HomeMy WebLinkAboutNC0003425_Compliance Evaluation Inspection_20141215��A NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Pat McCrory Governor December 15, 2014 Mr. Mike Mosley Plant Manager Roxboro Steam Electric Power Plant 1700 Dunnaway Rd Semora, NC 27343 Dear Mr. Mosley: DEC 17 2014 CENTRAL FILES DWR SECTION John E. Skvada, III Secretary Subject: NPDES Compliance Evaluation Inspection NPDES Wastewater Discharge Permit No. NC0003425 Roxboro Steam Electric Power Plant Person County On November 19, 2014, Autumn Romanski and Eric Rice with the North Carolina Division of Water Resources conducted a Compliance Evaluation Inspection of the Roxboro Steam Electric Power Plant. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in NPDES Wastewater Permit No. NC0003425. The time and assistance of Duke Energy Environmental Services Staff, Plant Operators, and Laboratory Staff was greatly appreciated. A summary of the findings and comments noted during this inspection is provided in the attached copy of the complete inspection report titled "Water Compliance Inspection Report". If you have any questions concerning this report, please contact Autumn Romanski 919-791- 4255 in the Raleigh R:egiOffice. nicer ly, GrJ /y Danny Smi Raleigh Regional Operations Supervisor Attachments Cc: (w/attachments) Raleigh Regional Office — File DWQ/Raleigh — Central Files Electronic Cc: Mr. Shannon Langley and Mr. Robert Howard 2 1 P a g e Summary of Findings /Comments 1. Permit: Your NPDES Individual Wastewater permit became effective July 1, 2009 and expired on March 31, 2012. The facility is not currently under a Special Order by Consent. The facility was compliant with the NPDES permit wastewater requirements reviewed the day of the inspection. The application for permit renewal was received on October 10, 2011 as required. A recent update to the application has also been submitted The new permit has vet to be re -issued by the Division of Water Resources, therefore, this inspection was conducted based on NPDES wastewater dischargepermit issued July 1, 2009 as these requirements remain in effect until the new permit is issued. 2. Compliance Schedules: The permit does not have any outstanding compliance schedules for this facility. 3. Facility Site Review: The overall condition of the plant site was satisfactory. The appearance of the facility was in satisfactory condition indicating the current housekeeping practices are good. 4. Records/Reports: a) A review of the daily monitoring data submitted during the previous 12 -month period and a review of the permit conditions indicates the facility was in compliance with the permit requirements and/or limitations. The acdiby was issued no penalty assessments and no notices of violation for the 12 - month period The wastewater reports data, bench sheets, and operator logs, for the months of December 2013 and June 2014 were reviewed. The Flow data was provided on June 2, but the BIMS DMR system flag edema frequency violation due to 7 consecutive dans without a flow reading. This frequency violation can be corrected by forwarding an amended June 2014 DMR with a Flow/No Flow reading as applicable between June 3 and June 9, for Outfall 006. 3 1 P a g e The facility has provided the groundwater monitoring results as required by the Groundwater Monitoring Plan gated March 17 2011. Monitoring wells BG -1 CW -2 CW -2D, CW -3, and CW -3D were inspected. All wells were observed to be locked with well tags and caps present Monitoring wells were found to be in good condition Two of the wells had loose fitting well caps which were corrected at the time of the inspection The records for the Biological Monitoring Plan reside with the Environmental Sciences Section (DWR ESS The records for the Ash Pond Liam Integrity Inspections and the NPDES Stormwater permitting and compliance now reside with the Division of EnerQ,y Mines and Land Resources tNC DEMLR) and were not part of this inspection However, safety improvements were observed ar the Ash Pond Filter dike with the addition of new stairs and access road improvements The Ash Pond filter dike discharge flows to the internal NPDES Dischar e Outfall 002 An Operation and Maintenance Plan and Emergency Response Plan for the bioreactor is required General Electric is the consultant/supplier of the Bioreactor operations and maintenance and an Emergency Response Plan for the Roxboro Plant is inclusive of Bioreactor operations b) The facility must designate a certified Operator -in -Responsible -Charge (ORC) having a certification level equal to or greater than the facility classification. A Back-up ORC must also be designated with a minimum certification level at least one level less than the facility classification. The facility is currently in cor.iphance with these requirements