF THE MOST APPROPRIATE PLANT MATERIALS. SPECIFICATIONS SEEDBED REQUIREMENTS ESTABLISHMENT OF VEGETATION SHOULD NOT BE ATTEMPTED ON SITES THAT ARE UNSUITABLE DUE TO EXCESSIVE SOIL COMPACTION, INAPPROPRIATE SOIL TEXTURE, POOR DRAINAGE, CONCENTRATED OVERLAND FLOW, OR STEEPNESS OF SLOPE UNTIL MEASURES HAVE BEEN TAKEN TO CORRECT THESE PROBLEMS. TO MAINTAIN A GOOD STAND OF VEGETATION, THE SOIL MUST MEET CERTAIN MINIMUM REQUIREMENTS AS A GROWTH MEDIUM. THE EXISTING SOIL SHOULD HAVE THESE CRITERIA: • ENOUGH FINE-GRAINED (SILT AND CLAY) MATERIAL TO MAINTAIN ADEQUATE MOISTURE AND NUTRIENT SUPPLY (AVAILABLE WATER CAPACITY OF AT LEAST .05 INCHES WATER TO 1 INCH OF SOIL). • SUFFICIENT PORE SPACE TO PERMIT ROOT PENETRATION • SUFFICIENT DEPTH OF SOIL TO PROVIDE AN ADEQUATE ROOT ZONE. THE DEPTH TO ROCK OR IMPERMEABLE LAYERS SUCH AS HARDPANS SHOULD BE 12 INCHES OR MORE, EXCEPT ON SLOPES STEEPER THAN 2:1 WHERE THE ADDITION OF SOIL IS NOT FEASIBLE. • A FAVORABLE PH RANGE FOR PLANT GROWTH, USUALLY 6.0 - 6.5. • FREE FROM LARGE ROOTS, BRANCHES, STONES, LARGE CLODS OF EARTH, OR TRASH OF ANY KIND. CLODS AND STONES MAY BE LEFT ON SLOPES STEEPER THAN 3:1 IF THEY ARE TO BE HYDRO SEEDED. IF ANY OF THE ABOVE CRITERIA ARE NOT MET - I.E., IF EXISTING SOIL IS TOO COARSE, DENSE, SHALLOW OR ACIDIC TO FOSTER VEGETATION - SPECIAL AMENDMENTS ARE REQUIRED. THE SOIL CONDITIONERS DESCRIBED BELOW MAY BE BENEFICIAL OR, PREFERABLY, TOPSOIL MAY BE APPLIED. SEEDBED PREPARATION INSTALL NECESSARY MECHANICAL EROSION AND SEDIMENTATION CONTROL PRACTICES BEFORE SEEDING, AND COMPLETE GRADING ACCORDING TO THE APPROVED PLAN. LIME AND FERTILIZER NEEDS SHOULD BE DETERMINED BY SOIL TESTS. DIRECTIONS, SAMPLE CARTONS, AND INFORMATION SHEETS ARE AVAILABLE THROUGH COUNTY AGRICULTURAL EXTENSION OFFICES. TESTING IS ALSO DONE BY COMMERCIAL LABORATORIES. WHEN SOIL TESTS RESULTS ARE NOT AVAILABLE, FOLLOW RATES SUGGESTED IN THE SEEDING SPECIFICATIONS SHOWN AT RIGHT. APPLICATION RATES USUALLY FALL INTO THE FOLLOWING RANGES: �e1:Z�1�1►1�1_Lell[�1�1���L'7_1����ilx.�l�l►1: LIGHT -TEXTURED, SANDY SOILS: 1-1/2 TONS/ACRE HEAVY -TEXTURED, CLAYEY SOILS: 2-3 TONS/ACRE • FERTILIZER: GRASSES: 800-1200 LB/ACRE OF 10-10-10 (OR THE EQUIVALENT) GRASS -LEGUME MIXTURES: 800-1200 LB/ACRE OF 10-10-10 (OR THE EQUIVALENT) APPLY LIME AND FERTILIZER EVENLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL BY DISKING OR OTHER SUITABLE MEANS. OPERATE MACHINERY ON THE CONTOUR. WHEN USING A HYDRO SEEDER, APPLY LIME AND FERTILIZER TO A ROUGH, LOOSE SURFACE. 