Loading...
HomeMy WebLinkAbout20081213 Ver 2_More Info Received_20081125??? Kimley-Horn and Associates, Inc. Transmittal Suite 300 4651 Charlotte Park Drive Charlotte, North Carolina 28217 TEL 704 333 5131 FAX 704 333 0845 Date: November 24, 2008 Job Number: 018253026 Project Name: South Tract City Blvd Development Stormwater Management Plans To: Joseph Gyamfi Division of Water Quality 2321 Crabtree Blvd, Suite 250 D Raleigh, NC 27604 NQ? ?+ 919-715-3473N We are sending these by ? U.S. Mail ? Other: We are sending you N Attached ? Shop Drawings ? Other: EY-P CA-(x1-13 V2 N FedEx ? Hand Deliver Under separate cover via the following items: N Prints/Plans ? Samples Specifications []Change Orders Copies Date No. Description 2 11/24/08 1 Revised South Tract City Blvd Stormwater Management Plans 2 11/24/08 2 Revised South Tract City Blvd Stormwater Management Calculations 2 11/24/08 3 Page 4 of Stormwater Application with Initials These are transmitted as checked below: N For your use ? Approved as submitted Resubmit ? Copies for approval As requested ? Approved as noted r-1 Submit ? Copies for distribution N For review and comment ? Returned for corrections ? Return ? Corrected prints Copy to: Signed Beverly Rosenbloom, E.I. Page 1 ¦ Revised Stormwater Management Calculations South Tract City Boulevard Development Prepared for: Crescent Resources, LLC 400 S. Tryon Street, Suite 1300 Charlotte, North Carolina 28202 © Kimley-Hom and Associates, Inc. 2008 P1R@RPwR5 NO V 2.5 2008 DENk As, UUr4t 1 Y ? ? ? Kimley-Horn WETLAN s% ORMWAIER BWWCH and Associates, Inc. IDS - 1 01 1?) u a. SOUTH TRACT CITY BOULEVARD DEVELOPMENT CHARLOTTE, NORTH CAROLINA REVISED STORMWATER MANAGEMENT CALCULATIONS Prepared for: Crescent Resources, LLC 400 S. Tryon Street, Suite 1300 Charlotte, North Carolina 28202 Prepared by: Kimley-Horn and Associates, Inc. 4651 Charlotte Park Drive, Suite 300 Charlotte, North Carolina 28217 NOVEMBER 2008 KRA Ref: 018253026 ess/ TABLE OF CONTENTS OVERVIEW SITE MAPS SITE VICINITY MAP SCS SOIL SURVEY FEMA FIRM PANEL WATERSHED MAPS PRE-DEVELOPMENT WATERSHED MAP POST-DEVELOPMENT WATERSHED MAP WATER QUALITY WET POND CALCULATIONS ANTI-FLOTATION DEVICE CALCULATIONS VOLUME AND SURFACE AREA TABLES WET DETENTION BASIN SUPPLEMENT FORMS WATER QUANTITY CURVE NUMBER CALCULATIONS TIME OF CONCENTRATION CALCULATIONS HYDROCAD HYDROLOGY REPORT STORMWATER MANAGEMENT CALCULATIONS i South Tract city Boulevard Development, Charlotte, NC OVERVIEW ' Background This report contains the approach and results of a stormwater analysis conducted for the South Tract City Boulevard Development. The 41-acre project site is located in the south east quadrant of the interchange of Interstate 85 and City Boulevard in the City of Charlotte (see vicinity map). The site has been mass graded per City of Charlotte permit number GRS-2007223. ' Existing Conditions The existing on-site conditions (before mass grading) consisted of woods and meadow therefore this ground cover was used in the analysis. The site topography varies from elevation 770 ft to elevation 720 ft. Site runoff discharges into an existing stream in the middle portion of the site. This stream drains to a culvert under City Blvd. Floodplain/Floodway The proposed site does not lie within a 100-year floodway boundary as determined by FIRM Panel # 3717900070C. Water Quality Water quality treatment by means of permanent Best Management Practices (BMP's) will be provided using two wet ponds as treatment. The ponds are designed to treat the first inch of runoff per the Stormwater Model Ordinance for North Carolina and will draw down over a period of two to five days. Wet Detention Basin 1 and Wet Detention Basin 2 have been designed to provide a minimum 90% average annual removal of Total Suspended Solids (TSS). Water Quantity The proposed wet detention ponds have been designed to address the water quantity requirements to match pre- and post-development peak runoff rates for the 1-year, 24-hour storm events. (These ponds will also control the peak runoff rates for the 10- and 25-year, 6-hour storm events per the City of Charlotte rezoning notes on Petition 2006-155. However, these water quantity requirements will be reviewed by the City of Charlotte when the site develops.) The 100-year, 24-hour storm event was checked for 6" of freeboard at the top of bank. Results Pre-development 1-yr, 24-hr storm Post-development 1-yr, 24-hr storm DA-1 2.63 cfs 1.51 cfs DA-2 1.57 cfs 1.51 cfs STORMWA TER MANAGEMENT CALCULATIONS South Tract City Boulevard Development, Charlotte, NC 1 1 1 1 1 Conclusion The proposed wet detention basins were designed using methods prescribed by the aforementioned resources. HydroCAD software was utilized to evaluate the pre-development and post-development flow rates. HydroCAD utilizes TR-55 methods of calculating times of concentration (based on sheet, shallow concentrated, and channelized flows) and SCS curve number method of generating hydrographs (results are provided in Appendix C). Based on the analyses provided herein, the proposed system will be adequate to address the stormwater requirements of the North Carolina Department of Environment and Natural Resources, Division of Water Quality. 