Loading...
HomeMy WebLinkAbout20050131 Ver 1_Certification of Completion_20081107Certificate of Completion DWQ Project No.: ©/Z County: 6k"Kl Applicant: Project Name: /PC) k1),,f>V 2XAA ? 91 0 : A/P,R1n2d"Ai AGW 1224, 16 Date of Issuance of 401 Water Quality Certification: ? y', `a Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, CAL. T1?d 9j` N , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Dater If this project was designed by a Certified Professional yA ? l NOV 7 2008 DENR - YWATER OUALIIY YlET0,NDF AND STORW'.'ATER BRANCH I, , as a duly registered Professional (i.e. Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No.: Date: