Loading...
HomeMy WebLinkAbout20070678 Ver 1_Certification of Completion_2008112010/24/2008 14:40 2524413578 BGR PAGE 01/01 Certification of Completion DWQ Project No.: County; DLlf e- no NOV 2 0 2008 pENR.-NJAiFRFQU TL?lY Vvig,LANDSANDSTOPNIlVA,•. BRJ"SICK; Applicant: (? I 2 ou i o Project Name: _ I`',rher I Shci?, Date of Issuance of Wetland permit: 2- 2 ?- 0 8 Certil;icate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This foam may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature; _ Date, .Agent's Certification I,9-`^6-,-^ ° , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials, Signature: -A41 Date: i 1 6 If this project was designed by a Certified Professional I, . as a duly registered Professional (ix., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date