31 U.KMWA11:K MANAGEMENT CALCULATIONS South Tract City Boulevard Development, Charlotte, NC SITE MAPS STORMWA TER MANAGEMENT CALCULATIONS South Tract City Boulevard Development, Charlotte, North Carolina KACHL_LDEV\018253 Crescent\022\Parcel J\Calculatlons\Storn\SoRs and VIclnlty Map.deg 1ti tir C? 1?1 r 'a i PROJECT LOCATION 2 9I: STIF vt e Y ?a0 Kimley-Horn and Associates, Inc. PARCEL J ROADWAY VICINITY MAP NT S FIGURE 1 . n+QEDWK dM mE UON0I2175 AID DEO NS PF=NTED HEREIN. AS AN HSI1LIMENT OF SERVICE, 0 MEOW ONLY FOR THE PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED, REUSE OF AND INPROFFII IEUANCE ON THIS DMINE NT IIIHOUT MNTTEN AUTNWATION AND ADAPTATION BY IOILEY-mm AND As90pATM INC. SHALL BE WiNOUT uASEITy TO IOIIEY-MORN AND ASSOCIATES, PM Ke\CHL_LDEV\018253 Crescent\022\Pnrcel J\Cnlculutkm\Storn\SoRS Ond VkWft Mn dw r PARCEL J ROADWAY SCS SOIL SURVEY RGURE Kimley-Horn and Associates, Inc. N l S 2 ' Try 000ADff TTWM MTI THE =X MM MD DESTONS PRESWM HM X AS AM MTRUMM OF SERMM IS BIMMM ONLY FOR THE PURPOSE AID aMff FOR M" R an PREPARED. REUSE OF AID B MMM MMMMM ON TM oom%w T MTDDUT =Tram AUDIOItl2 7 M AND ADAPTATION BY MKV-M M AID AMWA= W- SXALL BE g1M0UT UAS UW M O EY-NORM MD &WOM= N0. O? °cm m L H O1 ? ? D y3j? ? y C. J LL m€`n W C r.. ?- u Nry? CVUi Q ¢ o N, m d- t- Cc E a D E DD ¢' YQ 'GO ON D M a' O f W '? Z S - Z?l ?? `1? C roy - i 4 (r Q Z d° c d?+ I-2 d m.??yW E O w cs: a m ?- c C', w a g o o d E L O co z A R w 2 4 ac`---? ?? d N C ?Z O y-0 LO 661 p U o _O Em t11m N d yd jW E; -Do .00 'I U z L T m O lJ? J 10 -j c ' C U _ w C p O cH L- u RE' a - G = w X o z a°? 6 car b? } m w v a v) v : E m r Z CA U p m o o` m z _+? d m o Q ` C J Q a x O Q .. d m W D J ` 0 LL n° ?°s i. T7 Q O U Ci A W ¢I ?l e v s a m m°?; `? p c m a L O (? W Z u m k, r ..e d a O t ao Cl) NL ? :0 z C a w o f_ ?`rE u mFEw E q ?LL ?+LL L m C 0 yO CJ E- D pp U V N N Y Q p O .E L IV W b m E o? Po doe P o ®? P P EFdELL0 y (V CmyY > ? m a c - E E d U y D E Q.O m" x v Z?VQ Nr ° Z N X. ar -M ... ;iL - D J P 6?5 s ul.- \:? ?S N : 9 6fi0 w w 664 X61 N t 0 a x w O 0 V N ? X Co ul 6 Z' i 0!: . Q w Z x Z' N hl q --r u x W Z O N O x w? Z? 7 N x ul z 0 N 1n ? S O OD C ` ao 0- CL E 2 o O Vv D m fl 3 C O b T o W J C7 Q a 0 U r^^ V) ?LL D Q C C D y tti U ~ LL :S?u ?W WQ W L.Ai C" Q V) ti l W 03 CV C p L ?- J J so was Z Q'J ' Ic- Q ¢ 2 S«? d? i-2 u - W Q z e 7 U Q C < m d? a?3 ?_ Q a W N le W O I:? E ?o- m tm m €e u? O . m v U 4 inn c °? W m Z z ? u. a W O i F 0 0 Q 6 ,E ?µ4A? = ? Ci G' X r o n e U a } 4 N Li U zoe 2 m Z U ° as ° 0 m> ?nS v ! ? W yU N Z E a a m i OS W s W C? ??1 y 7 ?`? 'F r U '4 ? ,w WO ° t E O z f W •D z Z~ u 2r f u _ t L¦ yy co, ? fig F O.. N U f u r Z °. $ U I w Bo tae 60 ??® 9 @ 6O LL ? d ? L G m m y C 7 d ? D n C d ? U E '.-D o E D D U L LL m o m m?7Z `D m c„ -- m °. aD a m o E a E a o g m m m W D EEM .7 o d 2 Q C Ca 2111 U LL r?A7I D 'o a. 0X 2$ mH?°o o E m d alLtmU U ca m L to E CLL D 0aE C m L Y m m d .1 'o E a m _mmm d o'I Q o g a ° c o r 0 r 0 r 0 n o r a m a (D a to m o m o m o 1o w _m m m m _m _m m m _m m m m m n m \\? \\ \ " " .? Q LL P U m m m m m m m m m co m 1n 1n N 10 N m N In N m N 1D N 1o N 1n N In N 0 N m N to N m N U 'O D C) I `?. ?'•. .' ? ?\ - - - - - - - - - - - - " Q m m m m m r co m m N r co m r C C) m m m m ID d' C m N m m m) N N r r m m r m N M V M M N r m m M N M O r m 'D 1D m y y N N r M'- C 1D ? 1D m m a m m m r N r N r N N r N l7 r P1 V m O 10 m In O m m fD b . \. i ? \ . Q W W ?? \\ i Q w Q w 2 w w [L u by \? o E ` LL U° m Q m U O W LL fJ S - 7 1C J } m Q } Q m U O w U. (J S Y J e D n \ ?? ??{" `l ^ y O m e [/ to RJ Z O N ?isb x W s A ,` p•? X LUZ cc x s W 02 ? 4,31 W / m Z Z LU O' NQ Z s ?\ OX? WO HJno-nnooW -- 'l N X t11 Q LU 0 c O m 1 - 1\' N 1r1 - t. ` ? n LU c.` `,z Z? O L ? ? N O ? L O ^ 4/ 'a 7 m 11 O m r U o? W J ` U Qo co ?LL O N C C O > V V _ D :?YS a W O J W Z Q EL Q LID ] w h c 5 LLJ le ' Q [. ¢ Z o y C-1) y? fw' L I {y T ', CC ? FO.1 O o h Z W () m z D z s t _? a x d .. ? 0 ? ' 1. ¦? 0 V .Wei A i O A W ? W N .°r 2I F 5 LL G z < d m u v f u & = W W o ? W W • m? ^ co v ?O CC'V N s zc4 - 6 P` q ? ~ ' v r 9 r 'a C . A = 8 a w ac ? LLB mo se s c°o LL Wm O C - • W LL e ?d _ ? C p S - ` `+'T pen V t s Eop ?` t. C2 m o t °s W e;d_r n -O+8 a` 4 0 a 4i •0 =as • s w EF?lq 6 0d o e P o ?? 9 6 ? P N D y U m d u y C ? y D1 D N " d C ° ? U E?voE 'D .. Q O 0 dwLL V d C y o m US Ld m N m?PZD d N D U) d0 D E m C 0! U M bm`N_ ?FcEELL C?Q C LL. W D J U 4 S 7 N nOLO« mF? a? EmL >IL L ? U D m D L L N D- N W E E 0,0Z 0 9 D °S E W L U E m y W2 m E.0 rn b ° 0 0) ° Fc3 ;? Iz. Cv c u J ? LLJ 7m i > k -J y1 ? pt'?n^"' lit Z 2 n V\ \ \ . o N? v `. \ by PRE-DEVELOPMENT WATERSHED MAP STORMWATER MANAGEMENT CALCULATIONS South Tract City Boulevard Development, Charlotte, North Carolina ? = >- SNOISIn3a 31WO 'ON SBZBZ ON'31101NVH3 Z9Z9Z'VNI108VO H1HON 4 0 G Sw3wwoe orma aNnoalsal3 aid SN01sln3u aaeun I OOEL'31S '13381SNOA81 SOO6 A1Nnoo o8naN3lNO3W'31101HVHO m Q OATS A11O ONV 99-1 s a a N 6 ;, Z R S1N3WWO30 aW1OUaMO33L3dSNOISIA3N S ZfkI Z Ol'i'S3ounoS3211N3OS380 d` VY V321V ro E °j x^ G 7ZZ 3JVNIVa41N3WdOl3n30-321d ?- amd 1Hawaevm HalvmMois a _ k Lu E ik?ggpk , OUMMOB AMO L*VHI H11109 ?4 A?d3Y30 d U-1 6 ui FI / i r?.y ?; ry v ? /? ... .•i i •? ?' 176 7 P w , r CD 'X W 1, 8 i t / 0 w uo w$ U S x a? S . . M r POST-DEVELOPMENT WATERSHED MAP STORMWATER MANAGEMENT CALCULATIONS South Tract City Boulevard Development, Charlotte, North Carolina a swlsdad i w ON SSZBZ 0N'3110I8VH3 Z9Z9Z'VNII0NV0 HiHON ' Z cwawwoo tw:O ONnodssdld aaa sNOlslnsd slN3wva00rm0 aNrwd aNO0ds n3a sNOlslnatl MtMt sarvil l z 00C1319.133NIS NOA8iS 000 0I1'9308f10S3211N30S3210 3110IMVH3 A1NnoDsun0N3IA33W OAIS 41I0 ONV Se-I dVVy V38V g a a c n `V ' E mj " €333 2 b 3`JVNIVa01N31Nd013A30-1S0d f V _ g-? zi SNVId 1N3W30VNVW N3IVMWN018 g X g p E ? y k a ? lr b awymnoe 11191am Him ? 1 1J LL Y ?9a8?Po a N3ro :gram - o s $ a c ??. ??1` 'd??/,/ ? : fu//',I?1 ? Tj??lq..?? ??