HomeMy WebLinkAbout20170912 Ver 1_More Info Received_20170829Homewood, Sue
From: Amy Black <ablack@jewellengr.com>
Sent: Tuesday, August 29, 2017 1:23 PM
To: Homewood, Sue
Cc: 'Gibby, Jean B CIV USARMY CESAW (US)'
Subject: RE: Spring Park Submittal - Winston Salem, NC
Attachments: 6.3_REV_Aug28.pdf, 8.0 Stream_REV_Aug28.pdf, 8.1 Stream_REV_Aug28.pdf
Sue & Jean,
Here are the revised pipe network and stream sheets showing Line E entering the stream. We decided to allow the pipe to
discharge to the bankfull bench and provide a stone connector to the stream. We did relocate the discharge a little further
downstream to allow the flow to enter the stream at an angle.
Please let me know if you have any other questions or need additional information to approve these plans.
Thanks
Amy Black, PE
JEWELL Engineering Consultants
ablack@jewellengr.com
336-996-9974 ext 107
From: Amy Black [mailto:ablack@jewellengr.com]
Sent: Monday, August 07, 2017 4:24 PM
To:'Homewood, Sue' <sue.homewood@ncdenr.gov>
Cc: 'Gibby, Jean B CIV USARMY CESAW (US)' <Jean.B.Gibby@usace.army.mil>
Subject: RE: Spring Park Submittal - Winston Salem, NC
Sue,
Sue,
Yes, I believe it will be feasible (and desirable) for Line E to be modified to enter the stream at an angle. I will work with Kris Bass
to determine the best location/alignment for that discharge. I can get you a revised sheet with that modification, but it will likely
be a week or so before I can get that turned around. Let me know if the delay causes a problem and I will try to get that turned
around more quickly.
Jean,
I reviewed the NWP-14 and the only limitation is that the impact does not cause the loss of greater than % acre of waters of the
US. The impact under NWP-14 is limited to the minimum necessary and be in the immediate vicinity of the project. Although the
worst area of bank failure is in the location that we propose to pipe and fill, there are other areas along West End Boulevard
where the banks are experiencing significant erosion. The entire length of stream within the project area is located adjacent to
West End Boulevard and the roadway is located at the top of the left streambank.
If this project should be permitted under a different NWP, please advise.
Thanks
Amy Black, PE
JEWELL Engineering Consultants
ablack@jewellengr.com
336-996-9974 ext 107
From: Homewood, Sue [mailto:sue.homewood@ncdenr.gov]
Sent: Thursday, August 03, 2017 3:42 PM
To: Amy Black <ablack@jewel lengr.com>
Cc:'Gibby, Jean B CIV USARMY CESAW (US)' <Jean.B.Gibby@usace.army.mil>
Subject: RE: Spring Park Submittal - Winston Salem, NC
Amy,
A couple quick questions:
Your PCN indicates 166 linear feet of fill in a perennial stream. Although DWR does not require mitigation for this length
of impact, the USACE typically does. Have you discussed this with Jean Gibby at all?
Line E of the new stormwater pipes appears to outlet into the stream at a perpendicular angle to the channel. We prefer
stormwater pipes be aligned with stream flow as much as possible to reduce shear stress along the opposite bank. Is it
feasible to modify that alignment to address our concern?
Jean,
I suggested to Amy that I thought it was feasible to cover the fill portion of this project under a NWP14 because it is to protect the
road/shoulder. Can the stream enhancement/restoration work downstream also be covered under a NWP14 or would you cover
that under a NWP27? I didn't see a set of plans that included that at the time so I didn't think to mention it to her. I just need to
be sure I issue the 401 for the correct GC(s).
