HomeMy WebLinkAbout19960933 Ver 1_Emails_20081107Re: mylan pharm
Subject: Re: mylan pharm
From: Laurie Dennison <laurie.j.dennison@ncmail.net>
Date: Fri, 07 Nov 2008 08:24:50 -0500
To: Sue Homewood <Sue.Homewood@ncmail.net>
CC: Annette Lucas <Annette.Lucas@ncmai].net>
Looking at the two projects in Laserfiche, I did the following - I took out the SW plan recvd info for
DWQ 04-1189 & made the entry for 96-0933 for both the July & Sept info recvd. That is the # I wrote on
the docs as shown in Laserfiche. There is nothing in Laserfiche for DWQ 04-1189 - so it was my bad for
posting the 2008 recvd info there. I do believe what is reflected in BIMS is now correct.
Annette, correct me if I'm wrong but I do not think SMP's have stat dates.
Sue - Annette won't be in today - & I'll be off from this afternoon at noon - returning Weds 11/12.
Laurie
Sue Homewood wrote:
I'm not sure how to address this project in BIMS.
there are 2 permits issued 96-0933 and 04-1189 both listed as issued. A request to modify the SMP came
in and you entered it as an event in 04-1189. I reviewed it and sent a hold letter but I put that
under 96-0933 (don't ask me why, i can't remember). I never entered anything in BIMS. Their response
came in but I don't see that logged in BIMS anywhere?
Laurie, can you help me figure out what to do. Also, do SMP reviews have stat dates? Since they don't
pay a fee and its not a true "app" how do we deal with this?
Thanks for your help. Annette, I'm sorry again that I didn't address how to handle this in BIMS sooner
so we didn't get confused on who was doing the review.
Sue Homewood
NC DENR Winston-Salem Regional Office
Division of Water Quality 585 Waughtown Street
Winston-Salem, NC 27107
Voice: (336) 771-5000
FAX: (336) 771-4630
1 of 1 11/20/2008 9:30 AM