• any /- _ *- f/r it I III1 LLJ LIJ w ' z Q o ? ? ? r 1 I 10 -rYlf 4 ,/t/ r i ?"? r ll yi Y r 11 O Z u'i o ¢ V r v O t t Z Q 'A 4 Z Lo l > .Y f ri. t +e` ...II , Y i i 1 s'.il 1 r7? - i '?. I1kL 7 }III ! ? , I , IA I p ? f:, F t?l jl F r? i I: , I I. rC? ? ? f - ?i' ) 1 t - - - ;! I _ \ li „ - n ai ¦ --------------- " fp ) t 'I fV 01 V I J-? T, 1 I f t. Z i e? ^±- ?i p lI ( N r I ? I n ? I -I , a , u ?U ! I l I ?- . I ? I ? ) I 1 I ? III I: 7777 I ; y p mom I' { I a ? i z Y 1 , i ? F `I I \ II 1 Y , x Al I { - 1 ? r . .1 ' s Z ZUr.g ? .. u' ? rr NFU uj t t i l:.. Q Vi ' r 3 H C r ? , r s ' ? 1 ? Its , I I 4 i f t I . ? 11 ---prryis ...:::.......e,..,.,......:,.......... .......,,.. ,. WET POND CALCULATIONS STORMWA TER MANAGEMENT CALCULATIONS ' South Tract City Boulevard Development, Charlotte, North Carolina PP- Kimley-Horn and Associates, Inc. WET DETENTION BASIN Project Information Project Name: Belgate - Southern Tract KHA Project #: 018253026 Designed by: BRR Date: 1018/2008 Revised by: BRR Date: 10/27/2008 Revised by: BRR Date: 11/14/2008 Site Information Sub Area Location: Drainage Area 1 Drainage Area (DA) = 7.15 Acres Impervious Area (IA) = 6.43 Acres Percent Impervious (1) = 89.9 % Required Surface Area Permanent Pool Depth: 4 ft SA/DA = 4 (90% TSS Removal via Pond) Min Req'd Surface Area = 12458 sf (at Permanent Pool) Required Storage Volume: Design Storm = 1 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 +. 009 (1) = 0.86 inrn Storage Volume Required = 22305 cf (above Permanent Pool) Elevations Area (s.f.) Bank Elevation = 732.00 ft Top of Pond Elevation = 732.00 ft Temporary Pool Elevation = 727.70 ft 19,373 Permanent Pool Elevation = 726.00 ft 14,257 Shelf Beginning Elevation = 726.50 ft Forebay Weir = 728.00 ft Shelf Ending Elevation = 725.50 ft Sediment Cleanout Elevation = 718.00 ft Bottom Elevation = 717.00 ft Wet Basin Areas/Volumes (Elevation = 727.70) Area @ Top of Temporary Pool = 19373 sf (Elevation = 726.00) Area @ Top of Permanent Pool = 14257 sf Volume of Temporary Storage = 28586 cf Side Slopes of Pond = 3 : 1 Side Slopes of Shelf = 1 0 : 1 Side Slopes of Pond (below shelf) = 3 : 1 Yes ( 14257 > 12458) sf Is Permanent Pool Surface Area Sufficient (yes/no)? Volume of Storage Provided 28586 cf Total Volume Sufficient (yes/no)? Yes Orifice Size = 2.30 inches r i WET DETENTION BASIN Project Information Project Name: Belgate - Southern Tract KHA Project #: 018253026 Designed by: BRR Date: Revised by: Date: Revised by: BRR Date: Site Information 4/1/2008 11/14/2008 Sub Area Location: Drainage Area 1 Drainage Area (DA) = 7.15 Acres Impervious Area (IA) = 6.48 Acres Percent Impervious (1) = 90.6 % (Drainage Area) Orifice Sizing Q2 Days = 0.1654 cfs Qs Days = 0.0662 cfs Orifice Size = 2.30 in Q orifice = 0.102 cfs Drawdown Time = 3.3 days less than 5 days (yes/no) ? yes greater than 2 days (yes/no) ? yes (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) Orifice Equation: Q=cAgV(2gh) Q2 < Q < Q5 c = 0.6 A9= Area of Pipe = Tr/4D2 g = gravity = 32.2 ft/s2 h = orifice head = 1/3 (TPE-PPE-1/2D) TPE = Temporary Pool Elevation PPE = Permanent Pool Elevation D = Diameter 1 1 1 1 1 1 1 1 1 1 1 1 PP-Z" Kimley-Horn I , and Associates, Inc. WET DETENTION BASIN Project Information Project Name: Belgate - Southern Tract KHA Project #: 018253026 Designed by: BRR Date: 10/8/2008 Revised by: BRR Date: 10/19/2008 Revised by: BRR Date: 11/14/2008 Site Information Sub Area Location: Drainage Area 2 Drainage Area (DA) = 24.40 Acres Impervious Area (IA) = 18.30 Acres Percent Impervious (1) = 75.0 % Required Surface Area Permanent Pool Depth: 4.35 ft SA/DA = 3.375 (90% TSS Removal via Pond) Min Req'd Surface Area = 35872 sf (at Permanent Pool) Required Storage Volume: Design Storm = 1 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 +. 009 (1) = 0.73 in/in Storage Volume Required = 64215 cf (above Permanent Pool) Elevations Area (s.f.) Bank Elevation = 725.00 ft Top of Pond Elevation = 725.00 ft Temporary Pool Elevation = 720.60 ft 46,100 Permanent Pool Elevation = 719.00 ft 38,235 Shelf Beginning Elevation = 719.50 ft Forebay Weir = 722.00 ft Shelf Ending Elevation = 718.50 ft Sediment Cleanout Elevation = 712.00 ft Bottom Elevation = 711.00 ft Wet Basin Areas/Volumes Area @ Top of Temporary Pool = 46100 sf (Elevation = 720.60) Area @ Top of Permanent Pool = 38235 sf (Elevation = 719.00) Volume of Temporary Storage = 67468 cf Side Slopes of Pond = 3 : 1 Side Slopes of Shelf = 1 0 : 1 Side Slopes of Pond (below shelf) = 3 : 1 Is Permanent Pool Surface Area Sufficient (yes/no)? Yes ( 38235 > 35872) sf Volume of Storage Provided 67468 cf Total Volume Sufficient (yes/no)? Yes Orifice Size = 2.90 inches WET DETENTION BASIN Project Information Project Name: Belgate - Southern Tract KHA Project #: 018253026 Designed by: BRR Date: Revised by: BRR Date: Revised by: BRR Date: Site Information Sub Area Location: Drainage Area 2 Drainage Area (DA) = 24.40 Acres Impervious Area (IA) = 18.30 Acres Percent Impervious (1) = 75.0 % (Drainage Area) Orifice Sizing 11/14/2008 Q2 Days= 0.3904 cfs (Flowrate required for a 2 day drawdown) Qs Days= 0.1562 cfs (Flowrate required for a 5 day drawdown) Orifice Size = 2.90 in (Diameter) Q office = 0.155 cfs Drawdown Time = 5.0 days less than 5 days (yes/no) ? yes greater than 2 days (yes/no) ? yes Orifice Equation: Q=CAgV(2gh) Q2 < Q < Q5 c = 0.6 A9= Area of Pipe = n14D2 g = gravity = 32.2 ft/s2 h = orifice head = 1/3 (TPE-PPE-1/2D) TPE = Temporary Pool Elevation PPE = Permanent Pool Elevation D = Diameter 10/19/2008 11/3/2008 ANTI-FLOTATION DEVICE CALCULATIONS STORMWA TER MANAGEMENT