Thanks,
Sue Homewood
Division of Water Resources, Winston Salem Regional Office
Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue. Homewooda-ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Amy Black [mailto:ablack@jewellengr.com]
Sent: Friday, July 14, 2017 8:48 AM
To: Higgins, Karen <karen.higgins@ncdenr.gov>; 'Gibby, Jean B CIV USARMY CESAW (US)' <Jean.B.Gibby@usace.army.mil>;
Homewood, Sue <sue.homewood@ncdenr.gov>
Subject: Spring Park Submittal - Winston Salem, NC
Karen Higgins,
Jean Gibby,
Sue Homewood,
I am planning to send the PCN/Request for Water Quality Certification for the Spring Park Slope Stabilization, Stream Restoration,
Drainage and Roadway Improvements Project located in Winston Salem next week. The plan set has 41 sheets, including roadway
plans & cross sections, traffic control, pavement markings, etc... Is it acceptable to send an abbreviated set of plans?
I am proposing to send the following sections:
Cover Sheet & Vicinity Map
Notes, Abbreviations, & Legend
Existing Conditions
Erosion & Sediment Control & Details
Demolition Plan
Stormwater Drainage System Plan (Plan & Profile Only, no details)
Stream Restoration Plan (with details)
Planting Plan
This set excludes Roadway Plan, Traffic Control Plan, and Stormwater Details. This will reduce the plan set from 41 sheets to 14
sheets.
Please let me know if a full set is preferred.
Thanks
Amy Black, PE
JEWELL Engineering Consultants
ablack@jewellengr.com
336-996-9974 ext 107
)CD
0
98 O
\ / aoldod 9�' --o\ - V
,0
g
+00.
a Idod o,,- -
\ n
p�docy" 9�'gqg
Q 0
� —
� 1
� yoaad0� _
4��
v
�Do O as dr ��cFAgT
� ti
Uoaoe 0 -
yoaa8 0'00
\ �
o 1oubod
O c�,
8zO
O
O
O O
\p\oo0oo„�, \ �\�
�� 0 cp
uo0\0\
pooManos zl
Section: SL—PO
100+09.21
i
Slope 2:1 /
Bankfull Bench
Maintenance Path
Bankfull Bench
Section: SL—P3
102+54.83
102+00,00 -
792
r
�� yoaad,0
Slope 2:1 —/
Bankfull Bench
REV
REVISIONS
BY
DATE
CHECKED BY:
AWB
APPROVED BY:
CDJ
Maintenance
\_ Bankfull Bench
ISSUE DATE:
August 28, 2017
CITY PROJECT NUMBER:
000024497
JEC PROJECT NUMBER:
15-149-034
° Q
D � �
00 00 �0/ p\°\o p \\ o \ \
p \O o0 O\O o0
no ul
D
C CO Z�g----------
>o
zr-
400” Of
0 10' 20' 40' 60' g
aol d 0« 8t SCALE: 1"= 20' 17 g
Section: SL—P1
100+58.13
103+50,0
000 —
n0 n u�
S uMou�un
�o aa�sn10 \
\ ado
M/S o L
sod
ao ua_j
Q� Inoo� �,
Q
ao do aoldod0�' \
� d„ z�
ao\od,, _qC
1a0 Zai yI°90Z J01do601�
ao1dod„oP
DRAWN BY:
KB
CHECKED BY:
AWB
APPROVED BY:
CDJ
\_ Bankfull Bench
ISSUE DATE:
August 28, 2017
CITY PROJECT NUMBER:
000024497
JEC PROJECT NUMBER:
15-149-034
° Q
D � �
00 00 �0/ p\°\o p \\ o \ \
p \O o0 O\O o0