The Operator in Responsible Charge (ORC) is Eric D Satterwhite He holds a PC -1 (Cert No 996750) and Wastewater III (Cert 989354) The permittee has several certified operators designated as Back-up Operators (BORC's) 41 Page 5. Self -Monitoring Program: You are reminded that your monitoring samples must be collected, preserved, and analyzed by appropriate procedures and methods. You should maintain records of the sampler temperature, and a certified laboratory must calibrate the sample thermometers annually. Your operator is reminded that he/she must keep a logbook of all operation/maintenance activities undertaken at the facility. The logbook should include all daily process control activities including any field measurements conducted for process control. A visitation log for the facility must also be maintained. The acility is currently in compliance with these requirements. 6. Laboratory: For all analytical data submitted for compliance monitoring purposes, a certified laboratory must be utilized for all laboratory analysis. Additionally, if field parameter testing is conducted, an operator certified to perform the specified field parameter analysis is also required. The operator needs to be sure to calibrate all meters/instrumentation before each use and retain all calibration records. The facility is currently in compliance with these requirements and utilizes Pace NC Certified Labs (different analytes are sent to different Pace locations- Raleigh Asheville....) The facility holds a current NC DWO Laboratory Field Parameter Certification 95080 for pH and temperature measurements. The Regional Field Inspectors checklist (to be forwarded to the DWO Laboratory Certification Program) was completed the day of the inspection and reflects the extent of laboratory items investigated� by Regional inspectors. Lab inspections are also performed separately by the Lab Certification Program. The Regional lab checklist results are attached. 7. Flow Measurement: If the permit requires a flow measurement device for determining the effluent flow, the flow measurement device must be calibrated annually. This facility is required to monitor and report plant pump log readings/intake flow for Outfall 003 and effluent flow for Outfall 002 (flowmeter), Outfall 010 (pump log ow meter), Outfall 009 (pump log - flows to Ash Pond 002), Outfall 006 (estimate/sta gua e), and Ou all 008 (pump log -flows to Ash Pond 002. The facdity was in compliance with flow measurement requirements the day of the inspection. 8. Effluent/Receiving Waters: The effluent discharge should be clear with a continuous flow with no visible changes to the receiving waters. The effluent discharge was clear and flow was continuous. The receiving waters looked clear with no visible changes from the effluent discharge 5 1 P a g e 9. Pretreatment: This facility currently has no prerreatment permit and does not accept or discharge domestic or industrial waste to a sanitary sewer system. Pre-treatment permits are required, if applicable, by your NPDES Discharge Permit. 10. Solids Handling/Disposal: The facility must dispose of solids by an acceptable method such as a landfill or utilize the services of an approved solids hauling and disposal contractor, which requires the facility to be included under the contractor's non -discharge permit (i.e. land application). The facility is reminded to maintain adequate records (i.e. shipment dates, quantities, etc.) of any solids hauling and/or disposal activities. The facility utilizes the Roxboro Steam Electric Plant Industrial Waste Landfill permitted by NC Division of Waste Management SWP#73-02. The facility was in compliance with these requirements the day of the inspection. 12. Compliance Sampling: No compliance sampling was conducted the day of this inspection. 13. Operations & Maintenance: The facility was in compliance with these requirements the da y of the inspection 1) A recommendation was made to tighten well caps. 2) A recommendation was made to forward an Amended DMR for June 2014. 3) A recommendation was made to evaluate and consider the useful lie of the aging 1984 Domestic Wastewater Treatment package plant and ability to maintain dated parts/structure into the future. The environmental risk would be an 1) un -anticipated bypass of untreated/partially treated wastewater to the immediate plant area 2) the cost of a pump and haul solution in the event ofplant failure, as the packagge plant is one trane/no back-up. -- - -- --- --- - - 61Page - - United States Environmental Protection Agency Form Approved EPA Washington, D C 20460 OMB No 2040-0057 Water Compliance Inspection Report Approval expires B-31-98 Section A National Data System Coding (i e , PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IA1 ' 2 15 1 3 I NC0003425 111 