Loading...
HomeMy WebLinkAbout20171110 Ver 1_Impact Information_20170906 (2)T 105 EOI EOI EOI EOI EOI EOI EOI EXISTING R/W 8" HDPE EOI 8" PVC EXISTING R/W WD WW WD WW WD WWWD WW BEAVERDAM SWAMP BEAVERDAM SWAMP 60.00’BL-500 SPIKE IN 18" TREE ELEV = 85.65’ O/S 44 LT -BL- STA 18+87 TBM-2 B5657-3 ALICE K. GUICE DB 2480 PG 516 JANICE NEWKIRK SPARKS FRANK JULIUS & DB 12-E PG 423 SR 1001 20.0’ PAVED ROADWAY JUSTICE BRANCH ROAD WETLANDS WETLANDS WETLANDS WETLANDS EXISTING R/W EXISTING R/W EXISTING R/W 55.00’ (RT) EX. R/W (RT) +70 50’ +60 EX R/W +70 10 11 TB 2GI TB 2GI 15"15"8/30/2017Q:\RA\9537\CADD\B-5657\Hydraulics\PERMITS_Environmental\Drawings\B-5657_hyd_prm_buf_04_enlarged_R.dgnjdavenportHYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.5/14/99SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED B-5657 PSH_04 NAD 83/ NA 2011 GRAPHICAL SCALE 0’40’40’ BUF-4 -L-2529BUFFER IMPACTS BRIDGE #15 SITE 1 BUFFER IMPACTS BRIDGE #15 SITE 1 BUFFER IMPACTS BRIDGE #15 SITE 1 SHEET 4 OF 7 BUFFER DRAWING BUFFER IMPACTS BRIDGE #15 SITE 1BUFFER IMPACTS BRIDGE #15 SITE 1-L- STA. 24+00BUF SHEET 3ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION5/14/99SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 8/30/2017Q:\RA\9537\CADD\B-5657\Hydraulics\PERMITS_Environmental\Drawings\B-5657_hyd_prm_buf_05_profile.dgnjdavenportHORIZONTAL VERTICAL B-5657 50 1002550 10 20105 BUF-5 NWS EL = 82.0’NWS EL = 82.0’ PROP 100YR = 85.8’ NWS EL = 82.0’ PROP 25YR = 84.6’PROP 25YR = 84.6’ PROP 100YR = 85.8’ NWS EL = 82.0’ DITCH LEGEND DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED FOR -L- PLAN SEE SHEET 4 21 22 23 24 26 27 28 29 30 110 110 100 100 25 90 80 70 60 50 40 30 20 10 10 20 30 40 50 60 70 80 90 201918 31 32 LEFT DITCH RIGHT DITCH SHEET 5 OF 7 BUFFER DRAWING 2’-6" CAP 2’-6" CAP 70’ CSU -L- SR 1001 (JUSTICE BRANCH ROAD) SPIKE IN 18" TREE BL STA 15+33 36’ LT N : 899333.74 E : 2391058.81 TBM-1 ELEVATION = 87.00’ SPIKE IN 18" TREE BL STA 18+87 44’ LT N : 899609.05 E : 2391288.61 TBM-2 ELEVATION = 85.65’ ELEV = 84.81’ -L- STA 20+32.00 BEGIN GRADE EXISTING GROUND PROPOSED GRADE23+61.18HIGH POINTELEV = 85.12’ -L- STA 28+95.00 END GRADE PI = 22+75.00 EL = 89.54’ (+)1.9462% (-)0.4631% K = 116 PI = 26+60.00 EL = 87.76’ (-)1.3750% VC = 110’ K = 121 PI = 28+35.00 EL = 85.35’ (-)0.3833% VC = 120’ K = 121 DS = 55 mph DS = 56 mphDS = 56 mph STA 22+18+/-BEGIN BRIDGE #14 (FILL FACE)STA 22+92+/-END BRIDGE #14 (FILL FACE)STA 25+63+/-BEGIN BRIDGE #15 (FILL FACE)STA 26+35+/-END BRIDGE #15 (FILL FACE)VC = 280 2’-6" CAP 72’ CSU 2’-6" CAP DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 2000 = 25 = 84.6 = 3280 = 100 = 85.8 = 2340 = 50- = 84.8 = 11-15-2016 = 82.0 ROAD CROSSING BRIDGEPARALLEL IMPACTZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)1 BRIDGE -L- 21+55 RT TO 22+28 LT X 2256 13021 BRIDGE -L- 22+73 RT TO 23+48 LT X 2423 11511 BRIDGE -L- 25+17 LT TO 25+75 RT X 1567 9961 BRIDGE -L- 26+17 RT TO 26+93 LT X 1713 1047TOTAL:7959 4496 0 0.0 0.0 0.0 0.0 0.0Rev. SEP 2016IMPACTRIPARIAN BUFFER IMPACTS SUMMARYTYPESITE NO.STRUCTURE SIZE / TYPE STATION (FROM/TO)ALLOWABLE MITIGABLEBUFFER REPLACEMENT SHEET 6 OF 7PROJECT: 45615.3.1B-5657 8/30/2017N.C. DEPT. OF TRANSPORTATIONDIVISION OF HIGHWAYS HALIFAX COUNTYRev. May 2006 ZONE 1 (ft2)ZONE 2 (ft2)1 -L- 21+55 RT TO 22+28 LT BRIDGE CROSSING 1913 11571 -L- 22+73 RT TO 23+48 LT BRIDGE CROSSING 2241 10651 -L- 25+17 LT TO 25+75 RT BRIDGE CROSSING 1567 9931 -L- 26+17 RT TO 26+93 LT BRIDGE CROSSING 1713 1047TOTAL:7434 4262WETLANDS IN BUFFER IMPACTS SUMMARY SHEET 7 OF 7PROJECT: 45615.3.1B-5657 8/30/2017N.C. DEPT. OF TRANSPORTATIONDIVISION OF HIGHWAYS HALIFAX COUNTYWETLANDS IN BUFFERSSITE NO. STATION (FROM/TO)Rev. Jan 2009