no ul
D
C CO Z�g----------
>o
zr-
400” Of
0 10' 20' 40' 60' g
aol d 0« 8t SCALE: 1"= 20' 17 g
Section: SL—P1
100+58.13
103+50,0
000 —
n0 n u�
S uMou�un
�o aa�sn10 \
\ ado
M/S o L
sod
ao ua_j
Q� Inoo� �,
Q
ao do aoldod0�' \
� d„ z�
ao\od,, _qC
1a0 Zai yI°90Z J01do601�
ao1dod„oP
Section: SL—P4 1103+58,1791
\ Geolift
(see details)
Bank Repair
Area
Bankfull Bench
DO NOT USE
FOR CONSTRUCTION
PREPARED BY: PREPARED FOR:
KRIS BASS A EWELL
ENGINEERING ENGINEEFIING CONSULTANTS, PC
625S Lakeside Drive LIC # P1133 PO BOX 2294 LIC # C1842
Raleigh, NC 27606 KERNERSVILLE, NC 27284
(919) 960.1552 kbeng.org (336) 996-9974 jewellengineering.pro
City of
WINSTON-SALEM
NORTH CAROLINA
00
O
X�
g' C-1) — -
'�0�0
-JDldocj ()C-
aolOd, O b ao\od 9� g
_U0uadod«O �
g i-)oldo .. z ��� ° 0)
�0 �ao4o H Z, d a 6_0C, 400„01
�5 4
O 105+00.00
104+00,00
aa/dod,, 9z d0
77
u
�—aaiOd«O
oUo�
M/S
Stream Restoration Grading
Section: SL—P2
1101+31.271
Section: SL—P5
Channel
W: 10'
D: 2'
Tie to existing
nkfu-11 Bench
STREAM RESTORATION PLAN
SHEET NO.
8.1
nnel
10'
2'
Maintenance
\_Rnnkfijll
Bench
Path
Section: SL—P4 1103+58,1791
\ Geolift
(see details)
Bank Repair
Area
Bankfull Bench
DO NOT USE
FOR CONSTRUCTION
PREPARED BY: PREPARED FOR:
KRIS BASS A EWELL
ENGINEERING ENGINEEFIING CONSULTANTS, PC
625S Lakeside Drive LIC # P1133 PO BOX 2294 LIC # C1842
Raleigh, NC 27606 KERNERSVILLE, NC 27284
(919) 960.1552 kbeng.org (336) 996-9974 jewellengineering.pro
City of
WINSTON-SALEM
NORTH CAROLINA
00
O
X�
g' C-1) — -
'�0�0
-JDldocj ()C-
aolOd, O b ao\od 9� g
_U0uadod«O �
g i-)oldo .. z ��� ° 0)
�0 �ao4o H Z, d a 6_0C, 400„01
�5 4
O 105+00.00
104+00,00
aa/dod,, 9z d0
77
u
�—aaiOd«O
oUo�
M/S
Stream Restoration Grading
Section: SL—P2
1101+31.271
Section: SL—P5
Channel
W: 10'
D: 2'
Tie to existing
nkfu-11 Bench
STREAM RESTORATION PLAN
SHEET NO.
8.1
ul 'A ul
i ioldad,9� gq g
aOldod„ 0z 0 \ g
o
---
aal od<<9Z- aaldod 0� �/g -------
-
o try-e'te iff le g V �
ao do C Vanes
/ twads and
0 9 g � � � Cross - / � _
��.. - l Cb - Pool
_
Bench Enhancement old°d 9�/ A -
�\ �ZSgs
I� F _ ----(planting) � \
1�8 8— - lantin Bench Enhanceme f ,
x �aoldod,.0� o
r
;
C�
-
J do d,,
, I 0 t
Boulder
Steps
\ o, "C
} 4p
o o c
u e«zI
iP-11-11 11 '/
v \ e
ol d°0 9 Rootwads and
aold0 V Pool
�Do"p6'
�
B�kfull Bench
U 8 8Z Ua°a8"0� l % Rootwads ands
oaa ao c _ Pool
D O
0i1ou6oW l \ \ D
\\(O
CQ
'�°o„ 8z D
\ oCP
P O O M G O (3�
O cp
r
Cp
� � D 'l °0« 0r P 4°0, 9� Q°0 poaMana
\ \\ S« z 1
Co'mbi
0
792
�7\ ;7WC3*��'
UoaeB 01�
�Cb
�move�co
C_1J
0) Lt' 8Z�
n0 -A ul
Zig
tCP
z' g
�g
S uMou�un -
—aoldod,,0o JO aa}sn10GO z,
a0 .