121 14/11/19 117 18 LCJ 19 I � I 201 211 11111 11111111111 1111111 1111111 1111111/1 I1 X66 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 67 70 I J _ 71 I 72 731 751 I 180 l-II I I I I Section B Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES Permit Number) 09 30AM 14/11/19 09/07/01 Roxboro Steam Electric Power Plant Person County Rd 1377 Exit Time/Date Permit Expiration Date Roxboro NC 27573 12 45PM 14/11/19 12/03/31 Name(s) of Onsite Representabve(s)/Tibes(s)/Phone and Fax Number(s) Other Facility Data /// Eric Daniel Satterwhite/ORC/336-597-6270/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Mike Mosley, 1700 Dunnaway Rd Semora NC 27343/// No Section C Areas Evaluated During Inspection (Check only those areas evaluated) Permit E Flow Measurement Operations & Maintenance Records/Reports Self -Monitoring Program Sludge Handling Disposal Facility Site Review Compliance Schedules Effluent/Receiving Waters Laboratory Section D Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Eric S Rice RRO WQH919-791-4200/ 12—/ Autumn H Romanski RRO WQH919-791-4247/ (`(` 1i Si natur of Managemen A R view �gency/Office/ ne and Fax um Date �-'a , , EPA Form 35 -3 (Rev 9-94) Previous editions are o solete Page# NPDES yr/mo/day Inspection Type 31 NC0003425 I11 12 14/11/19 i7 18 ICI Section D Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) The permittee was compliant with teh permit requirements reviewed the day of this Inspection Recommendations Included 1)Tlghten well caps 2)Amend June 2013 DMR 3)Evaluate useful life of the 1984 Domestic Wastewater Treatment Package Plant Page# Permit. NC0003425 Owner - Facility. Roxboro Steam Electric Power Plant Inspection Date. 11/19/2014 Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less) Has the permittee submitted anew E ❑ ❑ ❑ application? 0 ❑ ❑ ❑ Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ ❑ N ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment. The permit expired March 31, 2012. The permittee has submitted the permit renewal application dated October 5 2011 and has recently submitted an update to that permit renewal application The new permit has vet to be re -Issued by the Division of Water Resources, therefore expired permit will remain the active permit until a new permit is issued Compliance Schedules Yes No NA NE Is there a compliance schedule for this facility? ❑ ❑ 0 ❑ Is the facility compliant with the permit and conditions for the review period? ❑ ❑ N ❑ Comment: Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex MLSS, MCRT, Settleable 0 ❑ ❑ ❑ Solids, pH, D0, Sludge Judge, and other that are applicable? Comment, Recommendations were made to evaluate and consider the useful life of the aging 1984 domestic wastewater treatment plant. NPDES Internal Outfall 008 The environmental risk would be an 1)un-anticipated bypass of untreated/partially treated wastewater to the Immediate plant area 2) the cost of a Dump and haul solution in the event of plant failure, as the Dackage plant is one trane/no back-uD. The permittee has consistently met effluent limits at Outfall 008, but the package plant Is 30 years old The permittee reported structural inspection and repairs were completed In 2011-2012 Please routinely ensure that the high level alarms are working (audible and visual) and that all drains to surface waters in the area (If applicable) can be sealed in the event of a bypass Flow Measurement - Influent Yes No NA NE # Is flow meter used for reporting? E ❑ ❑ ❑ Is flow meter calibrated annually? 0 ❑ ❑ ❑ Is the flow meter operational? E ❑ 117 (If units are separated) Does the chart recorder match the flow meter? ❑ ❑ ❑ N Comment- Flow is measured at the intake pumps as required by the permit Page# 3 Permit: NC0003425 Inspection Date: 11/19/2014 Chemical Feed Is containment adequate? Is storage adequate? Are backup pumps available? Is the site free of excessive leaking? Comment: Sequencing Batch Reactors Type of operation Owner - Facility Roxboro Steam Electric Power Plant Inspection Type. Compliance Evaluation Yes No NA NE ❑ ❑ ❑ M ❑ ❑ ❑ M ❑ ❑ ❑ M ❑ ❑ ❑ M Yes No NA NE Is the reactor effluent free of solids? ❑ ❑ 0 ❑ Does minimum fill time correspond to the peak hour flow rate of the facility? ❑ ❑ 0 ❑ Is aeration and mixing cycled on and off during fill? ❑ ❑ M ❑ The operator understands and can explain the process? M ❑ ❑ ❑ Comment, The Bioreactor Treatment for the FGD wastewater was operational the day of the site visit and the NPDES Discharge Outfal 010 which discharges below the surface of the ash pond discharge canal was observed clear, with a low sulfide odor present A Sodium Bisulfite treatment is on-site for addition at the bioreactor inlet as needed DWR has received notification of trials for this addition, and the information on this treatment was submitted