0911.11111 >�Y�L1y�Ly�y,:1[�l iri>�y�q�11►[e COMPLETE SEEDBED PREPARATION BY BREAKING UP LARGE CLODS AND RAKING INTO A SMOOTH, UNIFORM SURFACE (SLOPES LESS THAN 3:1). FILL IN OR LEVEL DEPRESSIONS THAT CAN COLLECT WATER. BROADCAST SEED INTO A FRESHLY LOOSENED SEEDBED THAT HAS NOT BEEN SEALED BY RAINFALL. SEEDING SEEDING DATES GIVEN IN THE SEEDING MIXTURE SPECIFICATIONS ARE DESIGNATED AS "BEST" OR "POSSIBLE". SEEDINGS PROPERLY CARRIED OUT WITHIN THE "BEST" DATES HAVE A HIGH PROBABILITY OF SUCCESS. IT IS ALSO POSSIBLE TO HAVE SATISFACTORY ESTABLISHMENT WHEN SEEDING OUTSIDE THESE DATES. HOWEVER, AS YOU DEVIATE FROM THEM, THE PROBABILITY OF FAILURE INCREASES RAPIDLY. SEEDING ON THE LAST DATE SHOWN UNDER "POSSIBLE" MAY REDUCE CHANGES OF SUCCESS BY 30-50%. ALWAYS TAKE THIS INTO ACCOUNT IN SCHEDULING LAND -DISTURBING ACTIVITIES. USE CERTIFIED SEED FOR PERMANENT SEEDING WHENEVER POSSIBLE LABELING OF NON -CERTIFIED SEED IS ALSO REQUIRED BY LAW. LABELS CONTAIN IMPORTANT INFORMATION ON SEED PURITY, GERMINATION, AND PRESENCE OF WOOD SEEDS. SEEDS MUST MEET STATE STANDARDS FOR CONTENT OF NOXIOUS WEEDS. DO NO ACCEPT SEED CONTAINING "PROHIBITED" NOXIOUS WEED SEED. INOCULATE LEGUME SEED WITH THE RHIZOBIUM BACTERIA APPROPRIATE TO THE SPECIES OF LEGUME. APPLY SEED UNIFORMLY WITH A CYCLONE SEEDER, DROP -TYPE SPREADER, DRILL, CULTIPACKER SEEDER, OR HYDRO SEEDER ON A FIRM, FRIABLE SEEDBED. 4 5 REV I DATE I JOB NO 6 7 8 WHEN USING A DRILL OR CULTIPACKER SEEDER, PLANT SMALL GRAINS NO MORE THAN 1 INCH DEEP, GRASSES AND LEGUMES NO MORE THAN 1/2 INCH. EQUIPMENT SHOULD BE CALIBRATED IN THE FIELD FOR THE DESIRED SEEDING RATE. WHEN USING BROADCAST -SEEDING METHODS, SUBDIVIDE THE AREA INTO WORKABLE SECTIONS AND DETERMINE THE AMOUNT OF SEED NEEDED FOR EACH SECTION. APPLY ONE-HALF THE SEED WHILE MOVING BACK AND FORTH ACROSS THE AREA, MAKING A UNIFORM PATTERN: THEN APPLY THE SECOND HALF IN THE SAME WAY, BUT MOVING AT RIGHT ANGLES TO THE FIRST PASS. JDJto] :I_1In,IlL::10[eZ11TAI►TAI:011101MAN:01Ill a::4:Z.yMIMI1]10 HYDRO SEEDING SURFACE ROUGHENING IS PARTICULARLY IMPORTANT WHEN HYDRO SEEDING, AS A ROUGHENED SLOPE WILL PROVIDE SOME NATURAL COVERAGE FOR LIME, FERTILIZER, AND SEED. THE SURFACE SHOULD NOT BE COMPACTED OR SMOOTH. FINE SEEDBED PREPARATION IS NOT NECESSARY FOR HYDRO SEEDING OPERATIONS: LARGE CLODS, STONES, AND IRREGULARITIES PROVIDE CAVITIES IN WHICH SEEDS CAN LODGE. RATE OF WOOD FIBER (CELLULOSE) APPLICATION SHOULD BE AT LEAST 2,000 LB/ACRE. APPLY LEGUME INOCULANTS AT FOUR TIMES THE RECOMMENDED RATE WHEN ADDING INOCULANT TO A HYDRO SEEDER SLURRY. IF A MACHINERY BREAKDOWN OF 1/2 TO 2 HOURS OCCURS, ADD 50% MORE SEED TO THE TANK, BASED ON THE PROPORTION OF THE SLURRY REMAINING. THIS SHOULD COMPENSATE FOR DAMAGE TO SEED. BEYOND 2 HOURS, A FULL RATE OF NEW SEED MAY BE NECESSARY. LIME IS NOT NORMALLY APPLIED WITH A HYDRAULIC SEEDER BECAUSE IT IS ABRASIVE. IT