0 10' 20'_ 40'
O �
M/S °uo0
sod SCALE: 1 "= 20'
}\�Cv
a o ua� \�
g g C-1)
'00„9l
� gZg
l\ JOldod O�-
mOVe-
- �
aaldod„0�
air Bench Enhancement S„°IdOd g� crossln
baOldod,, 9�(planting)
�7Zg
oU_J isaad«t'l --�� Id0CJ” t,Z
�_\\ ------ 6„0�' 100„01
9`
'Lo 9 � l 8
� -- - 6z's18
�ul
/ g
ld ��7
JO/ °d„ 9z 00
d�
Cross Va e
- snoo1,,
00� Constructed, Riffle �� Q❑
0 0
ao do0„z� -1 °l dod« 9g _
l
Bank enol o0«9� \ aoldod«01�
1a0 Zai �\ yl°O,0E apldo.9"o3
M/S
aaldod« 01�
P V' 0, JR N
StraRestoration Schematic
a Ion
99+75 10011 10111 10211 10311 10411 10511 105+49
BY
85
Cour Pool
Top of Bank
Culvert
84
_--
_ -
--
Top of Bank
Boulder
-
---_
Steps
-
°°
culvert
F71
8 3
I'D
Cross Vane
°
---------
I
\ �'--_� ��'
�/
-'----- -\�
Constructed
Constructed
-_ __
Riffle
- -
�
<+
-
Top
of Bank
O
o
°
-
Existing Riffle
Boulder/Log
Ste Pools
Scour Pool
8 2
----
--
I
Bou
der/Log
I
I
--
ConEtructed,_"--
Riffle
L Single Arm
-
Vane
Constructed
Cross Vane
/Z
Riffle
810-
80
99+75 100+00 101+00 102+00 103+00 104+00 105+00 105+49
0 10' 20' 40'
SCALE: 1"= 20' (HORZ) Stream Restoration Profile
1" = 5' VERT
REV
REVISIONS
BY
DATE
DRAWN BY: KB
CHECKED BY: AWB
APPROVED BY: CDJ
ISSUE DATE:
August 28, 2017
CITY PROJECT NUMBER:
000024497
JEC PROJECT NUMBER:
15-149-034
CONCEPT
DO NOT USE
FOR CONSTRUCTION
PREPARED BY: PREPARED FOR:
KRIS BASS UEWELL
ENGINEERING ENGINEERING CONSULTANTS, PC
625S Lakeside Drive LIC # P1133 PO BOX 2294 LIC # C1842
Raleigh, NC 27606 KERNERSVILLE, NC 27284
(919) 960.1552 kbeng.org (336) 996-9974 jewel lengineering.pro
City of
WINSTON-SALEM
NORTH CAROLINA
STREAM RESTORATION PLAN
i
SHEET NO.