in the recent permit renewal application update Lagoons Type of lagoons? # Number of lagoons in operation at time of visit'? Are lagoons operated in? # Is a re -circulation line present? Is lagoon free of excessive floating materials? # Are baffles between ponds or effluent baffles adjustable'? Are dike slopes clear of woody vegetation? Are weeds controlled around the edge of the lagoon? Are dikes free of seepage? Are dikes free of erosion? Are dikes free of burrowing animals? # Has the sludge blanket In the lagoon (s) been measured periodically In multiple locations? # If excessive algae is present, has barley straw been used to help control the growth? Is the lagoon surface free of weeds? Yes No NA NE 5 ❑ ❑ ■ ❑ ❑ ❑ ❑ M ❑ ❑ ■ ❑ ❑ ❑ ❑ M ❑ ❑ ❑ ■ ❑ ❑ ❑ M ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ■ ❑ ❑ ❑ M ❑ Page# 4 Permit NC0003425 Inspection Date: 11/19/2014 Lagoons Owner - Facility: Roxboro Steam Electric Power Plant Inspection Type: Compliance Evaluation Yes No NA NE Is the lagoon free of short circuiting ❑ ❑ ❑ 0 Comment, The facility has the following settling pond treatment units associated with NPDES outfalls. 1 Ash Pond - Outfall 002 2 FGD Settlings ponds (East and West)- Outfall 010 1 FGD Backwash Pond - Can be recirculated/flow to FGD Settling Ponds - Outfall 010 1 Coal Pile Runoff Settlinq Pond - Outfall 006 Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting? ❑ ❑ 0 ❑ Is flow meter calibrated annually'? ❑ ❑ M ❑ Is the flow meter operational? ❑ ❑ 0 ❑ (If units are separated) Does the chart recorder match the flow meter? ❑ ❑ 0 ❑ Comment. The Final NPDES Outfall 003 effluent flow Is reported from the influent flow readings (assumes all water taken in is discharged) A flow meter is located at the internal Outfall 002 prior to mixing with the heated water (non -contact cooling water) discharge The Final Outfall 003 receives flow from multiple wastewater/stormwater discharges Effluent Pine Yes No NA NE Is right of way to the outfall properly maintained? M ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? M ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ 0 ❑ Comment: Effluent Sampling Is composite sampling flow proportional Is sample collected below all treatment units? Is proper volume collected? Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6 0 degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type representative)? Yes No NA NE ❑ ❑ ❑ M ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ M ❑ ❑ ❑ ■ Comment: No composite sampling is required by the permit, except for Acute Toxicity measured quarterly Grab sampling is completed as required by the permit Page# 5 Permit NC0003425 Inspection Date: 11/19/2014 Upstream / Downstream Sampling Owner - Facility: Roxboro Steam Electric Power Plant Inspection Type. Compliance Evaluation Is the facility sampling performed as required by the permit (frequency, sampling type, and sampling location)? Comment* Record Keeping Are records kept and maintained as required by the permit'? Is all required Information readily available, complete and current? Are all records maintained for 3 years (lab reg required 5 years)? Are analytical results consistent with data reported on DMRs'7 Is the chain -of -custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete do they Include all permit parameters? Has the facility submitted its annual compliance report to users and DWQ? (If the facility Is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? Yes No NA NE ■ ❑ ❑ ❑ Yes No NA NE M ❑ ❑ ❑ M ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ 000 Is a copy of the current NPDES permit available on site? M ■ ❑ ❑ ❑ ❑ ❑ ❑ 0 Comment* An amended DMR for June 2014 was requested for a flow recording for June 3 to be added to the DMR. A flow reading was provided for June 2, but the Blms System flagged a Page# 6 frequency violation because no reading was entered within a 7 -day running period The entry for Flow/NoFlow as applicable for June 3 will resolve the frequency violation. ■ ❑ ❑ ❑ ❑ ❑ ❑ ■ M ❑ ❑ ❑ Is the ORC visitation log available and current? M ❑ ❑ ❑ Is the ORC certified at grade equal to or higher tha-i the facility classification? M ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification? 