Loading...
HomeMy WebLinkAboutNC0003425_Compliance Sampling Inspection_20160505Water Resources ENVIRONMENTAL QUALITY May 5, 2016 Mr. William Thacker Duke Energy Progress Roxboro Steam Electric Plant 1700 Dunnaway Rd Roxboro, NC 27343 PAT MCCRORY Govemor DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Director MAY _ 9 2016 1tj'�014,IRAT1Ui P4QC�S�I,VG UNIT NPDES Compliance Sampling Inspection NPDES Wastewater Discharge Permit No. NC00_034_25- Person County Dear Mr. Thacker: On March 1, 2016, Autumn Romanski and Cheng Zhang of the Raleigh Regional Office conducted a Compliance Sampling Inspection at the Roxboro Steam Electric Plant. The effluent sampling results were sent to the Division of Water Resources Laboratory and qualified lab results were received on April 18, 2016, which extended the inspection completion date noted on the EPA Inspection Report. We greatly appreciated the cooperation and assistance provided by Mr. Shannon Langley, Mr. Robert Howard, and Plant Staff to complete the inspection and sampling. The facility and the sampling results were in compliance with the permit requirements reviewed the day of this inspection. No response to this inspection is required. The complete compliance inspection report is attached. The following is a list of the site observations. 1. The Wastewater Discharge Treatments are classified as a Class PC- 1 Wastewater Plant. Your NPDES Individual Wastewater permit became effective July 1, 2009 and expired on December 31, 2012. 2. The Primary ORC is Eric Satterwhite, a PC -1 (certification number #985810) NC Certified Operator. There are several backup operators, all hold a PC -1 operator certification. The ORC logbook, lab results, chain of custody forms, and DMR's were readily available and in good order for review. The DMR month of December 2015 was reviewed with no discrepancies found. The staff should be commended as the facility has had no Notice of Deficiency or Violation issued in the last 12 months, and no Civil Penalty assessments. State of North Carolina I Environmental Quality I Water Resources 1628 Mail Service Center I Raleigh, North Carolina 27609-1628 919 7914200 3. The sampling techniques, CST Checklist, and a brief lab inspection checklist was completed. The facility was compliant with the checklist requirements reviewed over the days of this sampling inspection. The checklists are attached. 4. The Roxboro Plant holds NC Field Parameter Certification #5080 for pH and Temperature. The Roxboro Plant also used NC Certified Lab Pace Analytical through 2015. 5. The DWR conducted grab and composite effluent sampling at NPDES Effluent Outfall 003 and grab sampling at NPDES Effluent Outfall 006 over the days of the site visit. The DWR Lab results are listed below: Recent Average Flow reported in February 2016 for outfall 003 was 456.5 MGD and 0.79 MGD for outfall 006. Flow at both outfalls observed the days of the inspection were clear and free of solids The DWR Lab analyte results are attached to this inspection report and summarized in the tables below. Outfall 003 Analyte Result TSS Undetected at 6.2 mg/1 Arsenic Undetected at 2.0 ug/L NH3 as N 0 02 mg/L NO2 + NO3 as N 0.23 mg/L Total Phosphorus 0.05 mg/L Total Kjeldahl N as N 0 18 mg/L Outfall 006 Analyte Result TSS 1.8 mg/L There are currently no limits in the NPDES permit at Outfall 003 except in the case of chlorine addition in which a TRC limit of 200 ug/L is in effect. There are internal outfall limits for Oil and Grease and TSS at Outfall 002, but outfall 002 and other internal outfalls were not sampled as part of this inspection. The results showed the facility was in compliance with the NPDES permit TSS limit of 50 mg/L at Outfall 006. The Toxicity test results were forwarded in a separate letter and were Passes. 21 Page If you have questions, please contact Autumn Romanski at 919-791-4255 c Autumn.Romanski@ncdenr.gov. incerel , Danny Smith Raleigh Regional Operations Supervisor Cc: Enclosures RRO-WQROS DWR- Central Files via e-mail at Ec: shannon.langleygduke-energy.com; robert.howard@duke-energy.com 3 1 P a g e United States Environmental Protection Agency Fort Approved EPA Washington, D C 20460 OMB No 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A National Data System Coding (i e, PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 2 15 I 3 I N00003425 111 12 16/04/18 17 181 o 1 19 L G I 201 I =1 211'-1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 1 11 1 1 1 1 166 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 72 LJ 73 I74 7511 I I I I 80 67 70LJ 71 itJ Section B Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 09 30AM 16/04/18 09/07/01 Roxboro Steam Electric Power Plant Exit Time/Date Permit Expiration Date 1700 Dunnaway Rd Semora NC 27343 03 20PM 16/04/18 12/03/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data /// Ronald D Easley/ORC/336-597-7332/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted William J Thacker, 1700 Dunnaway Rd Semora NC 27343/Plant Manager/336-597-6101/ No Section C Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenance N Records/Reports Self-Monitonng Program Sludge Handling Disposal Effluent/Receiving Waters Section D Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Cheng Zhang ��� .� _ RRO WQH919-791-4200/ ! Autumn H Romanskt % � RRO WQ//919-791-4247/ S gnatu of Management Reviewer Agency/Office/Phone and Fax Numbers Date/ zz;�� /e� EPA Form 356 (Rev 9-94) Previous editions are obsolete ✓ Page# NPDES yr/mo/day Inspection Type 31 NC0003425 I11 12 16/04/19 17 18 S I Section D Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) The permittee was In compliance with the requirements reviewed and the Compliance Sampling Inspection Checklist completed over the days of this Inspection Page# Permit: NC0003425 Owner - Facility: Roxboro Steam Electric Power Plant Inspection Date: 04/18/2016 Inspection Type: Compliance Sampling Permit Yes No NA NE (If the present permit expires In 6 months or less) Has the permittee submitted a new ❑ ❑ ❑ application? Is the facility as described In the permit? M ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ ❑ ❑ ❑ Is access to the plant site restricted to the general public? ❑ ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? N ❑ ❑ ❑ Comment The current NPDES Wastewater Discahrae permit became effective July 1, 2009 and Comment- The final NPDES outfall 003 effluent flow is reported from the influent flow readings expired on March 31, 2012 (assumes all water taken In is discharged) The facility was compliant with teh NPDES permit wastewater reauirements reviewed the day of the inspection The application for permit renewal was received on October 10. 2011 as required An update to the application has also been submitted. The new permit has not been issued vet, therefore, this inspection was conducted based on NPDES wastewater discharge permit issued July 1, 2009 as these requirements remain in effect until the new ermit is Issued. Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? N ❑ ❑ ❑ Does the facility analyze process control parameters, for ex MLSS, MCRT, Settleable ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: The facility does analyze process control parameters Operations and maintenance are ongoing with proactive maintenance and operational planning evident The facility has moved forward since the last NPDES inspection with useful life evaluation of the 1984 Domestic WWTP Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting? ❑ ❑ 0 ❑ Is flow meter calibrated annually? ❑ ❑ 0 ❑ Is the flow meter operational? ❑ ❑ N ❑ (If units are separated) Does the chart recorder match the flow meter? ❑ ❑ N ❑ Comment- The final NPDES outfall 003 effluent flow is reported from the influent flow readings (assumes all water taken In is discharged) A flow meter is located at internal outfall 002 prior to mixing with the heated water discharge. The final Outfall 003 receives flow from multiple wastewater and stormwater discharges Effluent Samplina Yes No NA NE Is composite sampling flow proportional? ❑ ❑ ❑ Is sample collected below all treatment units? ❑ ❑ ❑ Page# 3 Permit: NC0003425 Owner - Facility Roxboro Steam Electric Power Plant Inspection Date- 04/18/2016 Inspection Type Compliance Sampling Yes No NA NE Is the basin aerated? Effluent Sampling Yes No NA NE Is proper volume collected? M ❑ ❑ ❑ Is the tubing clean? M ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6 0 degrees 0 ❑ ❑ ❑ Celsius)? ❑ Are all pumps operable? ❑ ❑ Is the facility sampling performed as required by the permit (frequency, sampling type M ❑ ❑ ❑ representative)? ❑ Are audible and visual alarms operable? ❑ ❑ Comment No composite sampling is required by the permit except toxicity A toxicity sample was collected on 3/1 and 3/3 along with grab samples collected as part of a Compliance Sampling Inspection on on 3/1 The sampling results are included with this reportThe toxicity result was a Pass at both outfalls and the results were reported in a separate letter The location of the composite sampler is on the pier located by Outfall 003 The outfall outlet is large with flow, current and turbulance Logistically, it is not Dossible to place a composite sampler and tubing set up in the effluent stream so the sampler is placed on the Pier to the far right of the effluent stream( in the Lake) Grab samples are also collected from the pier - due to safety concerns - the pier is logistically safer for personnel and access by boat would be needed to sample the main effluent stream at outfall 003 Egualization Basins Yes No NA NE Is the basin aerated? ❑ ❑ M ❑ Is the basin free of bypass Imes or structures to the natural environment? ❑ ❑ M ❑ Is the basin free of excessive grease? ❑ ❑ M ❑ Are all pumps present? ❑ ❑ M ❑ Are all pumps operable? ❑ ❑ 0 ❑ Are float controls operable? ❑ ❑ M ❑ Are audible and visual alarms operable? ❑ ❑ ❑ # Is basin size/volume adequate? ❑ ❑ M ❑ Comment The FGD West and East Basin water levels and the hinrpartnr hnrkwnQh hair, %mora Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? ❑ ❑ ❑ Is all required information readily available, complete and current? ❑ ❑ ❑ Are all records maintained for 3 years (lab reg required 5 years)? ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? M ❑ ❑ ❑ Is the chain -of -custody complete? ❑ ❑ ❑ Dates, times and location of sampling j Name of individual performing the sampling Page# 4 Permit. NC0003425 Inspection Date: 04/18/2016 Record Keening Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete do they Include all permit parameters? Owner - Facility Roxboro Steam Electric Power Plant Inspection Type: Compliance Sampling Has the facility submitted Its annual compliance report to users and DWQ? (If the facility Is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? Is the ORC visitation log available and current? Is the ORC certified at grade equal to or higher than the facility classification? Is the backup operator certified at one grade less or greater than the facility classification? Is a copy of the current NPDES permit available on site? Facility has copy of previous year's Annual Report on file for review? Yes No NA NE ❑ ❑ ❑ M ❑ ❑ ❑ ■ ❑ ❑ ❑ M ❑ ❑ ❑ M ❑ ❑ ❑ M ❑ ❑ ❑ ❑ ❑ ■ ❑ Comment The facility holds field parameter certification for Temperature and PH. It was explained that the facility has an inline temperature reading at the final outfall 003. A temperature is ran In the lab when composite samples for toxicity are collected. Both temperature meaurements were checked against an NIST thermometer - records indicated, the last check was done 12/10/2015 Page# 5