Loading...
HomeMy WebLinkAbout20171100 Ver 1_PCN Form Submission_20170831Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 8/31 /2017 4:15:34 PM (Start Event) Accept by Carpenter,Kristi 8/31/2017 4:45:47 PM (DOT Initial Review) • The task was assigned to Carpenter,Kristi . The due date is: September 5, 2017 5:00 PM 8/31 /2017 4:16 PM �� � 6fvlslaa of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 28, 2017 Ver 1.8 * Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red. Below is a link to the DRAFT online help file. http://edocs.deq.nc.gov/WaterResources/0/doc/549884/Page1.aspx A. Processing Information County (or Counties) where the project is located:* Tyrrell Is this a NCDOT Project?* C� Yes �' No (NCDOT only) T.I.P. or state project number: WBS # 44436 (for f�1CDOT use only) � 1a. Type(s) of approval sought from the Corps:* rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: Nationwide Permit (NWP) Number: NWP Number Other: List all MNnurrbers you are applying for not on the drop down list. 12 - Utility Lines 14 - Linear transportation 1c. Type(s) of approval sought from the DWR:* check all that apply fJ 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: * C•' Yes C' No For the record only for Corps Permit: �' Yes C� No 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from rritigation bank or in-lieu fee program C' Yes C•' No 1f. Is the project located in any of NC's twenty coastal counties?* �' Yes l" No 1g. Is the project located within a NC DCM Area of Environmental Concern (AEC)?* C� Yes �' No C' Unknown B. Applicant Information 1a. Who is the Primary Contact?* I Paul Williams 1b. Primary Contact Email:* pcwilliams2@ncdot.gov � 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (252)482-1861 1d. Who is applying for the permit? I r Owner �J Applicant (other than owner) r Agent/Consultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: NCDOT Right-of-Way SR 1209 - Tyrrell County 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) 2d.Address Street Address Address Line 2 �Y Fbstal / Zip Code 2e. Telephone Number: (xxx)xxx-xxxx 2f. Fax Number: (xxx)xxx-xxxx 2g. Email Address:* pcwilliams2@ncdot.gov 3. Applicant Information (if different from owner) 3a. Applicant is: �' Agent r Other K other please specify. State / FYovince / F�gion Country 3b. Name: I Paul Williams 3c. Business Name: (if applicable) NCDOT 3d.Address Street Address 113 Airport Dr. Address Line 2 Qty Edenton F�stal / Zip Code 27932 3e. Telephone Number: (252)482-1861 (xxx)xxx-xxxx 3f. Fax Number: (252)482-8722 (xxx)xxx-x�cx 3g. Email Address:* pcwilliams2@ncdot.gov State / Rovince / I�gion NC Country USA C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* SR 1209 Drainage Improvements - Pipe Replacement I 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town:* Columbia 1d. Driving directions* If it is a new project and can not easily be found in a G� rrapping system Rease provide directions. On SR 1209 Road St., appro�amately 400 ft. N of Green Street in the Town of Columbia 2. Project Identification 2a. Property Identification Number: (tax RN or parcel ID) 2b. Propertysize: (in acres) 1 2c. Project Address Street Address Address Line 2 �� Fbstal / Zip Code 2d. Site coordinates in decimal degrees State / R-ovince / F�gion Country Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For e�mple, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) I Latitude:* Longitude:� 35.922614 -76.247533 ex:34208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Tributary (North Boundary Canal) to Scuppernong River 3b. Water Resources Classification of nearest receiving water:* SC Surface Water Lookup 3c. What river basin(s) is your project located in?* Pasquotank RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* I Project area consist of NCDOT SR 1209 and culvert in North Boundary Canal. The adjacent property use is a mix of residential and commercial. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) qick the upload button or drag and drop files here to attach docurrent Location Map.pdf 1020.83K6 Fle type rrust be pdF 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Gick the upload button or drag and drop files here to attach docurrent Soil_Map.pdf 491.82KB Fle type rrust be pdf 4d. List the total estimated acreage of all existing wetlands on the property: n/a 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 65 feet in North Boundary Canal (perennial) 4f. Explain the purpose of the proposed project: Replace deteriorating culvert and maintain a stabile road way along SR 1209 for the safety of the traveling public. Existing sidewalk will be extended for pedestrians. 4g. Describe the overall project in detail, including the type of equipment to be used: The e�asting 36" X36' CMP will be removed and replaced with the proposed 16' X4'3" X40' corrugated aluminum box culvert. The grade of the roadway will be elevated 18" and the existing sidewalk will be extended over the proposed culvert. This work will be accomplished using cranes, track excavators, backhoes, and dump trucks. Dewatering operation will temporarily impact approx. 0.01 acre of the canal. Two water lines will be relocated during the dewatering phase of the project. 4h. Please upload project drawins for the proposed project. aick the upload button or drag and drop files here to attach docurrent 170823 11x17 Permit Drawings.pdf 409.62KB Fle type rrust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* �' Yes C' No f Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? * C�' Preliminary C' Approved C' Unknown Corps AID Number: Exarrple: SAVw2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: NCDOT Sd. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5d1. Jurisdictional determination upload Gick the upload button or drag and drop files here to attach docurrent Fle type rrust be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C' Yes C•' No C' Unknown 7. Future Project Plans 7a. Is this a phased project?* C' Yes �' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed I m pacts I nventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands r Streams-tributaries r Buffers rJ Open Waters r Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. "" All Perennial or Intermittent streams must be verified by DWR or delegated local government. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Site # - Reason for i impact Culvet extension N�p label (e.g. I�ad Qassing 1) Te mp. dewatering/waterline trenching N�p label (e.g. F�ad Qossing 1) 4b. Impact type P F�rrranent (P� or Terrporary (� T F2rrranent (P� or Terrporary (� 4c. Name of waterbody Trib. (North Boundary Canal) to Scuppernong River (if applicable) Trib. (North Boundary Canal) to Scuppernong River (if applicable) 4d. Activity 4e. Waterbody4f. Impact area type type Fill Ditch 0.01 (acres) Dewatering Ditch 0.01 (acres) 4g. Total temporary open water Impacts: 0.01 4g. Total permanent open water impacts: 0.01 4g. Total open water impacts: 0.02 4h. Comments: Permanent Fill will actually be <0.01 acres, but unable to input anything less than 0.01 into field above. Stream Index 30-14-4-(9) for the Scuppernong River. 5. Pond or Lake Construction If pond or lake construction is proposed, then complete the chart below. 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. I E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Culvert replacement will stay on the ebsting alignment and traffic will be detoured around the site by using an off- site detour. This will reduce temporary impacts to open waters by not utilizing an on-site detour and keeping the road open. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* NCDOT BMP's will be followed during bridge removal/installation and erosion control devices will be installed to prevent sediment loss from the project site. NCDOT BMP's will be followed for the dewatering operation. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? f Yes C•' No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1a. Does this project require a Stormwater Management Plan? C•' Yes C' No 1b. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: �Stormwater details in attached memo` 1c. What is the overall percent imperviousness of this project? % 1d. Who will be responsible for the review of the Stormwater Management Plan?* r Certified Local Government ri DWR 401 & Buffer Permitting Branch 2. Diffuse Flow Plan r DEMLR Stormwater Review r DWR Transportation Permitting Branch 2a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C' Yes If no, explain why: Pasquotank River Basin C•' No 5. DWR 401 Stormwater Review 5a. Is the Stormwater Management Plan (including BMP Supplemental Forms and Operation and Maintenance Agreements) attached? C' Yes [" No Stormwater Management Plan Upload Gick the upload button or drag and drop files here to attach docurrent file type rrust be pdf G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* �' Yes C' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?* r Yes r No Comments:* Covered by Minimum Criteria Checklist. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * C' Yes �' No 2b. Is this an after-the-fact permit application?* C' Yes �' No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water qualit�i?* C' Yes �' No 3b. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWR Requirement) 4a. Describe, in detail, the treatment methods and dispositions (non-discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. no waste water will be generated from this project 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* C' Yes �' No Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?* C' Yes C•' No 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. Is this a DOT project located within Division's 1-8?* r Yes C' No 5i. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* NC Natural Heritage Data Explorer Website 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes �' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* National Marine Fisheries Database 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? * C' Yes �' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * NCSHPO Website 7c. Historic or Prehistoric Information Upload C7ick the upload button or drag and drop files here to attach docurrent Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes c" No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination?* NC Flood Maps website Miscellaneous attachments not previously requested. aick the upload button or drag and drop files here to attach docurrent 170808 Environmental Permitting Narrative.pdf 227.82KB USACE Request Letter.pdf 938.91 KB Fle rrust be FDF Signature * rJ By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Paul Collins Williams, Jr. Signature {��}ri�/���/b' 1{%/Y/'rvmd, (yr. Date 8/31 /2017 Initial Review Is this project a public transportation project? C' Yes C' No Only change this if the project has been reassigned. Has this project met the requirements for acceptance in to the review process?* �' Yes C' No BIMS # Assigned* 20171100 Version#* Reviewing Office * Washington Regional Office - (252) 946-6481 Select Project Reviewer* Garcy Ward:eads\gpward