CAN BE BLOWN ONTO STEEP SLOPES IN DRY FORM. MAINTENANCE GENERALLY, A STAND OF VEGETATION CANNOT BE DETERMINED TO BE FULLY ESTABLISHED UNTIL SOIL COVER HAS BEEN MAINTAINED FOR ONE FULL YEAR FROM PLANTING. INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS AND RESEEDINGS WITHIN THE SAME SEASON, IF POSSIBLE. RESEEDING --IF A STAND HAS INADEQUATE COVER, RE-EVALUATE CHOICE OF PLANT MATERIALS AND QUANTITIES OF LIME AND FERTILIZER. RE-ESTABLISH THE STAND AFTER SEEDBED PREPARATION OR OVER- SEED THE STAND. CONSIDER SEEDING TEMPORARY, ANNUAL SPECIES IF THE TIME OF YEAR IS NOT APPROPRIATE FOR PERMANENT SEEDING. IF VEGETATION FAILS TO GROW, SOIL MUST BE TESTED TO DETERMINE IF ACIDITY OR NUTRIENT IMBALANCE IS RESPONSIBLE. FERTILIZATION --ON THE TYPICAL DISTURBED SITE, FULL ESTABLISHMENT USUALLY REQUIRES RE -FERTILIZATION IN THE SECOND GROWING SEASON. FINE TURF REQUIRES ANNUAL MAINTENANCE FERTILIZATION. USE SOIL TESTS IF POSSIBLE OR FOLLOW THE GUIDELINES GIVEN FOR THE SPECIFIC SEEDING MIXTURE. TEMPORARY SEEDING SPECIFICATIONS SEEDING MIXTURE SPECIES RATE (LB/ACRE) OPTIMUM DATES TO PLANT RYE GRAIN (ALONE) 56 FEB. -MARCH; AUG. 15 - NOV. 20 (QUICK, SUITE 100 CHARLOTTE, INC 28208 DENSE COVER) RYE GRAIN (M/X)* 10 FEB. -MARCH; AUG. 15 - NOV, 20 (QUICK, DES: RLK DENSE COVER) BROWNTOP MILLET (ALONE) 40 APR. 20 - AUG. 15 (QUICK COVER) BROWNTOP MILLET (MIX)* 10 APR. 20 - AUG. 15 (QUICK COVER) BROWNTOP MILLET (ALONE) 50 AUG. 10 - OCT. 10 (COMPETITIVE, DENSE) BROWNTOP MILLET (MIX)* 8 AUG. 10 - OCT. 10 (COMPETITIVE, DENSE) *MIX MEANS 2 OR MORE LONG TERM SPECIES PLUS SHORT TERM SPECIES. FOR DETAILS ON MIXES CONSULT THE GREENVILLE SOIL AND WATER CONSERVATION DISTRICT (864-467-2755, 108) APPD: JMB SOIL AMENDMENTS DWG SIZE FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 3,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR MULCH BY TACKING WITH ASPHALT, ROVING OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING. TOOL. MAINTENANCE RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, RE -FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION -CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 21 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PROVISIONS FOR PERMANENT GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. PROJECT TYPE DES DFTR CHKD ENGR APPD 6 Plotted By: Bell, Josh Sheet Set: DAN RIVER SCARP REPAIR ACCESS ROAD Layout:.002 GENERAL NOTES August 24, 2017 06: 01: 05pm Q: \Duke\DanRiver\7810150418_Dan River On-Call\Plansheets\DR-0130 ScarpRepairRoadDeslgn\.002 GENERAL NOTES.dwg 7 DNR C901.001.002 IREV, 0 *REF: GREENVILLE COUNTY, SOUTH CAROLINA STORM WATER MANAGEMENT DESIGN MANUAL, AUGUST 2010. PERMANENT SEEDING SPECIFICATIONS SEEDING MIXTURE SPECIES (REMARKS) BAHIA GRASS (ALONE) BAHIA GRASS (MIX) - RATE (LB/ACRE) OPTIMUM DATES TO PLANT BERMUDA GRASS, HULLED (ALONE) ELI 30 BERMUDA GRASS, HULLED (MIX)* 4-6 FESCUE, TALL, KY31 (ALONE) 40 FESCUE, TALL, KY31 (MIX)* 20 SERICEA LESPEDEZA (SCARIFIED) 40 MARCH. 