Loading...
HomeMy WebLinkAbout20020906 Ver 1_Mitigation Closeout Report_20170807NC DMS Closeout Report Project Type: Buffer Project 2017 Project Name Suck Creek- contingency addendum to original closeout report DMS Project ID 368 Full Delivery Contract # NA Institution/Contract Date 7/01/2002 Basin Cape Fear 8 -digit CU 03030003 County Moore Applicable Buffer Rule (s) Randleman Buffer Rule 15A NCAC 0213.0252 Non -Diffuse Flow Area Removed: Memo or W.S. calculation NA Date Planted 04/01/2004 Date of Supplemental Plant 01/2013 Protection mechanism Suck Creek DMS Property Portfolio: Easement & Survey Easement Acreage 9.22 Stewards DENR Stewardship Encroachments & Resolution NA Accepted for transfer to stewardship Y- currently in long term management Asset Table Project Applicable Credit Buffer Width Buffer Resulting Notes Component Rule Eligible Adjustment Mitigation Mitigation of a minimum of two species supplemental plant in 2013 buffer resulted in 13/13 transects Credit Ratio Units meeting in 2015 and 3/3 • 4 buffer transects 2017 (sq. ft.) R=1 (BMUs) E=2 Suck Creek 15A NCAC 207,412 No width 1:1 207,412 Two ponds and 02B.0252 adjustment; all three crossings areas < 50 feet removed from buffer assets removed; no 13,296 sq. ft. buffer areas> 50 feet removed around included ponds Totals 207,412 207,412 Success Criterion Project Component Success Criteria per Approved Success Criteria Met Mitigation Plan Riparian Buffer 320 native stems per acre comprised Yes — 4/7 plots met 2010, of a minimum of two species supplemental plant in 2013 • 7 plots established at baseline resulted in 13/13 transects • 12 buffer transects 2015 meeting in 2015 and 3/3 • 4 buffer transects 2017 transects meeting in 2017 Vegetation Data: Tablela. Original Dataset submitted with closeout report 2009 (please see corresponding Map 1a) Species Total Planted Stems # plots Avg # stems plot 79-1- 3- year:5 plot 79-1- 4- year:5 plot 79-1- 5- year:5 plot 79-1- 6- year:5 plot 79-1- 7- year:5 plot 79-1- 8- year:5 plot 79 -1 - 9- year:5 Acer rubrum 4 2 2 17 3 Stems/ac 1 3578 2562 3177 Alnus serrulata 2 2 1 1332 2665 1332 1 1230 1 Betula nigra 32 4 8 1 9 13 9 445* Celtis occidentalis 1 1 1 1 Cornus amomum 1 I 1 1 Diospyros virginiana 1 1 1 1 Fraxinus pennsylvanica 7 4 2 1 3 2 1 Liquidambar styraciflua 1 1 1 1 Pinus taeda 4 3 1 1 2 1 Platanus occidentalis 6 2 3 1 5 Quercus phellos 2 2 1 1 1 Salix nigra 9 4 2 1 1 6 1 12 70 12 2 5 8 6 23 17 11 0 Stems/acre 202.4 323.84 242.88 931.04 688.16 445.28 0 The stream assets were closed out in 2009, however the buffer closeout was delayed to allow for supplemental planting to occur in areas not meeting the 320 stems per acre buffer criterion indicated on Map 1a on following page. A supplemental plant was completed in January 2013; 1,400 stems were installed on 3.43 acres (density of 408 stems/acre). Thirteen vegetation transects located within the current buffer extent were surveyed in 2015. Prior to closeout in 2017 three of the 2015 transects were resurveyed (Tablelb). All vegetation transects far exceeded the 320 stems per acre buffer mitigation requirement. Table 1b. Transect Number 2015 Data 1 2 4 5 6 7 9 10 22 21 19 17 23 Stems/ac 1127 3578 2562 3177 1947 2152 2870 2152 1332 2665 1332 410 1230 2017 Data Stems/ac 655* 445* 485 *These plots had additional stems, Bacchoris halimifolia, not included in densities in 2017. ` ,VT22 0 7711, \ON VT21 I'♦♦��♦ .