Loading...
HomeMy WebLinkAbout20081552 Ver 1_Approval Letter_20081106owa rF9Q? Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality November 6, 2008 DWQ# 08-1552 Wilkes County Mr. Tom Lawley Pride Homes, Inc. Five Springs Subdivision PO Box 2429 Denver, NC 28037 APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Lawley: You have our approval, in accordance with the attached conditions, to place permanent fill in 80 linear feet to the South Yadkin, in order to construct road crossings and to repair and stabilize an additional 50 linear feet conduct repair activities for the Five Springs Subdivision on Cove Gap Road near Wilkesboro in Wilkes County, as described in your application received by the Division on October 8, 2008 and additional information received in the Winston-Salem Regional Office on November 6, 2008. After reviewing your modification application, we have determined that this fill is covered by General Water Quality Certification Numbers 3705, which can be viewed on our web site at htlp://www.ncwateEquality.org/wetlands.html. This Certification allows you to use Nationwide Permit Number 29 when it is issued by the U.S. Army Corps of Engineers. In addition, you should secure any other applicable federal, state or local permits before you proceed with your project, including (but not limited to) those required by Sediment and Erosion Control (including trout buffer waivers as necessary), Non-Discharge, and Water Supply Watershed regulations. Also, this approval will expire when the accompanying 404 permits expire unless otherwise specified in the General Certification. This approval is valid only for the purpose and design that you have described in your application. If you change your project, you must notify us in writing, and you maybe required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fill for this project (now or in the future) exceeds one acre, or total fill to perennial streams equals or exceeds 150 linear feet, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification, as well as the additional conditions listed below: No6i Carolina ?tura!!y North Carolina Division of Water Quality 585 Waughtown Street Phone (336) 771-5000 Customer Service Winston-Salem Regional Office Winston-Salem, NC 27107 Fax (336) 771-4630 1-877-623-6748 Internet: www.ncwaterqualitLorg An Equal Opportunity/Affirmative Action Employer- 50%a Recycled/10% Post Consumer Paper Mr. Tom Lawley November 10, 2008 DWQ # 08-1552 Page 2 1. The following impacts are hereby approved as long as all other specific and general conditions of this Certification are met. No other impacts, including incidental impacts, are approved: Identifier Stream Impact length Stream Crossing #1 South Yadkin 40 linear feet Stream Crossing #2 South Yadkin 40 linear feet Total 80 linear feet 2. Repair and restoration of an additional 50 linear feet of an Unnamed Tributary to South Yadkin in response to violations at the site is hereby approved by this certification. Restoration shall be in accordance with the plans received by the Division on October 8, 2008. Repair activities shall occur only under the supervision of the restoration designer or his designee. The Division shall be notified upon completion of the repair work. 3. If any changes occur to the stream repair or impact areas due to redesign of the Sediment and Erosion Control Plan then a permit modification must be submitted to, and approved by, the Division prior to implementing any additional impacts or impact modifications. 4. Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place at the time of recording of the property, or of individual lots, whichever is appropriate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project. 5. There shall be a minimum 30-foot protected buffer along the stream repair areas. 6. All channel reconstructions and repairs will be constructed in a dry work area and stabilized before stream flows are diverted. Vegetation used for bank stabilization shall be limited to native woody species on both sides of the relocated channel. A transitional phase incorporating coir fiber and seedling establishment is allowable. 7. The permittee shall visually monitor the in-stream structures, repaired channels, and vegetative plantings to assess and ensure complete stabilization of the repaired stream segments. The monitoring shall be conducted quarterly for a minimum of 1 year after final planting or two bankfull flow events, whichever is longer. 8. Natural fiber matting for stream stabilization is recommended over plastic matting that can impinge and entrap small animals. 9. Upon finishing the project, the Applicant shall fill out and return the enclosed "Certificate of Completion" to notify NCDWQ when all work included in the §401 Certification has been completed. This certificate should be returned to the Winston-Salem Regional Office of the NCDWQ at the address listed on the form. Mr. Tom Lawley November 10, 2008 DWQ # 08-1552 Page 3 If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Amy Euliss in the DWQ Winston-Salem Regional Office at 336- 771-4959 or at amy.euliss@ncmail.net. Sincerely, / Coleen H. Sullins, Director Division of Water Quality cc: Monte Matthews, U. S. Army Corps of Engineers, Raleigh Regulatory Field Office Chris Huysman, Wetland and natural Resource Consultants, 3674 Pine Swamp Road, Sparta, NC 28675 DWQ Winston-Salem Regional Office DWQ Wetlands/401 Mr. Tom Lawley November 10, 2008 DWQ # 08-1552 Page 4 DWQ Project No.: County: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Engineer's Certification I, Partial Final , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date