Loading...
HomeMy WebLinkAbout20171018 Ver 1_Email_20170905 Carpenter,Kristi From:Norton, April R Sent:Tuesday, September 05, 2017 3:26 PM To:Carpenter,Kristi Subject:FW: Request for Additional Information: NCDOT B-5239, Alamance County; SAW-2017-01883 Follow Up Flag:Follow up Flag Status:Flagged Thanks, April From: Bailey, David E CIV USARMY CESAW (US) \[mailto:David.E.Bailey2@usace.army.mil\] Sent: Tuesday, September 05, 2017 3:17 PM To: Barrett, William A <wabarrett@ncdot.gov> Cc: Norton, April R <april.norton@ncdenr.gov> Subject: Request for Additional Information: NCDOT B-5239, Alamance County; SAW- 2017-01883 Bill, Thanks for discussing the hand clearing/temporary impacts issues with me this morning. I had a chance to review the entirety of the PCN and attachments this afternoon and need clarification before proceeding with verifying the use of Nationwide Permits 13/23/33. Please submit the requested information below (via e-mail is fine) within 30 days of receipt of this Notification, otherwise we may deny verification of the use of these Nationwide Permits or consider your application withdrawn and close the file: 1) I cannot find any records of a delineation report or JD request for this project in our files, and none was attached to the PCN. Please submit either of these items, including the delineation map and wetland/upland data forms for review; 2) Per NWP 33 Regional Condition 4.1.2, include a restoration plan that thoroughly describes how all temporary fills will be removed, describes how pre-project conditions will be restored, and includes a timetable for all restoration activities. Please also include a wetland planting plan to re-establish characteristic wetland vegetation in the temporary wetland impact areas; 3) Per our discussion this morning, please submit a revised Impact Summary Sheet that clearly lists the acreage of temporary wetland impacts (for sediment and erosion control activities) proposed to occur within the wetland hand clearing areas; 4) In an effort to reduce redundancy of permit conditions, would NCDOT be amenable to requesting authorization for the proposed project under NWP 14? There would be no need to resubmit the PCN, instead simply write in the request in your response email. If this is problematic for NCDOT or NCDWR (April?), please let me know. 1 Please let me know if you have any questions. Sincerely, Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. 2