� �+ gar-J� - . - V�T19��•' ��♦o VT8 � it ail i� ��= 2-10 '\V28U 71 i�VT11 VT18 i� 6 VT7 Legend 19 0 VT2 r4 VT12 - ���♦♦�`oa♦���$���"���a� AS S e t Leve N \ \ r�� �� �ar+a�. VT16 ;.. l�♦♦♦♦ ��,tf.0<VT6,". NA VT1 3' ViLk O >�� VT14��♦ VT4� Fixed Veg PIs t « VT3�A�♦f,�hg 6 g s a NBuffer Transects �., Easement �Z 0 Supplemental Planting Y` = Channel Revised asset map: 3 2017' Map 1a. Original Asset Map Included in 2009 Closeout Report Suck Cream (EES' #368) Asset Map 0 100 200 4M 0 800 Feet` d . S Appendix A: Project Correspondence — DWR Buffer Viability Letter and or DWR Approval or BMP As -built Package. NO DWR Viability Letter Available Appendix B: Additional Data — Original 2009 Closeout Report r� Ecosystem PROGRAM Project Closeout Summary—Suck Creek (2009) Table 1. Suck Creek Project Restoration Components and Mitigation Assets Stream Project ID & Status Project Name/Number: Suck Creek Drainage/Hydrology ComponentStationing EEP ID : 368 Ratio County: Moore Level I Multip Feet SMU Acres Buffer Project Type: Stream Restoration R 1 1.00 2889 2889 2889 2889 Current Status: 5 Years of Monitoring complete Project Setting & Classifications Project Timeline 2,3,7,8 Basin: Cape Fear Milestone Date Physiographic Region: Piedmont 1.00 4.59 4.59 Drainage: (4.8 SM) Permitted June 2002 Watershed: Rural Pasture, Imp cover <1% Construction Jan -Apr 2003 Ecoregion: Triassic Basin 45g USGS Hydro Unit: 03030003 Site Planted Apr 2004 NCDWQ Subbasin_ 03-06-10 As -Built Mar 2004 Thermal Regime: Warm Monitoring Year -1 Fall 2004 Monitoring Year -2 Fall 2005 Monitoring Year -3 Aug 2006 Monitoring Year -4 Jul 2007 Monitoring Year -5 Mar - Sep 2008 Table 1. Suck Creek Project Restoration Components and Mitigation Assets Stream Asset Data Drainage/Hydrology ComponentStationing Asset Ratio Map # I Approach I Level I Multip Feet SMU Acres Buffer Suck Creek 1+00 to 29+63) 1 P1/P2 I R 1 1.00 2889 2889 2889 2889 Buffer lCurrently Eligible Buffer 2,3,7,8 R 1.00 2.49 2.49 Potential Buffer Assuming Supplemental 1 4,5,6 R 1.00 4.59 4.59 Page 1 of 11 Suck Creek (368) Closeout Summary Mitigation Project Suck Creek DMS ID 368 River Basin CAPE FEAR Cataloging Unit 03030003 Applied Credit Ratios: 1:1 1.5:1 2.5:1 5:1 1:1 3:1 2:1 5:1 1:1 3:1 2:1 5:1 1:1 3:1 2:1 5:1 1:1 3:1 10:1 Information from DMS Debit Ledger dated 06/12/2017 c cc c c C c c 4 c ° q o £ 'z .0 E £ E E '� '� 4 y om v C s' d N c O v N o c ani p N U N y N «O d ` U C L d ` N a' 2 U c N L N ` y d K L U L ` L c W ` O. d L c W 5UN O. WW £ lL a £F m O N R N A Q lL m m N L A CO7 O N £ N O. ? O F Q Y m CO N U O to N K O. 10 CL Q' a. O Z C Z c = O V M N O U N Y N m £ d N V Z Z U U U N y Beginning Balance (feet and acres) 2,889.00 207,412.00 Beginning Balance (mitigation credits) 2,889.00 207,412.00 NCDOT Pre -DMS Debits (feet and acres): Not Applicable DMS Debits (feet and acres): DWR Permit No USACE Action IDs Impact Project Name 2002-0091 2002-20329 Advance Auto Parts 185.00 Polo Ralph Lauren 2003-0110 2003-20345 loading dock expansion 380.00 1999-0503 Friendship Airport 266.00 2003-0799 2003-20814 Hilltop Road Widening 800.00 Maryfield Retirement 2005-0578 2001-20668 Center 759.00 Hornaday Road 2006-0138 2006-20357 Improvements 220.00 West Landing 2006-1758 2006-20400-253 Development 279.00 Riparian Buffer ILF Credit Purchase 207,412.00 Remaining Balance (feet and acres) 0.00 0.00 Remaining Balance (mitigation credits) 0.00 0.00 Information from DMS Debit Ledger dated 06/12/2017 Mitigation Project Name Suck Creek (Purchase) DMS ID 368 River Basin CAPE FEAR Cataloging Unit 03030003 Comment: This ledger shows the debits for the amount of mitigation that the Riparian Buffer ILF Program purchased from the Statewide ILF Program. The beginning balance represents the amount purchased and not the total mitigation credits available on the site. Applied Credit Ratios: 1:1 3:1 19.163 297.541 Information from DMS Debit Ledger dated 06/12/2017 o' E c w_ o c Z d L C 2 T C II 2 t 6 W O _ N C3 N rO y Z O L a E 00 O Z z a� N E m N m m Beginning Balance (square feet) 207,412.00 Beginning Balance (mitigation credits) 207,412.00 DMS Debits (credits): DWR Permits Impact Project Name DOT - Greensboro Western Urban Loop 2003-0909 Randleman Wate Remaining Balance (square feet) 207,412.00 Remaining Balance (mitigation credits) 0.00 Information from DMS Debit Ledger dated 06/12/2017