Loading...
HomeMy WebLinkAbout20072251 Ver 1_Certification of Completion_20081117N 1 E NG P OF NORTH CAROLINA, INC. ENGINEERS • PLANNEKS • SIJRVEYCJRS November 13, 2008 401 Oversight/Express Permitting Unit NC Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650 Re: Thunder Road Force Main Encroachment Application Town of Spindale To Whom It May Concern: Enclosed with this letter is the Applicant's "Certification of Completion" for the above referenced project. Please let us know if you have any questions or need any additional information. Sincerely, Summit Engineering Group of North Carolina, Inc. Clay'M. Helms, P.E. Project Manager cc: Mike Brooks - Town of Spindale ??c?cad?D NOV 1 7 2008 DENR - WATER QUAL17Y rLANOS AND STi')RMWAMR BRANC14 p@M0WM[9) DWQ Project No.: Certification of Com ip etion Nov 1 7 2008 DENR - VVA(ER DUALITY TLANDS AND STORMWATER BRANCH 0 7 County: ! t om ?? e r .6 r Applicant: I C? Project Name: S (2 M A l 01 Fv Date of Issuance of Certification or Authorization: t /14aiA YctVt (4 q/. ?. d'. Certificate of Completion upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer.. It is not necessary to send certificates from all of these. Applicant's Certification I, a f .-l Shereby state that, to the best of my abilities, due care and diligence was used in the o rvation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. --?'f Date: Sign Agent's Certification I, - hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: N If this project was designed by a Certified Professional as a duly registered Professional (i.e., Engineer, I, Landscape Aiphitect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permtttee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built witl -hi substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date