Loading...
HomeMy WebLinkAbout20160502 Ver 1_FW DG00349 - Bishop Road - Temporary Suspension of Work (Section 108-7)_20170906 Carpenter,Kristi From:Norton, April R Sent:Wednesday, September 06, 2017 8:30 AM To:Carpenter,Kristi Cc:Chapman, Amy Subject:FW: DG00349 - Bishop Road - Temporary Suspension of Work (Section 108-7) Attachments:DG00349 Temp Suspension 09052017.pdf Follow Up Flag:Follow up Flag Status:Flagged Thanks, April From: Kirkman, Christopher D Sent: Tuesday, September 05, 2017 10:31 PM To: 'gkirkpatrick@trianglegradingpaving.com' <gkirkpatrick@trianglegradingpaving.com> Cc: Joe Coleman <jcoleman@trianglegradingpaving.com>; Robinson, Stephen J <sjrobinson@ncdot.gov>; Byrd, Darrell T <tbyrd@ncdot.gov>; Harper, Aaron A <aaharper@ncdot.gov>; Nicole J Thomson <nthomson@sepiengineering.com>; Parker, Jerry A <jparker@ncdot.gov>; Norton, April R <april.norton@ncdenr.gov>; Bailey, David E SAW (David.E.Bailey2@usace.army.mil) <David.E.Bailey2@usace.army.mil>; Mills, James M <mmills@ncdot.gov>; Eason, Patty P <peason@ncdot.gov>; Cail, William G <gcail@ncdot.gov>; Powers, Tim <tpowers@ncdot.gov>; Williams, John <John.Williams@mbakerintl.com>; derrick.hill@mbakerintl.com; Joe Coleman <jcoleman@trianglegradingpaving.com> Subject: RE: DG00349 - Bishop Road - Temporary Suspension of Work (Section 108-7) *** Revised letter removing incorrect TIP information. Have a wonderful day tomorrow, Chris Kirkman,PE,CPM Resident Engineer NCDOT Division 7 Graham Construction 336 570 6830 office 336 451 6836 mobile cdkirkman@ncdot.gov 115 E Crescent Square Dr. Graham, NC 27253 1 Office Location (Google Maps Hyperlink) https://goo.gl/maps/1jcGQTysNWQ2 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. _____________________________________________________________ From: Kirkman, Christopher D Sent: Tuesday, September 05, 2017 10:26 PM To: 'gkirkpatrick@trianglegradingpaving.com' <gkirkpatrick@trianglegradingpaving.com> Cc: 'Joe Coleman' <jcoleman@trianglegradingpaving.com>; Robinson, Stephen J <sjrobinson@ncdot.gov>; Byrd, Darrell T <tbyrd@ncdot.gov>; Harper, Aaron A <aaharper@ncdot.gov>; Nicole J Thomson <nthomson@sepiengineering.com>; Parker, Jerry A <jparker@ncdot.gov>; Norton, April R <april.norton@ncdenr.gov>; Bailey, David E SAW (David.E.Bailey2@usace.army.mil) <David.E.Bailey2@usace.army.mil>; Mills, James M <mmills@ncdot.gov>; Eason, Patty P (peason@ncdot.gov) <peason@ncdot.gov>; Cail, William G <gcail@ncdot.gov>; Powers, Tim <tpowers@ncdot.gov>; Williams, John <John.Williams@mbakerintl.com> Subject: DG00349 - Bishop Road - Temporary Suspension of Work (Section 108-7) DG00349 – Bishop Road Bridge #40 Replacement in Guilford County Gray, Good evening. A letter of Temporary Suspension of all Work is attached as discussed with Patty Eason, DCE, this afternoon. Also, attached is picture documentation (9/5/17) provided by our permit consultant. Thanks in advance for all your efforts & collaboration for timely corrective action to achieve permit compliance. Safe travels, 2 Chris Kirkman,PE,CPM Resident Engineer NCDOT Division 7 Graham Construction 336 570 6830 office 336 451 6836 mobile cdkirkman@ncdot.gov 115 E Crescent Square Dr. Graham, NC 27253 Office Location (Google Maps Hyperlink) https://goo.gl/maps/1jcGQTysNWQ2 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. _____________________________________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER GOVERNOR September 5, 2017 Contract No.: DG00349 WBS No.: 17BP.7.R.81 JAMES H. TROGDON, III SECRETARY County: Guilford Description: Replace Bridge#40 on SR 1116 (BISHOP ROAD) Over Hickory Creek Subject: Temporary Suspension of Work (Section 108-'� Gray Kirkpatrick Triangle Grading & Paving P.O. Box 2570 Burlington, NC 27216-2570 Dear Mr. Kirkpatrick: In accordance with Section 108-7 of the 2012 Standard Specifications this letter will provide a written order for temporary suspension of all work throughout the project today (9/05/17 @ 545PM). The temporary suspension of work is necessary in order to focus all efforts on erosion control to insure timely corrective action to achieve environmental compliance. NOTE: Division Construction Engineer, Patty Eason, called you today to notify of the upcoming written temporary suspension of work due to project in noncompliance with erosion control. Any operations without written authorization by the Department will be considered "Unauthorized Work" as described in Section 105-12 of the 2012 Standard Specifications. Page 2 Mailing Address: NC DEPARTMENT OF TRANSPORTATION DNISION OF HIGHWAYS — DIVISION 7 P. O. BOX 14996 GREENSBORO, NC 27415-4996 Telephone: (366) 487-0000 Fax: (336) 334-3637 Customer Service: 1-877-368-4968 Website.• www.ncdot.gov Location: NC DEPARTMENT OF TRANSPORTATION DNISION OF HIGHWAYS — DNISION 7 1584 YANCEYVILLE STREET GREENSBORO, NC 27405 Mr. Gray Kirkpatrick September 5, 2017 The Department's priorities are Safety, Environmental Stewardship, Quality, Cost Effectiveness, Timely Completion, and Customer Service throughout the construction process. If any questions arise, please advise. Sincerely, . �� Chris Kirkman, CPM, P.E. RESIDENT ENGINEER CDK/ cdk cc: J.M. Mills, PE Patty Eason, PE Aaron Harper, NCDOT Roadside Environxnental Jerry Parker, NCDOT Div. 7 DEO Nikki Thompson, NCDOT Div DEO Assistant Derrick Hill (Project Inspector) File