20 - JUNE 15 (SLOW TO BECOME ESTABLISHED) MARCH. 20 - JUNE 15 (SLOW TO BECOME ESTABLISHED) 8-12 APRIL - JULY 15 (QUICK COVER, SOD F FORMING, PARTIAL WINTERKILL) APRIL - JULY 15 (QUICK COVER, SOD FORMING, PARTIAL WINTERKILL) AUG. 15 - OCT. (SELDOM SEED ALONE, NOT FOR DRY OR WET SITES) AUG. 15 - OCT. (SELDOM SEED ALONE, NOT FOR DRY OR WET SITES) AUG. 20 - OCT. (GOOD FOR SLOPES, CUTS, AND FILLS THAT REQUIRE LOW MAINTENANCE) *MIX MEANS 2 OR MORE LONG TERM SPECIES PLUS SHORT TERM SPECIES. FOR DETAILS ON MIXES CONSULT THE GREENVILLE SOIL AND WATER CONSERVATION DISTRICT (864-467-2755, 108) SOIL AMENDMENTS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 4,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE 10-10-10 FERTILIZER. APPLY 4,000-5,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCHING MATERIAL. ANCHOR MULCH BY TACKING WITH ASPHALT, ROVING, OR NETTING. NETTING IS THE PREFERRED ANCHORING METHOD ON STEEP SLOPES. MAINTENANCE RE -FERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. MAY BE MOWED ONCE OR TWICE A YEAR, BUT MOWING IS NOT NECESSARY. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. PROVISIONS FOR PERMANENT GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. Environment & Infrastructure 2801 YORKMONT ROAD 4v amec SUITE 100 CHARLOTTE, INC 28208 foster TEL: (704) 357-8600 FAX: (704) 357-8638 wheeler LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 0 TZ N l J Q0 C) 0 C) N TITLE DAN RIVER SCARP REPAIR ACCESS ROAD DUKE ENERGY ISSUE NO. DR -131 DAN RIVER STEAM STATION F FOR GENERAL NOTES PERMANENT CROSSING SEAL DUKE ENE RGY� SCALE: AS SHOWN DES: RLK DWG TYPE: DWG DFTR : RLK 008/24/2017 CHKD: JMB DABTE ENGR: JMB FILENAME: .002 GENERAL NOTES.dwg APPD: JMB DWG SIZE DRAWING NO. REVISION ANSI D 22"x34" DNR C901.001.002 0 DESCRIPTION 8 9 10 Plotted By: Bell, Josh Sheet Set: DAN RIVER SCARP REPAIR ACCESS ROAD Layout:.003 SITE AERIAL August 24, 2017 06::02 03pm Q:\Duke\DanRiver\7810150418—Dan River On—Call\Plansheets\DR-0130 ScarpRepairRoadDesign\.003 SITE AERIAL,dwg W ke F 2 3 4 5 6 7 00 \\\\S2O. GM---- ------ / L \ \ \ \ TSTA _ / ��/ / X530- o GM-- GM ° lCN 00- -LID 526 - / / Jto —_ I GM � _ 2 GM G --mac- �- == — __— _�� 4 i MWeI / —GFGXISTINGTj6" PIfG GAS LINE - M W 522 G __ GM j ---G --o-,� CD ---t520 GM — — _ L / 1 G --- -_G / - 1411 �0 M W Qz� MW 8 DNR C901.001.004 IRFV. 0 J 1<1 s S72\ / 670 \ / QD N / i — � ZONE AE 100 -YEAR FLOOD PLAIN LINE Y � " -- - RAILROAD BRANCH CREEK /II I II MW Q� \ - FLOODWAY LINE - \ASH BASIN (SECONDARY CELL) � � \ \ � � 1 � � I I 1 ZONE AE 100 -YEAR FLOOD PLAIN LINE �` = NOTES: 1. SURVEY DATA SHOWN ON THIS SHEET IS FROM A DRAWING TITLED "AERIAL TOPOGRAPHIC SURVEY - DAN RIVER PLANT", PREPARED BY WSP, CARY NC. PHOTOGRAPHY DATE: APRIL 17, 2014. 