CALCULATIONS South Tract City Boulevard Development, Charlotte, North Carolina 1 1 1 1 1 1 1 1 1 1 P-.Mn IGdey H.. \' and ASmcM, NC. NCDENR ANTIFLOATATION DEVICE DESIGN CALCULATIONS (per NCDENR Manual) Project Information Project Name: Belgate - Southern Tract KHA Project #: 018253026 Designed by: BRR Date: 1113/2008 Revised by: Date: Revised by: Date: Revised by: Date: Pond 7 Drainage Area Information: Drainage Area (ac) = 7.15 Flow (Q?) (cfs) = 12.8 Storage Dimensions: Basin Side Slopes I X : 1 ) = 3.0 (3:1 max side slopes) Storage Depth "R" (ft) = 9.0 Elev (ft) Area (SF) Cumulative Volume (CF) Top of Basin Elevation 732.00 27.972 730.00 23.807 124,239 Temporary Pool Elevation 727.70 16.459 77,934 Permanent Pool Elevation 725.00 11,541 54.134 723.00 7.735 25.220 720.00 3,846 7.848 Bottom of Basin Elevation 717.00 1,386 0 Control Structure Length (in) = 48 Control Structure Width (in) = 36 Riser Area (sf) = 12.00 (Check riser geometry vs. area equation) Volume of Water Displaced (cf) = 108.0 Weight of Water Displaced (Ib) = 6,739 Min. Required Weight of Anchor Block (lb) = 7,413 (1.1 factor of safety) Anchor Size: Width (It) = 4.4 Length (If) = 5.0 Height (If) = 4.00 Weight of Anchor (lb) = 7,709 O. K. > Minimum Required Weight Sizing of Emergency Spillway: 0. (cfs) = 12.8 Q.0'". (cfs) = 12.8 (Riser ignored) Water Depth Over Spillway (ft) = 0.5 Spillway Length (ft) = 15.0 (10 ft minimum spillway length, Cw=2.7) Spillway Crest Elevation (ft) = 730.5 (1 ft min. above sediment storage depth) Freeboard (ft) = 1.04 (1 ft minimum) Page 1 of 1 Z Bntl ASSOCWGS,IK. NCDENR ANTIFLOATATION DEVICE DESIGN CALCULATIONS (per NCDENR Manual) Project Information Project Name: Belgate - Southern Tract KHA Project #: 018253026 Designed by: BRR Date: 11132008 Revised by: Date: Revised by: Date: Revised by: Date: Pond 2 Drainage Area Information: Drainage Area (ac) = 23.90 Flow (Q?) (cfs) = 167 Storage Dimensions: Basin Side Slopes L : 1 ) = 3.0 (3:1 max side slopes) Storage Depth "R" (ft) = 7.0 Elev (ft) Area (SF) Cumulative Volume (CF) Top of Basin Elevation 725.00 60.143 723.00 53.616 332,340 Temporary Pool Elevation 720.70 39.312 225.473 Permanent Pool Elevation 719.00 31.750 165,071 716.00 22.055 84,363 714.00 17.794 44.514 Bottom of Basin Elevation 711.00 11.882 0 Control Structure Length (in) = 48 Control Structure Width (in) = 35 Riser Area (sf) = 12.00 (Check riser geometry vs. area equation) Volume of Water Displaced (cf) = 96.0 Weight of Water Displaced (lb) = 5,990 Min. Required Weight of Anchor Block (lb) = 6,589 (1.1 factor of safety) Anchor Size: Width (If) = 41 Length (If) = 4.8 Height (If) = 4.00 Weight of Anchor (lb) = 6,896 O.K. > Minimum Required Weight Sizing of Emergency Spillway: 0. (cfs) = 16.7 Qcrvi,,? (cfs) = 16.7 (Riser ignored) Water Depth Over Spillway (ft) = 0.5 Spillway Length (ft) = 40.0 (10 It minimum spillway length, Cv=-2.7) Spillway Crest Elevation (ft) = 7237 (1 It min. above sediment storage depth) Freeboard (ft) = 1.01 (1 It minimum) Page 1 of 1 VOLUME AND SURFACE AREA TABLES STORMWATER MANAGEMENT CALCULATIONS South Tract City Boulevard Development, Charlotte, North Carolina c c m 8 5 2 aTi Q E? Y m i? c o o O O O N N N O co w N ? N 2 v v cu cu ca 0 0 0 U N C.0 cli ` O Cl) a r ? co 0 0 CO 3 N w cc cr- m m m O c O t4 v ? T 0 m +?u O Z v -o -O C u a 0C_D v? h v 0 .o a N N y 2 Y 0 K K O a` E IB In C O i+ c v v 0 v a1 E Ln r"t 01 o ci l0 w L0 o I, I, Q o 0 0 o L n m y 0) C) j ri N M ?* 0 00 O O v LID Ql V co o ("'I c q O v O C. o Ln w si V n r1 Ln •• r o w .--1 ?--I a--I N N 0 H U O `? U) w N n M O1 o a M N i0 0 0 0 0 0 0 0 0 0 O W N O O O O O O O O O O a J o w v m Lr) 0 Q1 m 0 -1 r m N n m Ln Ln o n 0 ° 0 0 N 0 0 U-) Q a r .i c -i N N m W ? n 00 O1 O -4 N M ?t Ln o f0 a--1 e-I e-i N N N N N N N N n n n n n n n n n n c O O c 0 C a C ra O O Q o v O u E v c C 0 " v ? E . m _ ° a' a N 0 o r-4 n w `i r-1 N n ? 01 0 O 00 1-1 Ln 11 v E iZ ai 2 o E o > v O > Ln T O T La is L0 v E 0 O v O Ll a LL O N N C M Ln n O .-i Ln d w r1 N :T a1 O 0 ri -L M n N O N L1 O n 0 u m O --I 00 00 w m Ln LD i N m -4 O1 n o 0 U 3 O O . . r a O N Lr O 111 N O w N n ' v N Ln O N v L I > ? r-I N m m [ Y Ln Lo n 00 O a) N -i .-i V N 01 N V Ln M Ln M M n ch N n LO n O Ln 01 00 0 0 rn 'n 1-4 w 7 U O O fM r m V o O n n -4 r-L a ri r11 w co w w 01 j v N M ?' Ln n n n CF Ln o 00 Lr NO N N N 0 O f- t6 00 01 co m o n o LO o 0 01 01 Ln n Ln N Ln Ln .-1 .1 Ln M w Ln Ln n n n N V 00 Ln Gt n r1 o m N W m e o co .-I a n n n o o N r-I Ln o a 01 v 0 0 0 0 ?--I c-1 r-1 N i-I N N m CY V V Ln In Ln LO v 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 J a 0 f0 w o e-1 w o Ln 00 ' Ln Ln Ln In ?"1 lzt co N O O m n O M N m n 0 m Ln N n i) w m O o n n V w M o d m m n M n m n Ln rn Ln m 1-1 m m w w w m O a `? ?--I N N m Ln o n n n w -4 ::r x m 1 N N N N CL z 0D n w 01 O r-q N M Ct N lD Ln n n w 0, O 1-1 N .-i -1 .-4 N N N fV N N Ln N LO N n N N m M m N n n n n n n n n n ^ n ^ n n n n n n C 7 O o v O f0 N O a v O a Y a N C d O U O N co u E c E c O Lc p O o v o m a a o O 0 o y` F E F co N t)7 O H a-1 V -i 01 n m .-1 Ln o N w Ln 'i v E It v L > Ln O u7 c c v c Ln m m c Ln i E N v v v 0L a co c a? ° o x ?a E Y N 0 0 0 0 0 0 N N N 01 V' tt r- N O ? r O p p L0 N nz 0 0 0 U h ? m C Q N t u u 10 ? 0 3 N O CY) LO x W Of L9 m m m T E O N 7 O c O R N 3L Y E ° n a w Z o u a Lv V 'p Q N v d = 0 m z 0 a Y a` c m 0 c Lu a) 0 N M lD N Ln M L D m 00 ? ° ° u 2 o o v m n Lr 1 o 0 Lr Lr Q m j N Ln ri ri N N M M 0 M M lD N ri N 1.0 M 3 V O O 00 M Ln co U) M 00 01 - .--I v N N m m Ln t0 O 7 H U La o 00 m Ln m m 00 ri ri rn m .-L ri ri N V t0 O [t co a 0 lD h 00 m O N M CY Lo 0 0 0 0 0 0 --1 e-1 -+ ri W (V o 0 0 0 0 0 0 0 0 0 Q J O m Ln Q:? O ? 1.0 m m 1-4 14 Ln cu w n Ln h ri rn o Ln m -?J- 00 ` L Vf Ln Q N N M m T Ln LO W 0 0 0 C. c-1 N M d' Ln LO n 00 Q1 L0 ei n ri h ri h H h r-I h ri n e-I h i--I h h h ? 3 C c O 0 a N a a 0 U O U E C Q1 c O y m Q Y 0 co a Ln Ln 00 ri N LO LD co n Ln M M 0 ` ? ri II 01 E Q N 3 0 O > lU > c in Lo a L0 Lo E L L L U a U- w M Q1 m n N -4 co ri ri M LO N n w m w LO N ? ri Ol r-1 LD h w ct n 0 0 0 u 0 0 n L m m L n 01 Ln m m m v ri o o m m o0 Q 0 -:;r r-I O r-1 -,F 01 M 00 Ln Ln N -1 O N n Ln Ln -1 m Ln h 01 ri i m i It i LD -1 co -I ri m 00 m 00 v t r r r r r N N N M fn V C v M n a cf 00 LD 00 M O N M LD Lo m m h E h h [F n Ln ri n n N Ln ri 00 00 N M m 3 "' U O O h h 00 rn ri Zzr Ln 00 Q1 O ri LD m O N ct p LO 00 O M Ln M V LO O n co oo r,4 Ln 00 Y e-i ri ri N N N ri ri N N r-I V m m Ln 0 H U m m Ln m Ln n m O o m 00 rn Ln m Ln o Q1 ri h v N O ri m O l0 h O O 00 N LO 00 LD 00 o Lr) O W h ri lD O N ' O m ei M N N N N LI1 W In M 0 O l70 N M M Zt d Ln 111 LD LO h a0 0 0 0 ri N M In 0 0 0 0 0 0 0 0 0 0 o r-I r-I r-I ri 1-1 r-I r-1 J Q N 0 LD Q1 C-tzll ) M Ln kD ri O O 1-1 n 0 01 N t.0 O M N r- n m -i r 0 0 h oo o N Lf1 h h Ol N M 4 LO 00 r i Q r-i r-I r-i e-1 ? N N N N M M It Ln VI Lf1 LO CL Z 0p0 ri N m GY LI1 LD n 00 LQ rn Ln O lD H N M V Ln a-i r-I H I N ci ri r-I 00 ri 0) N 0 N N N N N N h h n h n h h n ^ n ^ n ^ n h n h n -° c 0 c o w o p V) a a y a p v p Y c V1 •V C c O L C 0 Ca C 0 E c O 0- m 0 Y E Y L CC C ~ _ 0 co m a 1.0 a 0 LD n II ri m Ln M n M 01 N ri 00 co M ri ? u 3 0) O IZ 7 V) p +, Y V1 a) lU c c V) N C? c? C C N a1 v C CL a m WET DETENTION BASIN SUPPLEMENT FORMS STORMWA TER MANAGEMENT CALCULATIONS South Tract Ciry Boulevard Development, Charlotte, North Carolina AM7114VAA NCDENR Permit N (to be provided by DWQ) oaoF WArF9pG O T STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION ' Project name Belgate Southern Tract Contact person Beverly Rosenbloom, El Phone number 704-319-7699 Date 11/24/2008 Drainage area number 1 11. DESIGN INFORMATION Site Characteristics Drainage area 311,454.00 ftz Impervious area 280,090.80 ft2 % impervious 89.93 % Design rainfall depth 1.00 in Storage Volume: Non-SR Waters Minimum volume required 22,305.00 ft3 Volume provided 28,586.00 ft3 Storage Volume: SR Waters 1-yr, 24-hr runoff depth in Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations 1-yr, 24-hr rainfall depth 2.58 in Rational C, pre-development 0.28 (unitless) Rational C, post-development 0.88 (unitless) Rainfall intensity: 1-yr, 24-hr storm 0.12 in/hr Pre-development 1-yr, 24-hr peak flow 2.63 ft3/sec Post-development 1-yr, 24-hr peak flow 9.25 ft3/sec Pre/Post 1-yr, 24-hr peak flow control 6.62 ft3/sec Basin Elevations Basin bottom elevation 717.00 ft Sediment cleanout elevation 718.00 ft Bottom of shelf elevation 725.50 - ft Permanent pool elevation 726.00 ft SHWT elevation 712.00 ft Top of shelf elevation 726.50 ft Temporary pool elevation 727.70 ft Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) Ill, DESIGN INFORMATION' Volume and Surface Area Calculations SA/DA ratio 4.00 (unitless) Surface area at the bottom of shelf 8,955.00 ftz Volume at the bottom of shelf 42,518.00 ft3 Permanent pool, surface area required 12,458.00 e Permanent pool, surface area provided 14,257.00 e OK Permanent pool volume 58,619.00 ft3 Average depth for SA/DA tables 4.11 ft OK Surface area at the top of shelf 14,328.00 f 2 Volume at the top of shelf 54,109.00 ft3 Forebay volume 10,977.00 ft3 Forebay % of permanent pool volume 18.73 % OK Temporary pool, surface area provided 19,373.00 f 2 Drawdown Calculations Treatment volume drawdown time 3.30 days OK Treatment volume discharge rate 0.10 ft3/S Pre-development 1-yr, 24-hr discharge 2.63 ft3/s OK Post-development 1-yr, 24-hr discharge 1.76 ft3/s OK Additional Information Diameter of orifice 2.3 in Design TSS removal 90 % Basin side slopes 3.00 :1 OK Vegetated shelf slope 10.00 :1 OK Vegetated shelf width 10.00 ft OK Length of flowpath to width ratio 4.40 :1 OK Length to width ratio 3.30 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 2.25 ft OK Vegetated filter provided? N (Y or N) Design must be based on 90% TSS removal Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies 24-HR EMERGENCY PUMP Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 ' Permit No. (to be provided by DWQ) ' III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. F -C-3- 1 . Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. K C-4 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and -Filter strip. ' ?KK C-7 3. Section view of the dry detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. _C-3 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. ' ?3eC _C-4 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. Attached 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 13KC _Calc book- 7. The supporting calculations. Attached- - 8. A copy of the signed and notarized operation and maintenance (O&M) agreement. -Attached- 9. A copy of the deed restrictions (if required). -Attached- 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. I Form SW401-Wet Detention Basin-Rev.4 Part III. Required Items Checklist, Page 1 of 1 Permit No. (to be provided by DWQ) VfA i NC©ENR O?O? W AT??OG O T STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. 1. PROJECT INFORMATION _ Project name Belgate Southern Tract Contact person Beverly Rosenbloom, El Phone number 704-319-7699 Date 11/24/2008 Drainage area number 2 111. DESIGN INFORMATION Site Characteristics Drainage area 1,062,864.00 ft2 Impervious area 797,148.00 ft2 % impervious 75.00 % Design rainfall depth 1.00 in Storage Volume: Non-SR Waters Minimum volume required 64,215.00 ft3 Volume provided 67,468.00 ft3 Storage Volume: SR Waters 1-yr, 24-hr runoff depth in Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations 1-yr, 24-hr rainfall depth 2.58 in Rational C, pre-development 0.28 _ (unitless) Rational C, post-development 0.79 (unitless) Rainfall intensity:1-yr, 24-hr storm 0.12 in/hr Pre-development 1-yr, 24-hr peak flow 1.57 ft3/sec Post-development 1-yr, 24-hr peak flow 24.36 ft3/sec Pre/Post 1-yr, 24-hr peak flow control 22.79 ft3lsec Basin Elevations Basin bottom elevation 711.00 It Sediment cleanout elevation 712.00 ft Bottom of shelf elevation 718.50 ft Permanent pool elevation 719.00 It SHWT elevation 708.00 ft Top of shelf elevation 719.50 ft Temporary pool elevation 720.60 ft Form SW401-Wet Detention Basin-Rev.4 Parts I. & If. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) II. DESIGN INFORMATION Volume and Surface Area Calculations SAIDA ratio 3.38 (unitless) Surface area at the bottom of shelf 27,740.00 f 2 Volume at the bottom of shelf 133,518.00 ft3 Permanent pool, surface area required 35,872.00 ftZ Permanent pool, surface area provided 38,235.00 ft OK Permanent pool volume 181,976.00 ft3 Average depth for SAIDA tables 4.76 ft OK Surface area at the top of shelf 35,931.00 fe Volume at the top of shelf 165,311.00 ft3 Forebay volume 33,586.00 ft3 Forebay % of permanent pool volume 18.46 % OK Temporary pool, surface area provided 46,100.00 f{2 Drawdown Calculations Treatment volume drawdown time 5.00 days OK Treatment volume discharge rate 0.16 ftN Pre-development 1-yr, 24-hr discharge 1.57 ft3IS OK Post-development 1-yr, 24-hr discharge 1.51 ft3IS OK Additional Information Diameter of orifice 2,9 in Design TSS removal 90 % Basin side slopes 3.00 :1 OK Vegetated shelf slope 10.00 :1 OK Vegetated shelf width 10.00 ft OK Length of flowpath to width ratio 4.10 :1 OK Length to width ratio 3.20 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 2.65 ft OK Vegetated filter provided? N (Y or N) Design must be based on 90% TSS removal Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies 24-HR EMERGENCY PUMP Form SW401-Wet Detention Basin-Rev.4 Parts I. & 11. Design Summary, Page 2 of 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Permit No (to be provided by DWQ) Ill. REQUIRED sITEMS CHECKLIST _ Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. C-3_ 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. C-4 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. S1IVK _C-7_ 3. Section view of the dry detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 9]tX C-3 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. J 't C-4 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, A,ftjApL I - to verify volume provided. ,6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. _Calc book- 7. The supporting calculations. -Attached- 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. -Attached- 9. A copy of the deed restrictions (if required). AO& -Attached- 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.4 Part III. Required Items Checklist, Page 1 of 1 CURVE NUMBER CALCULATIONS STORMWA TER MANAGEMENT CALCULATIONS South Tract City Boulevard Development, Charlotte, North Carolina IIiI? Kimley-Hom U? , and Associates, Inc. Pre vs. Post Runoff Analysis Composite Curve Number (CN) Project Information Project Name: Southern Tract KHA Project #: 018253026 Designed by: BRR Date: 10/6/2008 Revised by: BRR Date: 11/14/2008 Revised by: Date: Drainage Area Name Drainage Location Cover/Soil Name (Type) Cover Description* Hydrologic Soil Group Curve # (CN)** Area (ac) Product of CN x area omposite Curve Number (CN) PRE-DEVELOPMENT DA-1 OUTFALL 1 Mecklenburg, Enon, Wilkes Woods Good Condition C 70 5.04 353 70 Meadow Good Condition B 71 5.04 358 71 10.08 711 70.5 DA-2 OUTFALL 1 Mecklenburg, Enon, Wilkes Woods Good Condition C 70 2.95 207 70 Mecklenburg, Enon, Wilkes Meadow Good Condition C 71 2.95 209 71 Cecil Meadow Good Condition B 58 10.69 620 58 Cecil Woods Good Condition B 55 10.69 588 55 27.28 1624 59.5 Total Pre-development Area = 37.36 POST DEVELOPMENT DA-1 POND 1 Impervious 98 6.43 631 98 Mecklenburg, Enon, Wilkes Open Space - Good Condition C 74 - 0.71 53 74 7.15 683.46 95.60 -- UND DA-1 OUTFALL 1 Mecklenburg, Enon, Wilkes Open Space - Good Condition C 74 1.15 85 74 1.15 85.10 74.00 DA-2 POND 2 Impervious 98 15.40 1509 98 Mecklenburg, Enon, Wilkes Open Space - Good Condition C 74 0.83 61 74 Cecil Open Space - Good Condition B 61 4.11 251 61 Roadway - Impervious 98 2.90 284 98 Mecklenburg, Enon, Wilkes Roadway - Open Space C 74 1.06 78 74 Cecil Roadway - Open Space B 61 0.10 6 61 24.40 2190.07 89.76 UND DA-2 Mecklenburg, OUTFALL 2 Enon, Wilkes Open Space - Good Condition C 74 2.96 219 74 Cecil Open Space - Good Condition B 61 2.97 181 61 ] 1 5.93 400.21 67.49 Total Post-development Area = 38.63 * Cover Descriptions per TR-55 Manual ** From TR-55 Manual, Table 2-2 a & c K:\CHL_LDEV\018253 Crescent\026 Belgate\Belgate Stormwater Management Plan\Calculations\Parcel J\Stormwater Calculations_2008-10-06.xls 1 of 1 TIME OF CONCENTRATION CALCULATIONS EROSION CONTROL CALCULATIONS t New Towne Gardens, Union County, North Carolina N .y T C l6 O C l'+ Q t`6 C O y C U 7 O +• U 0 0 a m > E m~ n 0 0 N O d d d O l6 moo t5 R ` af d m 0 co N # ?+ E?aaa z d a) v o Q C w w _> c d = Q O L N E 0 C d ?O a` C c D 0 o m N 7 i O N ° N N N II C 11 i ? ° ? ? v v C E v co F v F C O C O r C C 0 U C O C d U C O o U o U O O m d E E N r F O co H i m c? ci o cp M tM o 0 m 0 o 0 0 o 0 0 0 0 0 0 0 0 0 lh ? M o (7 ? 