Pre-Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
June 28, 2017 Ver 1.8
*
Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red.
Below is a link to the DRAFT online help file. http://edocs.deq.nc.gov/WaterResources/0/doc/549884/Page1.aspx
A. Processing Information
County (or Counties) where the project is located:*
Transylvania
Is this a NCDOT Project?*
�' Yes �' No
(NCDOT only) T.I.P. or state project number:
17BP.14.R.123
WBS #
176P.14.R.123
(for f�1CDOT use only)
� 1a. Type(s) of approval sought from the Corps:*
rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?*
fJ Nationwide Permit (NWP)
r Regional General Permit (RGP)
Nationwide Permit (NWP) Number:
NWP Number Other:
List all MN nurrbers you are applying for not on the drop dow n list.
03 - Maintenance
1c. Type(s) of approval sought from the DWR:*
check all that apply
� 401 Water Quality Certification - Regular
� Non-404 Jurisdictional General Permit
r 401 Water Quality Certification - Express
r Riparian Buffer Authorization
1d. Is this notification solelyfor the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
*
l" Yes C•' No
C' Yes C•' No
If so, attach the acceptance letter from rritigation bank or in-lieu fee program
C' Yes C•' No
1f. Is the project located in any of NC's twenty coastal counties?*
C' Yes �' No
B. Applicant Information
1a. Who is the Primary Contact?*
Dave McHenry
1b. Primary Contact Email:*
dgmchenry@ncdot.gov
1c. PrimaryContact Phone:*
(xxx)xxx-xxxx
(828)586-2141
1d. Who is applying for the permit?
r% Owner r Applicant (other than owner) r AgenUConsultant
(Check all that apply)
2. Owner I nformation
2a. Name(s) on recorded deed:
NCDOT, Division 14
2b. Deed book and page no.:
2c. Responsible party:
(for Corporations)
2d.Address
Street Address
253 Webster Road
Address Line 2
��
Sylva
Fbstal / Zip Code
28779
2e. Telephone Number:
(xxx)xxx-xxxx
(828)586-2141
2f. Fax Number:
(xxx)xxx-xxxx
2g. Email Address:*
dgmchenry@ncdot.gov
State / R-ovince / F�gion
NC
Country
USA
C. Project Information and Prior Project History
1. Project Information
1a. Name of project:*
Replace Transylvania Bridge No. 127
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality/town:*
Brevard
1d. Driving directions*
If it is a new project and can not easily be found in a C� rrnpping system Rease provide directions.
On SR 1541 east of Brevard in Transylvania County.
2. Project Identification
2a. Property Identification Number:
(tax RN or parcel ID)
2b. Propertysize:
(in acres)
2c. Project Address
Street Address
Address Line 2
aty
Fbstal / Zip Code
State / Rovince / F�gion
Country
2d. Site coordinates in decimal degrees
I Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as
appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to
map coordinates to 5 or 6 digits after the decimal place.)
Latitude:* Longitude:*
35.223983 -82.692193
ex:34.208504 -77.796371
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Williamson Creek
3b. Water Resources Classification of nearest receiving water:*
C Tr HQW
Surface Water Lookup
3c. What river basin(s) is your project located in?*
French Broad
RiverBasin Lookup
4. Project Description
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Site condition is a timber bridge on paved secondary road with surrounding land-use being forested with single-
family home lots.
4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for
DWR)
C7ick the upload button or drag and drop files here to attach docurrent
Tran 127 Topo.pdf 476.25KB
Fle type rrust be pdF
4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.
(for DWR)
aick the upload button or drag and drop files here to attach docurrent
Tran 127 soils.pdf 453.52KB
Fle type rrust be pdf
4d. List the total estimated acreage of all existing wetlands on the property:
0
4e. List the total estimated linear feet of all existing streams on the property:
(interrrdtent and perennial)
150
4f. Explain the purpose of the proposed project:
The project purpose is to replace an obsolete timber bridge with a new bottomless culvert.
4g. Describe the overall project in detail, including the type of equipment to be used:
The project will involve placing temporary dewatering diversions in Williamson Creek and phase constructing the
new culvert and demolishing the old bridge. Rip rap will be placed along the culvert footers and upstream and
downstream of the culvert to protect the stream banks and stream channel. Heavy equipment such as track hoes
will do most of the work.
4h. Please upload project drawins for the proposed project.
aick the upload button or drag and drop files here to attach docurrent
Tran 127 Partial Plans.pdf 5.46MB
Fle type rrust be pdF
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?*
C' Yes C•' No f Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
C' Preliminary C' Approved C•' Unknown
Corps AID Number:
6carrple: SAVw2017-99999
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Othe r:
5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5d1. Jurisdictional determination upload
Gick the upload button or drag and drop files here to attach docurrent
Fle type rrust be FDF
6. Project History
6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?*
C' Yes C' No �' Unknown
7. Future Project Plans
7a. Is this a phased project?*
f Yes C•' No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the
proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the
Army authorization but don't require pre-construction notification.
n/a
D. Proposed I m pacts I nventory
1. Impacts Summary
i 1a. Where are the impacts associated with your project? (check all that apply):
r Wetlands rJ Streams-tributaries r Buffers
r Open Waters r Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites
impacted.