0 0 FL DWA` /gyp/i REV DATE JOB NO. PROJECT TYPE DES I DFTR I CHKD I ENGR I APPD INCHES 1 2 3 TENTHS 10 20 30 4 5 6 Plotted By: Bell, Josh Sheet Set: DAN RIVER SCARP REPAIR ACCESS ROAD Layout:.004 EXISTING CONDITIONS August 24, 2017 06: 05: 17pm Q:\Duke\DonRiver\7810150418-Don River On-Call\Plansheets\DR-0130 ScorpRepairRoadDesign\.004 EXISTING CONDITIONS.dwg i i / LEGEND g� EXISTING CONTOUR LINES A / -- _. ----G --- EXISTING GAS LINES M W MONITORING WELL GM OO GAS UTILITY MARKER 0 0 z I J O O O O O �0 O F i - I500 I 50 0 50 100 FT TITLE DAN RIVER SCARP REPAIR ACCESS ROAD Environment & . DUKE ENERGY ISSUE NO. DR -131 Infrastructure / DAN RIVER STEAM STATION 2801 YORKMONT ROAD amec SUITE 100 CHARLOTTE, INC 28208 foster TEL: (704) 357-8600 FAX: (704) 357-8638 wheeler EXISTING CONDITIONS LICENSURE: INC ENG: F-1253 INC GEOLOGY: C-247 FOR ' PERMANENT CROSSING SEAL SCALE: AS SHOWN DUKE DES: RLK DFTR: DWG TYPE: DWG RLK ENERGY JOB NO: CHKD: JMB 8/24/ 17 ENGR: JMB FILENAME: .004 EXISTING CONDITIONS.dwg APPD: JMB DWG SIZE DRAWING NO. REVISION ANSI D 22"x34" DNR C901.001.004 0 DESCRIPTION — 7 8 9 10 0 0 z I J O O O O O �0 O F —E— F REQ. 0 2 3 4 5 6 7 8 DNR C901.001.005 MW l G -----G ----- EXISTING 16" PLINE G GAS , ----G ---� G-----G� ----G ----- - - - - _ _ �� / ce) -G ----- _ -- �' ---G -\ EXISTING 8" PNG GAS LINE - / ---G --- _/ / _ _ 3 I I I 520 \ G M 007 GRAVEL ACCESS DRIVE / 30 / \ I I I / REALIGNMENT OF EXISTING GRAVEL DRIVE \ \ / Ln �\ `� A `\ �\ / / RAILROAD BRANCH CREEK I \ \ I v v v \\ 11\ 007 GRAVEL ACCESS DRIVE 20' DIA. BUFFER AROUND JERSEY MONITORING WELL \ � I (TYP.) \ I JERSEY BARRIER (TYP.) ASH BASIN\ 1 1 \ (SECONDARY CELL) \\ `\ \ \ \\ \ N \ 1 1 1 11 \ \ 1I1�\ I I I II W I\ \ 1 \\\\\ FILL WITH \ CLEAR TREES AND VEGETATION, I I I CLASS A RIP RAP / AND REMOVE STUMPS TO GRADE I I I \� 1 �1 \\�I II If 3 SEE ACCESS ROAD TYPICAL I I SECTION DETAIL •007 ZONE AE 100 -YEAR / FLOOD PLAIN LINE GRADE TO TIE IN NO GREATER THAN 41H:1V EX MON #28 STAKE / NORTHING: 998772.41 / / / /� �/ �i �� ����` I 007 PERMANENT EASTING: 1790960.69 % / / / / / / / I �� � . CHANNEL CROSSING GRADE TO TIE IN NO GREATER THAN 4H:1 V / 500 LEGEND EXISTING CONTOUR LINES ---G ----- --- EXISTING GAS LINES PROPOSED CONTOUR LINES M w Q� MONITORING WELL G M OO GAS UTILITY MARKER 30 0 30 60 FT FLOODWAY LINE \� TITLE / Environment & DAN RIVER SCARP REPAIR