0 ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? M ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ❑ ❑ ❑ 0 Comment* An amended DMR for June 2014 was requested for a flow recording for June 3 to be added to the DMR. A flow reading was provided for June 2, but the Blms System flagged a Page# 6 frequency violation because no reading was entered within a 7 -day running period The entry for Flow/NoFlow as applicable for June 3 will resolve the frequency violation. Laboratory Yes No NA NE Are field parameters performed by certified personrel or laboratory? i ❑ ❑ ❑ Are all other parameters(excluding field parameters) performed by a certified lab? M ❑ ❑ ❑ # Is the facility using a contract lab? M ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6 0 degrees ❑ ❑ ❑ 0 Celsius)? Page# 6 Permit NC0003425 Owner - Facility. Roxboro Steam Electnc Power Plant Inspection Date, 11/19/2014 Inspection Type: Compliance Evaluation Laboratory Yes No NA NE Incubator (Fecal Coliform) set to 44 5 degrees Celsius+/- 0 2 degrees? ❑ ❑ E ❑ Incubator (BOD) set to 20 0 degrees Celsius +/- 1 0 degrees? ❑ ❑ 0 ❑ Comment. The permittee is currentiv in comDliance with Field Lab requirements (NC DWR Certfcation #5080) and utilizes Pace NC Certfied Labs (different analytes are sent to different Pace Lab locations Pump Station - Influent Yes No NA NE Is the pump wet well free of bypass lines or structures? ❑ ❑ ❑ N Is the wet well free of excessive grease? ❑ ❑ ❑ N Are all pumps present? E ❑ ❑ ❑ Are all pumps operable? 0 ❑ ❑ ❑ Are float controls operable? N ❑ ❑ ❑ Is SCADA telemetry available and operational? ❑ ❑ E ❑ Is audible and visual alarm available and operational? 0 ❑ ❑ ❑ Comment, The alarm was tested at the domestic wastewater package plant Please ensure the alarm is tested routinely Bar Screens Type of bar screen Yes No NA NE a Manual Yes No NA NE Is the basin aerated? ❑ ❑ b Mechanical ❑ Is the basin free of bypass lines or structures to the natural environment? ❑ ❑ Are the bars adequately screening debris? E ❑ ❑ ❑ Is the screen free of excessive debris? E ❑ ❑ ❑ Is disposal of screening in compliance? E ❑ ❑ ❑ Is the unit in good condition? E ❑ ❑ ❑ Comment Grinder pumps were being used at the inlet to the domestic wastewater package plant Debris is screened and removed as needed Equalization Basins Yes No NA NE Is the basin aerated? ❑ ❑ E ❑ Is the basin free of bypass lines or structures to the natural environment? ❑ ❑ 0 ❑ Is the basin free of excessive grease? ❑ ❑ 0 ❑ Are all pumps present? ❑ ❑ 0 ❑ Are all pumps operable? ❑ ❑ E ❑ Are float controls operable? ❑ ❑ E ❑ Page# 7 Permit. NC0003425 Inspection Date: 11/19/2014 Equalization Basins Owner - Facility: Roxboro Steam Electric Power Plant Inspection Type: Compliance Evaluation Yes No NA NE Are audible and visual alarms operable? ❑ ❑ E ❑ # Is basin size/volume adequate? ❑ ❑ E ❑ Comment: Ecluallzation occurs at the Influent well at the front of the package plant It appeared that the alarm system was connected at the effluent well, there also may have been an alarm for the Influent well. but I did not comment on this In my field notes The audible alarm worked, but it was unclear at what Interval routine testing of the alarm(s) is completed. Secondary Clarifier Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids In center well of circular clarifier? Are weirs level? Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is scum removal adequate? Is the site free of excessive floating sludge? Is the drive unit operational? Is the return rate acceptable (low turbulence)? Is the overflow clear of excessive solids/pin floc? Is the sludge blanket level acceptable? (Approximately % of the sidewall depth) Yes No NA NE ■ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ E ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ N ■ ❑ ❑ ❑ ❑ ❑ ❑ N ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Comment. The package plant combines treatment into one compartmentalized unit with a catwalk across the center of the unit The secondary clarifier follows in series after equalization/aeration and observation of compartment components is limited during operations Airlift pumps are used for return activated sludge Aeration Basins Yes No NA NE Mode of operation Ext Air Type of aeration system Diffused Is the basin free of dead spots? ❑ N ❑ ❑ Are surface aerators and mixers operational? ❑ ❑ N ❑ Are the diffusers operational? ❑ ❑ E ❑ Is the foam the proper color for the treatment process? ❑ ❑ ❑ Does the foam cover less than 25% of the basin's surface? ❑ ❑ ❑ Is the DO level acceptable? ❑ ❑ ❑ 0 Is the DO level acceptable?(1 0 to 3 0 mg/1) ❑ ❑ ❑ E Page# a Permit NC0003425 Owner - Facility: Roxboro Steam Electric Power Plant Inspection Date: 11/19/2014 Inspection Type: Compliance Evaluation Aeration Basins Yes No NA NE Comment: Aeration is by air lift pumps in continous operation. Airlift pumps are also used for recircluation as needed. Disinfection -Tablet Are tablet chlorinators operational? Are the tablets the proper size and type? Number of tubes in use? Is the level of chlorine residual acceptable? Is the contact chamber free of growth, or sludge buildup? Is there chlorine residual prior to de -chlorination? Yes No NA NE M ❑ ❑ ❑ ❑ ❑ ❑ 1 • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ■ ❑ Comment: Chlorine tablets were in use as required No dechlorination is reouired by the permit. Page# 9