8.0
t i
CI- El
REVISIONS
BY
DATE
APPROVED BY:
STA
18+78.08,19.48 RT
\
/
RIM
859.6 +/-
CI -F1
S
INV
OUT 852.00
g
STA 16+31.61, 19.68 RT
0+00
0+50
-
1
00 1+50
-860.00-
STA 18+
49.54, 9.89 LT
FINISHED GRADE
RIM 858.5
+/-
OF EQUAL
INV IN 8
0.78
CLASS 1, A,
INV OU
\
843.50
RIP RAP
0 Inv. 847.0
WEST END BLVD
MH -E3
STA 17+79.81, 39.804
Ex. 8" SS
Inv. 855.0
RIM 844.00
1535.00
-
EXISTING
GRADE
42 LF 18„ RCP
INV OUT 830.70
@2.9%
7g4 �F 1,9RCP
850.00
FINISHED GRADE
@ .6%
840.00
MH -E3
STA 17+79.81, 39.80 LT
E3 to S TREq
RIM 844.00
SEE L/NE E
INV IN 838.5 (S)
INV IN 838.5 (N)
INV OUT 828.5
840.00
835.00
830.00
INE E
40 LF 18 RCP @ 0.51Y(,
j
INV = 828.3
SEE OUTLET DETAIL
THIS SHEET
0 10' 20' 40' 60'
III
SCALE: 1"= 20' (HORZ)
1"= 2' (VERT)
REV
REVISIONS
BY
DATE
APPROVED BY:
CDJ
18" RCP @ 0.5%
\
/
NC DOT 840.02__,
4
CI -F1
S
-
DRAWN BY:
AWB
CHECKED BY:
CDJ
APPROVED BY:
CDJ
ISSUE DATE:
August 28, 2017
CITY PROJECT NUMBER:
000024497
JEC PROJECT NUMBER:
15-149-034
CONCEPT
DO NOT USE
FOR CONSTRUCTION
EXISTING
GRADE
835
18" RCP @ 0.5%
\
/
NC DOT 840.02__,
4
CI -F1
S
-
g
STA 16+31.61, 19.68 RT
INV = 828.3
RIM 848.32 +/-
INV OUT 844.00
STON
FINISHED GRADE
12" DEPTH
OF EQUAL
PART
CLASS 1, A,
AND B
RIP RAP
0 Inv. 847.0
MH -E3
STA 17+79.81, 39.804
RIM 844.00
-
INV IN 838.5 (N)
INV OUT 830.70
7g4 �F 1,9RCP
@ .6%
840.00
E3 to S TREq
SEE L/NE E
INE EF
CONCEPT
DO NOT USE
FOR CONSTRUCTION
6� �
NC DOT 84. 02 �
PPaTP('.T TRFFC STA 1,R+7 Q 48 RT 00
iA/ALL NC DO`T 840 02
)T 838.80
3+97.00 (Line A)
STA 18+49.54, 9.89 LT
CP 34
77
-� _.....
moi
MH -E3
NC DOT 840.52 ��
STA_ 17+79.81,, 39.80 LT
LINE E OUTL S°�
SS INVERT 828.5
-SEE-QPTL�SDETAIL ABOVE
Z
-gg-
ENGINEERING CONSULTANTS, PCWINSTON-SALEM
PO BOX 2294 LIC # C1842
KERNERSVILLE, NC 27284
OFFICE: (336) 996-9974 jewellengineering.pro
PREPARED FOR:
City o
NOR
TH CAROLINA
� SS
PREPARED BY:
JEWELL
835
18" RCP @ 0.5%
\
NC DOT 840.02__,
4
16+31.61, 19.6 -16)
S
-
g
INV = 828.3
STON
CONNECTOR:
12" DEPTH
OF EQUAL
PART
CLASS 1, A,
AND B
RIP RAP
825
LINE E OUTLET DETAIL
6� �
NC DOT 84. 02 �
PPaTP('.T TRFFC STA 1,R+7 Q 48 RT 00
iA/ALL NC DO`T 840 02
)T 838.80
3+97.00 (Line A)
STA 18+49.54, 9.89 LT
CP 34
77
-� _.....
moi
MH -E3
NC DOT 840.52 ��
STA_ 17+79.81,, 39.80 LT
LINE E OUTL S°�
SS INVERT 828.5
-SEE-QPTL�SDETAIL ABOVE
Z
-gg-
ENGINEERING CONSULTANTS, PCWINSTON-SALEM
PO BOX 2294 LIC # C1842
KERNERSVILLE, NC 27284
OFFICE: (336) 996-9974 jewellengineering.pro
PREPARED FOR:
City o
NOR
TH CAROLINA
� SS
PREPARED BY:
JEWELL
r"
0
C1 - F 1- _ S
NC DOT 840.02__,
16+31.61, 19.6 -16)
S
-
g
Spring Park Slope Stabilization, Stream Restoration, Drainage and Roadway Improvements
PLAN &PROFILE -LINE E
SHEET NO.
6.3
04W Z9