ACCESS ROAD Infrastructure DUKE ENERGY ISSUE NO. DR -131 2801 YORKMONT ROAD DAN RIVER STEAM STATION SUITE 100 amec CHARLOTTE, NC 28208 foster TEL: (704)357-8600 ROAD DESIGN PLAN FAX: (704) 357-8638 LICENSURE: whee er NC ENG: F-1253 FOR NC GEOLOGY: C 247 PERMANENT CROSSING NOTES: SEAL SCALE: AS SHOWN 1. SURVEY DATA SHOWN ON THIS SHEET IS FROM A DRAWING TITLED "AERIAL TOPOGRAPHIC SURVEY - DAN RIVER PLANT", PREPARED BY WSP, CARY NC. PHOTOGRAPHY DATE: APRIL 17, 2014. DUKE REV DATE JOB NO. PROJECT TYPE DES I DFTR I CHKD I ENGR I APPD INCHES 1 2 3 TENTHS 10 20 30 4 5 6 Plotted By: Bell, Josh Sheet Set: DAN RIVER SCARP REPAIR ACCESS ROAD Layout:.005 ROAD DESIGN PLAN August 24, 2017 06: 07: 21 pm 0: \Duke\DanRiver\781015041 8—Dan River On—Call\Plansheets\DR-0130 Scarp RepairRoadDesign\.005 ROAD DESIGN PLAN.dwg DWG TYPE: DWG ENERGY JOB NO: 8,24/ 17 FILENAME: .005 ROAD DESIGN PLAN.dwg DWG SIZE DRAWING NO. ANSI D 22"x34" DNR C901.001.005 DESCRIPTION — 7 8 9 10 I I I I DES: RLK DFTR: RLK CHKD: JMB ENGR: JMB APPD: JMB REVISION 0 M 0 TZ /v I Q0 0 C) CD S V 1 I7 0 F Plotted By: Bell, Josh Sheet Set: DAN RIVER SCARP REPAIR ACCESS ROAD Layout:.006 EROSION CONTROL August 24, 2017 06:10: 39pm Q:\Duke\DanRiver\7810150418—Dan River On—Call\Plansheets\DR-0130 ScarpRepairRoadDesign\.006 EROSION CONTROL.dwg E- F 2 GEOTEXTILE NON -WOVEN FILTER FABRIC (MIRAFI 180N OR APPROVED EQUIVALENT) �12" ABC STONE 20'� APPROVED EQUIVALENT :HANNEL BANK I 5 STREAM CROSSING PROFILES NOT TO SCALE VARIES 48" HDPE PIPE 36" HDPE PIPE 56 FEET 4STREAM CROSSING PLAN VIEW NOT TO SCALE (SHOWN UNDER 36 INCH PIPE - SEE SECTION) DESCRIPTION THE WORK SHOULD CONSIST OF INSTALLING A TEMPORARY PUMP AROUND AND SUPPORTING MEASURES TO DIVERT FLOW AROUND IN -STREAM CONSTRUCTION SITES. IMPLEMENTATION SEQUENCE SEDIMENT CONTROL MEASURES, PUMP -AROUND PRACTICES, AND ASSOCIATED CHANNEL AND BANK CONSTRUCTION SHOULD BE COMPLETED IN THE FOLLOWING SEQUENCE: 1. CONSTRUCTION SHOULD NOT BEGIN UNTIL ALL SEDIMENT AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. THE CONTRACTOR SHOULD STAY WITHIN THE LIMITS OF THE DISTURBANCE AS SHOWN ON THE PLANS AND MINIMIZE DISTURBANCE WITHIN THE WORK AREA WHENEVER POSSIBLE. 2 UPON INSTALLATION OF ALL SEDIMENT CONTROL MEASURES, THE CONTRACTOR SHOULD BEGIN WORK AT THE UPSTREAM SECTION AND PROCEED DOWNSTREAM BEGINNING WITH THE ESTABLISHMENT OF STABILIZED CONSTRUCTION ENTRANCES. IN SOME CASES, WORK MAY BEGIN DOWNSTREAM IF APPROPRIATE. WORK SHOULD NOT BE CONDUCTED IN THE CHANNEL DURING RAIN EVENTS. 3 SANDBAG DIKES SHOULD BE SITUATED AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE WORK AREA AS SHOWN ON THE PLANS, AND STREAM FLOW SHOULD BE PUMPED AROUND THE WORK AREA. THE PUMP SHOULD DISCHARGE ONTO A STABLE VELOCITY DISSIPATER MADE OF RIPRAP OR SANDBAGS. 4 WATER FROM THE WORK AREA SHOULD BE PUMPED TO A SEDIMENT FILTERING MEASURE SUCH AS A DEWATERING BASIN, SILT BAG, OR OTHER APPROVED SOURCE. THE MEASURE SHOULD BE LOCATED SUCH THAT THE WATER DRAINS BACK INTO THE CHANNEL BELOW THE DOWNSTREAM SANDBAG DIKE. 5 THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ACCESS TO AND MAINTAINING ALL EROSION AND SEDIMENT CONTROL DEVICES UNTIL THE SEDIMENT CONTROL INSPECTOR APPROVES THEIR REMOVAL. 6. AFTER CONSTRUCTION, ALL DISTURBED AREAS SHOULD BE REGRADED AND REVEGETATED AS PER THE PLANTING PLAN. 12" DIAMETER FILTREXX® CHECK DAM TWO (2) 2" X 2" X 36" WOODE STAKES PLACED 50A u MAX WATER LEVEL 4" MINIMUM FREEBOARD -------------- --------------- TWO (2) 2" X 2" X 36" WOODEN STAKES PLACED 10' O.C. SINGLE INSTALLATION SECTION GENERAL NOTES: 1. COMPOST SOCKS SHALL BE INSTALLED AS NEEDED BASED ON FIELD CONDITIONS. 2. ADJOINING SECTIONS OF THE SILT SOXX SHALL BE OVERLAPPED A MINIMUM 18 INCHES AND STAKED AT THE OVERLAP. PLAN VIEW DEWATERING DEVICE / SILT BAG (SEE DETAILS) 12" DIAMETER FILTREXX® SOXXTM INSPECTION AND MAINTENANCE NOTES: 1. ALL EROSION AND SEDIMENTATION CONTROL DEVICES AND PLANTED AREAS SHALL BE INSPECTED EVERY SEVEN (7) CALENDAR DAYS AND AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS ONE-HALF (1/2) INCH WITHIN A 24-HOUR PERIOD. DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED OR REPLACED, AS NECESSARY, AS SOON AS PRACTICAL. 2. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 1/3 THE HEIGHT OF THE DEVICE. 3. REMOVED SEDIMENT SHALL BE PLACED IN STOCKPILE STORAGE AREAS OR SPREAD THINLY ACROSS DISTURBED AREA. STABILIZE THE REMOVED SEDIMENT AFTER IT IS RELOCATED. 4. REMOVE TEMPORARY E&SC MEASURES UPON STABILIZATION OF THE TRIBUTARY DRAINAGE AREA. REMOVE ALL CONSTRUCTION MATERIAL AND SEDIMENT, AND DISPOSE OF THEM PROPERLY. COMPOST SOCKS MAY BE ABANDONED BY CUTTING THE SOCK MATERIAL AND SPREADING THE COMPOST IN-PLACE. GRADE THE DISTURBED AREA TO DRAIN AND STABILIZE ACCORDINGLY. DNR C901.001.007 IREV. 0 STABILIZED DISCHARGE AKtA SECTION A -A IMPERVIOUS SHEETING IMPERVIOUS SHEETING WORK AREA 6 FEET 6 FEET WORK AREA 0 0 X\Y /AV//A\/ /AV/ /A\ X /AW �nvi /�� inv ,,,, v i�V/AW/x //AV/' CROSS SECTION OF SANDBAG DIKE CROSS SECTION OF STONE DIKE 5 PUMP AROUND DIVERSION DETAIL .007 NOT TO SCALE REV I DATE I JOB NO INCHES 1 2 3 TENTHS 4 5 Plotted By: Bell, Josh Sheet Set: DAN RIVER SCARP REPAIR ACCESS ROAD Layout:.007 DETAILS August 24, 2017 06: 11: 27pm Q: \Duke\DanRiver\7810150418_Dan River On—Call\Plansheets\DR-0130 ScarpRepairRaadDesign\.007 DETAILS.dwg PROJECT TYPE DES DFTR CHKD ENGR APPD 6 DESCRIPTION COMPOST SOCK