0 0 c m v 5 0 o D 0 o ? m L U ; z z d (n O N L U d N C N L N ;O N tp ? N N ? W CO L y O L U U 0 U O N D J LL J L > L j 0 D N D I- 2 LL 4 C LL LL LL C W a O O C U d U CV 5 W JI U Y HYDROCAD HYDROLOGY REPORT EROSION CONTROL CALCULATIONS New Towne Gardens, Union County, North Carolina 1 1 1 1 1 1 1 1 1 i 1 1 1 1 1S 2S 4S Pre-dev DA-1 Post-d(-.v DA-1 Post-dev ND DA-1 v Z8P 3P Pond 1 Outfall 1 5S 6S 8S Pre-dev DA-2 Post-d v DA-2 Post-dev ND DA-2 7P 9P Pond 2 Outfall 2 Subca Reach on [Link Southem Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/24/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 2 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre-dev DA-1 Runoff Area= 10.080 ac 0.00% Impervious Runoff Depth>0.53" Tc=25.2 min CN=71 Runoff=2.63 cfs 0.443 of Subcatchment 2S: Post-dev DA-1 Runoff Area=7.150 ac 0.00% Impervious Runoff Depth>2.14" Tc=5.0 min CN=96 Runoff=9.25 cfs 1.274 of Subcatchment 4S: Post-dev UND DA -1 Runoff Area=1.150 ac 0.00% Impervious Runoff Depth>0.65" Tc=5.0 min CN=74 Runoff=0.47 cfs 0.063 of Subcatchment 5S: Pre-dev DA-2 Runoff Area=27.280 ac 0.00% Impervious Runoff Depth>0.19" Tc=25.0 min CN=60 Runoff=1.57 cfs 0.441 of Subcatchment 6S: Post-dev DA-2 Runoff Area=24.400 ac 0.00% Impervious Runoff Depth>1.52" Tc=5.0 min CN=89 Runoff=24.36 cfs 3.098 of Subcatchment 8S: Post-dev UND DA-2 Runoff Area=5.930 ac 0.00% Impervious Runoff Depth>0.39" Tc=5.0 min CN=67 Runoff=1.27 cfs 0.193 of Pond 3P: Pond 1 Peak EIev=728.03' Storage=35,851 cf Inflow=9.25 cfs 1.274 of Outflow=1.40 cfs 0.569 of Pond 7P: Pond 2 Peak EIev=721.69' Storage=120,244 cf Inflow=24.36 cfs 3.098 of Outflow=0.35 cfs 0.338 of Pond 8P: Outfall 1 Inflow=1.51 cfs 0.632 of Primary=1.51 cfs 0.632 of Pond 9P: Outfall 2 Inflow=1.51 cfs 0.530 of Primary=1.51 cfs 0.530 of Total Runoff Area = 75.990 ac Runoff Volume = 5.511 of Average Runoff Depth = 0.87" , 100.00% Pervious= 75.990 ac 0.00% Impervious = 0.000 ac ' Southem Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/24/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Paiae 3 Summary for Subcatchment 1S: Pre-dev DA-1 Runoff = 2.63 cfs @ 12.77 hrs, Volume= 0.443 af, Depth> 0.53" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 10.080 71 10.080 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 25.2 Direct Entry, From spreadsheet I Subcatchment 1S: Pre-dev DA-1 Hydrograph 2.63 cfs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr 2 Rainfall=2.58 Runoff Area=10.080 ac 4 Runoff Volume=0.443 of LL Runoff Depth>0.53" ' Tc=25.2 min CN=71 0 i r*W.--. i i'1 i i i i- i i i iT. i ..... i .. 1 i iTT^1'?*^T 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 151"6--17 18 19 20 21 22 23 24 Time (hours) ¦ Runoff Southem Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/24/2008 HydroCAM 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2S: Post-dev DA-1 [49] Hint: Tc<2dt may require smaller dt Runoff = 9.25 cfs @ 12.40 hrs, Volume= 1.274 af, Depth> 2.14" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 7.150 96 7.150 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, From spreadsheet Subcatchment 2S: Post-dev DA-1 Hydrograph 10 9.25 cfs 9 Charlotte 24-hr 8 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Runoff Area=7.150 ac Runoff Volume=1.274 of L 5 Runoff Depth>2.14" 4 Tc=5.0 min 3 CN=96 1 ¦ Runoff 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Southem Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/24/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 4S: Post-dev UND DA-1 [49] Hint: Tc<2dt may require smaller dt Runoff = 0.47 cfs @ 12.45 hrs, Volume= 0.063 af, Depth> 0.65" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 1.150 74 1.150 Pervious Area Tc Length Slope Velocity Capacity Description _(min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Post-dev UND DA-1 Hydrograph 0.5 _ _ _ _ - _ ¦ Runoff 0.47 cfs 0.45- 1 Charlotte 24-hr 0.4 1-yr 24.00 hrs 1 yr 24 hr Rainfall=2.58" 0.35 Runoff Area=1.150 ac 03 Runoff Volume=0.063 of 0 0.25 Runoff Depth>0.65" 0.2 Tc=5.0 min 0.15 CN=74 0.1- 0.05- 0-- 7 1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Southem Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/24/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 5S: Pre-dev DA-2 Runoff = 1.57 cfs @ 13.04 hrs, Volume= 0.441 af, Depth> 0.19" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 27.280 60 27.280 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 25.0 Direct Entry, From Spreadsheet Subcatchment 5S: Pre-dev DA-2 Hydrograph 1.57 cfs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Runoff Area=27.280 ac ' Runoff Volume=0.441 of Runoff Depth>0.19" Tc=25.0 min CN=60 ¦ Runoff 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Southem Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr- 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/24/2008 HydroCAM 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Paoe 7 Summary for Subcatchment 6S: Post-dev DA -2 [49] Hint: Tc<2dt may require smaller dt Runoff = 24.36 cfs @ 12.41 hrs, Volume= 3.098 af, Depth> 1.52" ' Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58 Area (ac) CN Description 24.400 89 24.400 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 6S: Post-dev DA-2 Hydrograph 26 _ _ _ ¦ Runoff 24.36 cfs ' 24 Charlotte 24-hr 22' 1 24.00 hrs 1 yr - 24 hr 20- Rainfall=2.58" 18Runoff Area=24.400 ac 16- 14- Runoff Volume=3.098 of U. 12 Runoff Depth>1.52" 10- Tc=5.0 min 6 CN=89 6- 