3a. Site #- 3b.lmpact 3c. Type of 3d. Stream 3e. Stream 3f. 3g. Stream 3h. Impact
Reason for type impact name Type Jurisdiction width length
impact type
Row 1 1 P Other Williamson Perennial Both Average 125
N�p label (e.g. F�rrranent (P� or Cree k F�rennial (� or � 5 (linear feet)
I�ad CYossing 1) Terrporary (� interrrittent (IfVn (feet)
Row 2 1A T Dewatering Williamson Perennial Both Average 150
fv�p label (e.g. F�rrrenent (� or Cree k F2rennial (FE�) or � 5 (linear feet)
13�ad Q'ossing 1) Terrporary (� interrrittent (If� (feet)
�` All Perennial or Intermittent streams must be verified by DWR or delegated local government.
3i. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts:
125
3i. Total temporary stream impacts:
150
3i. Total stream and tributary impacts:
275
3j. Comments:
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list
all open water impacts below.
5. Pond or Lake Construction
If pond or lake construction is proposed, then complete the chart below.
6. Buffer Impacts (for DWR)
If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below.
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:*
The old bridge is being replaced with another bottomless structure to minimize aquatic life passage disruption. The
minimal amount of culvert needed is being used. The crossing is being replaced on location (versus new location)
I to minimize stream and riparian impacts.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:*
Excavation in flowing water will be avoided with temporary dikes/diversions. Effective erosion controls will be used
throughout construction.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
C' Yes
C•' No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
I The only permanent impacts are minimal amounts of rip rap to help protect the stream and stream banks.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1a. Does this project require a Stormwater Management Plan?
C� Yes
C' No
1b. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
NCDOT NCS000250
1c. What is the overall percent imperviousness of this project?
50
%
1d. Who will be responsible for the review of the Stormwater Management Plan?*
r Certified Local Government
fJ DWR 401 & Buffer Permitting Branch
2. Diffuse Flow Plan
r DEMLR Stormwater Review
r DWR Transportation Permitting Branch
2a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection
Rules?
C' Yes
C•' No
If no, explain why:
project area not in Catawba or Neuse Basins
5. DWR 401 Stormwater Review
5a. Is the Stormwater Management Plan (including BMP Supplemental Forms and Operation and Maintenance Agreements) attached?
C' Yes C•' No
I Stormwater Management Plan Upload
C7ick the upload button or drag and drop files here to attach docurrent
file type rrust be pdf
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
C� Yes l" No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the
requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?*
C' Yes �' No
Comments:*
MCC project
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or
DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? *
C' Yes �' No
2b. Is this an after-the-fact permit application?*
C' Yes C•' No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWR Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact
nearby downstream water quality?*
C' Yes �' No
3b. If you answered "no," provide a short narrative description.
This project is maintenance of an existing stream crossing without an increase in capacity.
4. Sewage Disposal (DWR Requirement)
4a. Describe, in detail, the treatment methods and dispositions (non-discharge or discharge) of wastewater generated from the
proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant.
Port-o-jons will be used during construction - no permanent wastewater generated
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
C' Yes C•' No
Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?*
C' Yes C•' No
5c. If yes, indicate the USFWS Field Office you have contacted.
5d. Is this a DOT project located within Division's 1-8?*
C' Yes
C� No
5e. Will you cut anytrees in order to conduct the work in waters of the U.S.?*
r Yes C' No
5f. Does this project involve bridge maintenance or removal?*
�' Yes �' No
5f(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? Representative photos of signs of bat
use can be found in the NLEB SLOPES, Appendix F, pages 3-7.
r Yes C' No
Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf
If you answered "Yes" to 5f(1), did you discover any signs of bat use?*
C' Yes C' No C' Unknown
If yes, please show the location of the bridge on the permit drawings/project plans.
aick the upload button or drag and drop files here to attach docurrent
Fle rrust be FDF
Sg. Does this project involve the construction/installation of a wind turbine(s)?"*
C' Yes C•' No
If yes, please show the location of the wind turbine(s) on the permit drawings/project plans.
aick the upload button or drag and drop files here to attach docurrent
Fle rrust be F�F
5h. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as
jackhammers, mechanized pile drivers, etc.?*
�' Yes �' No
If yes to either, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on
the property.
C7ick the upload button or drag and drop files here to attach docurrent
NCDOT_Tran 127_NWP 3 cover letter.pdf
Fle rrust be FiJF
258.76KB
5i. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?*
NHP and USFWS
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
C' Yes C•' No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NMFS
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural
preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? *
C' Yes C No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources? *
NCDOT Human Environment Review under Programmatic Agreement.
7c. Historic or Prehistoric Information Upload
Gick the upload button or drag and drop files here to attach docurrent
10-08-0059_NoSurveyReq.pdf 5.05M6
13-08-0059 Transylvania.pdf 10.92MB
Fle rrust be F�F
8. Flood Zone Designation (Corps Requirement)
Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
C' Yes r No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?*
NC floodmaps.com
Miscellaneous attachments not previously requested.
C7ick the upload button or drag and drop files here to attach docurrent
Bridge 127 NWP 3 cover sheet.pdf 9.72KB
Tran 127 photos.pdf 1000.69K6
Fle rrust be FiJF
Signature
*
fJ By checking the box and signing below, I certify that:
. I have given true, accurate, and complete information on this form;
■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions AcY');
■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions AcY');
■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
■ I intend to electronically sign and submit the PCN form.
Full Name:*
Dave McHenry
Signature
�`�-���
Date
9/1 /2017
Initial Review
Is this project a public transportation project?
C� Yes C' No
Only change this if the project has been reassigned.
Has this project met the requirements for acceptance in to the review process?*
C� Yes
C' No
BIMS # Assigned*
20171101
Version#*
Reviewing Office *
Asheville Regional Office - (828) 296-4500
Select Project Reviewer*
Kevin Barnett:eads\khbarnett