NOT TO SCALE �I 1.0' MIN Environment &IT Infrastructure 1 2801 YORKMONT ROAD amec SUITE 100 CHARLOTTE, NC 28208 foster TEL: (704) 357-8600 FAX: (704) 357-8638 wheeler LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 SEAL PYRAMID INSTALLATION SECTION 20.0' 12" DIAMETER FILTREXX® SOXXTM DEN STAKES 12" DIAMETER FILTREXX® SOXXTM THREE (3) 2" X 2" X 36" WOODEN STAKE PLACED 10' O.C. 1 ABC STONE 1 MAX. —III- _ I11=1II EXISTING GRADE l ,III IIII III III Ii1111111I�1 �II1IIII�IIIII.ILIIILL—IIII,I,IIIIIII�I1111II�IIIIIII—I,I GEOTEXTILE - NON -WOVEN FILTER FABRIC (MIRAFI 180N OR APPROVED EQUIVALENT) 3 ACCESS ROAD TYPICAL SECTION 07 NOT TO SCALE TITLE DAN RIVER SCARP REPAIR ACCESS ROAD DUKE ENERGY ISSUE NO. DR -131 DAN RIVER STEAM STATION DETAILS FOR PERMANENT CROSSING STREAM SCALE: AS SHOWN DISCHARGE HOSES DIVERSION PUMPS FILENAME: .007 DETAILS.dwg r P ANSI D 22"x34" DNR C901.001.007 INTAKE 10 P DEWATERING PUMP HOSE ""------- A A r' " FLOW FLOW ----'" INTAKE I 1 HOSE COFFER DAM LEAN WATER ( DIKE PUMPS SHOULD CROSSING DISCHARGE EXTENTS �� ONTO A STABLE VELOCITY DISSIPATOR MADE OF RIPRAP OR WORK AREA SANDBAGS SECTION A -A IMPERVIOUS SHEETING IMPERVIOUS SHEETING WORK AREA 6 FEET 6 FEET WORK AREA 0 0 X\Y /AV//A\/ /AV/ /A\ X /AW �nvi /�� inv ,,,, v i�V/AW/x //AV/' CROSS SECTION OF SANDBAG DIKE CROSS SECTION OF STONE DIKE 5 PUMP AROUND DIVERSION DETAIL .007 NOT TO SCALE REV I DATE I JOB NO INCHES 1 2 3 TENTHS 4 5 Plotted By: Bell, Josh Sheet Set: DAN RIVER SCARP REPAIR ACCESS ROAD Layout:.007 DETAILS August 24, 2017 06: 11: 27pm Q: \Duke\DanRiver\7810150418_Dan River On—Call\Plansheets\DR-0130 ScarpRepairRaadDesign\.007 DETAILS.dwg PROJECT TYPE DES DFTR CHKD ENGR APPD 6 DESCRIPTION COMPOST SOCK NOT TO SCALE �I 1.0' MIN Environment &IT Infrastructure 1 2801 YORKMONT ROAD amec SUITE 100 CHARLOTTE, NC 28208 foster TEL: (704) 357-8600 FAX: (704) 357-8638 wheeler LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 SEAL PYRAMID INSTALLATION SECTION 20.0' 12" DIAMETER FILTREXX® SOXXTM DEN STAKES 12" DIAMETER FILTREXX® SOXXTM THREE (3) 2" X 2" X 36" WOODEN STAKE PLACED 10' O.C. 1 ABC STONE 1 MAX. —III- _ I11=1II EXISTING GRADE l ,III IIII III III Ii1111111I�1 �II1IIII�IIIII.ILIIILL—IIII,I,IIIIIII�I1111II�IIIIIII—I,I GEOTEXTILE - NON -WOVEN FILTER FABRIC (MIRAFI 180N OR APPROVED EQUIVALENT) 3 ACCESS ROAD TYPICAL SECTION 07 NOT TO SCALE TITLE DAN RIVER SCARP REPAIR ACCESS ROAD DUKE ENERGY ISSUE NO. DR -131 DAN RIVER STEAM STATION DETAILS FOR PERMANENT CROSSING DUKE ENERGY SCALE: AS SHOWN DWG TYPE: DWG JOB NO: 8/24/ 17 FILENAME: .007 DETAILS.dwg DWG SIZE DRAWING NO. ANSI D 22"x34" DNR C901.001.007 9 10 DES: RLK DFTR: CL CHKD: JMB ENGR: JMB APPD: JMB REVISION 0 m 0 F