2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Southem Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/24/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 8S: Post-dev UND DA-2 [49] Hint: Tc<2dt may require smaller dt Runoff = 1.27 cfs @ 12.50 hrs, Volume= 0.193 af, Depth> 0.39" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 5.930 67 5.930 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: Post-dev UND DA-2 -- Hydrograph ¦ Runoff 1.27 cfs Charlotte 24-hr ' 1-yr 24.00 hrs 1 yr - 24 hr 1 Rainfall=2.58" ' Runoff Area=5.930 ac Runoff Volume=0.193 of Runoff Depth>0.39" Tc=5.0 min CN=67 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Southern Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/24/2008 HydroCAM 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 9 Summary for Pond 3P: Pond 1 Inflow Area = 7.150 ac, 0.00% Impervious, Inflow Depth > 2.14" for 1 yr - 24 hr event Inflow = 9.25 cfs @ 12.40 hrs, Volume= 1.274 of Outflow = 1.40 cfs @ 13.57 hrs, Volume= 0.569 af, Atten= 85%, Lag= 70.4 min Primary = 1.40 cfs @ 13.57 hrs, Volume= 0.569 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 728.03'@ 13.57 hrs Surf.Area= 19,993 sf Storage= 35,851 cf Plug-Flow detention time= 303.6 min calculated for 0.569 of (45% of inflow) Center-of-Mass det. time= 180.0 min ( 971.7 - 791.7 ) Volume Invert Avail.Storage Storage Description #1 726.00' 130,637 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 726.00 14,257 0 0 727.00 18,100 16,179 16,179 728.00 19,930 19,015 35,194 729.00 21,832 20,881 56,075 730.00 23,807 22,820 78,894 731.00 25,853 24,830 103,724 732.00 27,972 26,913 130,637 Device Routing Invert Outlet Devices #1 Primary 726.00' 36.0" x 51.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 725.00' S=0.0196'/' Cc= 0.900 n=0.013 #2 Device 1 726.00' 2.3" Vert. Orifice/Grate C= 0.600 #3 Device 1 727.75' 2.50' W x 0.75'H Vert. Orifice/Grate C=0.600 #4 Device 1 729.00' 2.50' W x 0.67' H Vert. Orifice/Grate C=0.600 #5 Device 1 729.50' 3.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 Primary OutFlow Max=1.40 cfs @ 13.57 hrs HW=728.03' (Free Discharge) L1=Culvert (Passes 1.40 cfs of 24.75 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.19 cfs @ 6.70 fps) 3=Orifice/Grate (Orifice Controls 1.21 cfs @ 1.71 fps) -Orifice/Grate (Controls 0.00 cfs) -5--Orifice/Grate (Controls 0.00 cfs) Southern Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/24/2008 HydroCAM 8 50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 10 Pond 3P: Pond 1 Hydrograph ¦ Inflow ¦ Primary v 3 0 LL 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 11 2s L4 Time (hours) Southern Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/24/2008 HydroCAM 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 11 Summary for Pond 7P: Pond 2 Inflow Area 24.400 ac, 0.00% Impervious, Inflow Depth > 1.52" for 1 yr - 24 hr event Inflow 24.36 cfs @ 12.41 hrs, Volume= 3.098 of Outflow = 0.35 cfs @ 24.00 hrs, Volume= 0.338 af, Atten= 99%, Lag= 695.4 min ' Primary = 0.35 cfs @ 24.00 hrs, Volume= 0.338 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 721.69'@ 24.00 hrs Surf.Area= 49,464 sf Storage= 120,244 cf Plug-Flow detention time= 434.7 min calculated for 0.338 of (11 % of inflow) Center-of-Mass det. time= 254.0 min ( 1,085.2 - 831.2 ) Volume Invert Avail.Storage Storage Description #1 719.00' 301,703 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 719.00 38,235 0 0 720.00 44,277 41,256 41,256 721.00 47,329 45,803 87,059 722.00 50,442 48,886 135,945 ' 723.00 53,616 52,029 187,974 724.00 56,850 55,233 243,207 725.00 60,143 58,497 301,703 Device Routing Invert Outlet Devices #1 Primary 719.00' 36.0" x 147.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 716.00' S= 0.02047' Cc= 0.900 n= 0.013 #2 Device 1 719.00' 2.9" Vert. Orifice/Grate C= 0.600 #3 Device 1 723.60' 4.00' x 3.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 #4 Device 1 722.00' 1.50' W x 0.50'H Vert. Orifice/Grate C=0.600 Primary OutFlow Max=0.35 cfs @ 24.00 hrs HW=721.69' (Free Discharge) L1=Culvert (Passes 0.35 cfs of 37.24 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.35 cfs @ 7.71 fps) ' 3=Orifice/Grate ( Controls 0.00 cfs) -Orifice/Grate ( Controls 0.00 cfs) Southern Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr- 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/24/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 12 Pond 7P: Pond 2 Hydrograph ¦ Inflow ¦ Primary v 3 0 LL 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) 1 1 1 1 1 1 Southern Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/24/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 13 Summary for Pond 8P: Outfall 1 [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 8.300 ac, 0.00% Impervious, Inflow Depth > 0.91" for 1 yr - 24 hr event Inflow = 1.51 cfs @ 13.52 hrs, Volume= 0.632 of Primary = 1.51 cfs @ 13.52 hrs, Volume= 0.632 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Pond 8P: Outfall 1 Hydrograph 1 0 LL ¦ Inflow ¦ Primary 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) u Southern Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/24/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 14 Summary for Pond 9P: Outfall 2 [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 30.330 ac, 0.00% Impervious, Inflow Depth > 0.21" for 1 yr - 24 hr event Inflow = 1.51 cfs @ 12.51 hrs, Volume= 0.530 of Primary = 1.51 cfs @ 12.51 hrs, Volume= 0.530 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Pond 9P: Outfall 2 Hydrograph v 0 U. 1 I 77 J ¦ Inflow ' ¦ Primary L 1-1 C 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours)