Loading...
HomeMy WebLinkAbout20020468 Ver 1_Staff Comments_20081121Re: 02-0468 Brier Creek Country Club Phase 15 - Land Bay NOV Subject: Re: 02-0468 Brier Creek Country Club Phase 15 - Land Bay NOV From: Lauren Cobb <lauren.cobb@ncmail.net> Date: Fri, 21 Nov 2008 12:35:01 -0500 To: Annette Lucas <Annette. Lucas@NCMail. net> awesome comments. i will get the letter out Monday. Thanks so much, Lauren Annette Lucas wrote: Hey Lauren! Here's my two cents. . . Annette Lauren C. Witherspoon Environmental Senior Specialist NC Division of Water Quality Surface Water Protection 1 of 1 11/21/2008 12:46 PM 02-0468 Brier Creek Country Club Phase 15 - Land Bay NOV AML Comments November 21, 2008 Device behind lot 714: The Duraslot pipe appeared to be working fairly well. Please check the elevations to determine if it is level and make any necessary adjustments to make the device level. In addition, please repair the small area of erosion on the north side of the pipe. Device behind lot 726: The Duraslot pipe was installed in a different location than what was indicated on the plans; please provide updated plan sheets. Some adjustments need to be made to this device in order for it to function properly. It appears that little if any stormwater is reaching this device because vegetation has grown over most of the slots in the pipe. In addition, the Duraslot pipe was set in a low point between two grades, which will make it difficult if not impossible for it to discharge stormwater. Please analyze the flow splitter device to see if it is designed and maintained properly to send the one inch per hour storm to the Duraslot pipe. Please also regrade the area downslope of the Duraslot pipe (and revegetate) to ensure that diffuse flow can occur. Device behind lots 737 and 738: The DWQ cannot accept an offset payment in lieu of providing an appropriate nitrogen removal device because this approach does not comply with the Neuse Buffer Rule's Table of Uses, 15A NCAC 213 .0233. Per this table, the new drainage ditch you are proposing to create through the buffer must be equipped with a stormwater management facility to control nitrogen and attenuate flow prior to the conveyance discharging through the riparian buffer. If you want to create a new drainage ditch through the buffer without providing a stormwater management facility, then this will require a major variance from the EMC. Before DWQ staff would recommend approval of a major variance, it would be necessary for us to see a good faith effort to provide stormwater management at this location.