HomeMy WebLinkAbout20171103 Ver 1_PCN Form Submission_20170905Action History (UTC-05:00) Eastern Time (US & Canada)
�brrrit by Anonymous User 9/5/2017 1:26:40 PM (Start Event)
Accept by Carpenter,Kristi 9/5/2017 2:53:35 PM (DOT Initial Review)
• The task was assigned to Carpenter,Kristi . The due date is: September 8, 2017 5:00 PM
9/5/2017 1:27 PM
�� �
6fvlslaa of Water Resources
Pre-Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
June 28, 2017 Ver 1.8
*
Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red.
Below is a link to the DRAFT online help file. http://edocs.deq.nc.gov/WaterResources/0/doc/549884/Page1.aspx
A. Processing Information
County (or Counties) where the project is located:*
Wilson
Is this a NCDOT Project?*
C� Yes �' No
(NCDOT only) T.I.P. or state project number:
WBS #
4B.209811
(for f�1CDOT use only)
� 1a. Type(s) of approval sought from the Corps:*
rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?*
fJ Nationwide Permit (NWP)
r Regional General Permit (RGP)
Nationwide Permit (NWP) Number:
NWP Number Other:
List all MN nurrbers you are applying for not on the drop dow n list.
03 - Maintenance
1c. Type(s) of approval sought from the DWR:*
check all that apply
r 401 Water Quality Certification - Regular
� Non-404 Jurisdictional General Permit
r 401 Water Quality Certification - Express
�7 Riparian Buffer Authorization
1d. Is this notification solelyfor the record because written approval is not required?
For the record only for DWR 401 Certification:
I For the record only for Corps Permit:
1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
*
l" Yes C•' No
C•' Yes C' No
If so, attach the acceptance letter from rritigation bank or in-lieu fee program
C' Yes C•' No
1f. Is the project located in any of NC's twenty coastal counties?*
C' Yes �' No
B. Applicant Information
1a. Who is the Primary Contact?*
Chad Coggins
1b. Primary Contact Email:*
tccoggins@ncdot.gov
1c. PrimaryContact Phone:*
(xxx)xxx-xxxx
(252)717-8699
1d. Who is applying for the permit?
r Owner r% Applicant (other than owner) r AgenUConsultant
(Check all that apply)
2. Owner I nformation
2a. Name(s) on recorded deed:
NCDOT
2b. Deed book and page no.:
2c. Responsible party:
(for Corporations)
2d.Address
Street Address
Address Line 2
�'
R�stal / Zip Code
2e. Telephone Number:
I(xxx)xxx-xxxx
2f. Fax Number:
(xxx)xxx-xxxx
2g. Email Address:*
I tccoggins@ncdot.gov
3. Applicant Information (if different from owner)
3a. Applicant is:
G Agent
C' Other
If other please specify.
3b. Name:
Chad Coggins
3c. Business Name:
State / Rovince / F�gion
Country
(if applicable)
NCDOT Div.4
3d.Address
Street Address
Address Line 2
�'
Fbstal / Zip Code
3e. Telephone Number:
(xxx)xxx-xxxx
3f. Fax Number:
(xxx)x�c-�ocx
3g. Email Address:*
tccoggins@ncdot.gov
State / Rovince / F�gion
Country
C. Project Information and Prior Project History
1. Project Information
1a. Name of project:*
Merck Road Culvert Clearing
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality/town:*
Wilson
1d. Driving directions*
If it is a new project and can not easily be found in a G� rrapping system Rease provide directions.
US 264 alt just east of 195 south on merck road
2. Project Identification
2a. Property Identification Number:
(tax RNor parcel ID)
2b. Propertysize:
(in acres)
2c. Project Address
Street Address
Address Line 2
��
Fbstal / Zip Code
State / R-ovince / F�gion
Country
2d. Site coordinates in decimal degrees
I Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as
appropriate, based on howthe location was determined. (For e�mple, most mobile phones with GPS provide locational precision in decimal degrees to
map coordinates to 5 or 6 digits after the decimal place.)
Latitude:* Longitude:*
i 35.76049 -77.99362
ex:34208504 -77.796371
3. SurFace Waters
3a. Name of the nearest body of water to proposed project:*
Bloomery Swamp
3b. Water Resources Classification of nearest receiving water:*
WS-IV NSW
Surface Water Lookup
3c. What river basin(s) is your project located in?*
Neuse
RiverBasin Lookup
4. Project Description
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Forestry and Agriculture are the predominant land uses in the vicinity of this project
4b. Attach an 8 1/2 X 17 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for
DWR)
C7ick the upload button or drag and drop files here to attach docurrent
2017-09-05_13-03-31.pdf 1022.13K6
Fle type rrust be pdf
4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.
(for DWR)
aick the upload button or drag and drop files here to attach docurrent
Fle type rrust be pdF
4d. List the total estimated acreage of all existing wetlands on the property:
0
4e. List the total estimated linear feet of all existing streams on the property:
(interrrdtent and perennial)
100
4f. Explain the purpose of the proposed project:
Alleviate flooding to immediately upstream structures by removing vegetation and debris within a NCDOT
permanent drainage easement associated with U-3345 wi�ich was built in the mid-90's.
4g. Describe the overall project in detail, including the type of equipment to be used:
Remove veg. by chain saws within easement. Some heavy equipment will be used from roadway in order to
remove cut trees from easement.
4h. Please upload project drawins for the proposed project.
qick the upload button or drag and drop files here to attach docurrent
Fle lype rrust be pdF
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?*
� C' Yes �' No �' Unknown
Comments:
Sb. If the Corps made a jurisdictional determination, what type of determination was made? *
C' Preliminary C' Approved C•' Unknown
Corps AID Number:
6carrple: SAV�2017-99999
5c. If 5a is yes, who delineated the jurisdictional areas?
i Name (if known):
Agency/Consultant Company:
Othe r:
5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5d1. Jurisdictional determination upload
C7ick the upload button or drag and drop files here to attach docurrent
Fle type rrust be FDF
6. Project History
6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?*
C' Yes �' No �' Unknown
7. Future Project Plans
7a. Is this a phased project?*
C' Yes C•' No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the
proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the
Army authorization but don't require pre-construction notification.
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
r Wetlands r Streams-tributaries �J Buffers
r Open Waters r Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites
impacted.
"" All Perennial or Intermittent streams must be verified by DWR or delegated local government.
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list
all open water impacts below.
5. Pond or Lake Construction
If pond or lake construction is proposed, then complete the chart below.
6. Buffer Impacts (for DWR)
If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below.
6a. Project is in which protect basin(s)?*
Check all that apply.
fJ Neuse r Tar-Pamlico
r Catawba r Randleman
r Goose Creek r Jordan Lake
r Other
6b. Impact Type
6c. Per or 6d. Stream name
Te mp
Site 1 Alowable P BloomerySwamp
Location and Exerrpt, Allowable, allowable w/ rritigation F�rrrenent (� or
Terrporary (�
6h. Total buffer impacts:
Temporary impacts
i Permanent impacts:
Total buffer impacts
6i. Comments:
Zone 1
0.00
Zone 1
2,265.00
Zone 1
2,265.00
Zone 2
0.00
Zone 2
639.00
Zone 2
639.00
Supporting Documentation - i.e. Impact Maps, Plan Sheet, etc.
Qick the upload button or drag and drop files here to attach docurrent
U3345 PERMIT.pdf
i Buffer Aerial.pdf
Fle rrust be Ft7F
i E. Impact Justification and Mitigation
6e. Buffer 6f. Zone 1 6g. Zone 2
mitigation impact impact
required?
No 2,265 639
(squarefeet) (squarefeet)
1.01 MB
1.38M6
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:*
just removing veg
1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques:*
just use of chain saws within buffer area.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
C' Yes C•' No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
within buffer threshold
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1a. Does this project require a Stormwater Management Plan?
C' Yes C•' No
1e. If this project DOES NOT require a Stormwater Management Plan, explain why:
just removing veg.
2. Diffuse Flow Plan
2a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection
Rules?
C' Yes C•' No
If no, explain why:
just removing veg.
G. Supplementary Information
� 1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
G Yes C' No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the
� requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?*
C' Yes C•' No
Comments:*
MCDC available upon request
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or
DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?*
C' Yes C•' No
2b. Is this an after-the-fact permit application?*
C' Yes r No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWR Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact
nearby downstream water quality?*
C' Yes C•' No
3b. If you answered "no," provide a short narrative description.
just removing veg.
4. Sewage Disposal (DWR Requirement)
4a. Describe, in detail, the treatment methods and dispositions (non-discharge or discharge) of wastewater generated from the
proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant.
na
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
C' Yes C•' No
Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?*
C' Yes C•' No
Sc. If yes, indicate the USFWS Field Office you have contacted.
5d. Is this a DOT project located within Division's 1-8?*
�' Yes
C' No
5i. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?*
NCNHP GIS data
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
C' Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
GIS data
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural
preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? *
C' Yes C•' No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources? *
just removing veg.
7c. Historic or Prehistoric Information Upload
Qick the upload button or drag and drop files here to attach docurrent
Fle rrust be FDF
8. Flood Zone Designation (Corps Requirement)
Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
C� Yes C' No
8b. If yes, explain how project meets FEMA requirements:
i just removing veg. not adding any fill or structure to this area
8c. What source(s) did you use to make the floodplain determination?*
FRIS
Miscellaneous attachments not previously requested.
Qick the upload button or drag and drop files here to attach docurrent
Fle rrust be F�F
Signature
*
� By checking the box and signing below, I certify that:
■ I have given true, accurate, and complete information on this form;
■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions AcY');
■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions AcY');
■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
■ I intend to electronically sign and submit the PCN form.
Full Name:*
Chad Coggins
Signature
�i�rr���Q��c��
Date
9/5/2017
Initial Review
� Is this project a public transportation project?
�' Yes C' No
Only change this if the project has been reassigned.
Has this project met the requirements for acceptance in to the review process?*
G Yes
C' No
BIMS # Assigned*
20171103
Version#*
1
Reviewing Office*
Central Office - (919) 707-9000
Select Project Reviewer*
I Rob Ridings:eads\rgridings