HomeMy WebLinkAbout20171073 Ver 1_3.1 SA Corps comments June 27, 2017-RESPONSE_20170825Corps comments June 27, 2017 1. Please provide a clear overall drawing of the project. The Grading and Utility plans show the overall development; however, these are not sufficient for the purpose of reviewing project impacts as they relate to the entire development. The new drawing should include all aquatic resources and their boundaries, the location, type, and amount of each impact, stormwater facilities and intakes/discharge outlets, all subdivision amenities (sidewalks, walking trails, community buildings, and recreation or open space areas), clear project boundary, easements, and lot lines, correctly numbered lots, etc. Unnecessary data layers, such as contour lines, that may hinder the ability to see pertinent information should be removed. Please show the utility line in color for easier review. Ensure all drawings are legible in either 8.5 x 11" or 11 x 17" format. See the attached drawings 2. In accordance with Regional Condition 4.1.7 of NWP 29, utility lines must comply with the terms and conditions, including Regional Conditions, of NWP 12. To address Regional Condition 4. 1.1 of NWP 12, please provide a brief discussion as to why horizontal directional drilling is not being used as a method to avoid impacts to wetlands and waters of the US. Wetland W2 (WT) Directional drilling was evaluated for the crossing of the proposed 8 -inch diameter water line pipe of Wetland WT near Neills Creek. An evaluation of the water line route survey profile, and subsequent field of evaluation to verify existing conditions was performed to gather information related to the potential to directional drill. The assessment yielded field topographical constraints that would require an approximately 250 foot long directional drill length to go under Wetland WT. At a unit rate of $175/1inear foot, the cost to directional drill Wetland WT is $43,750. The project cost for installation of 8 -inch waterline using open cut is $17/LF or $4,250 (250 linear feet). Based on project budget constraints, and that directional drilling this location would be more than 10 times the open cut cost, the open cut methodology was selected. Wetland WI (WSO Directional drilling was evaluated for the crossing of the proposed 8 -inch diameter water line pipe and Wetland WS which is located on either side of the power transmission line easement crossing. An evaluation of the water line route survey profile, and subsequent field of evaluation to verify existing conditions was performed to gather information related to the potential to directional drill. The assessment yielded field constraints including the required avoidance of major power transmission line towers and guy wires that would necessitate an approximately 400 foot long directional drill length to go under Wetland WS. At a unit rate of $175/1inear foot, the cost to directional drill Wetland WS is $70,000. The project cost for open cut installation of 8 -inch waterline is $17/LF or $6,800 over the estimated 400 linear feet. Based on project budget constraints, and that directional drilling this location would be more than 10 times the open cut cost, the open cut methodology was selected. 3. Please provide a brief discussion addressing the need for this type of project for this area. Additionally, the applicant must address indirect adverse environmental effects of the proposed impacts on local resources and the watershed. Project Need The area around the project is growing and a need for single family homes is increasing. The Southern Acres subdivision will fill part of that need. Corps comments June 27, 2017 Indirect Adverse Environmental Effects The indirect environmental effects of this project are increased site runoff and pollutions resulting from residential land use. Watershed Beyond the project, other increases in density will add additional pressure to provide services requiring additional development of infrastructure such as roads, restaurants, and retail stores. The size of this development, while not small, will not be large enough to require additional development by itself, but may add to the pressure to provide these services in the future. Many of these additional services may result in cumulative impacts to the watershed that could adversely impact water quality. Impacts in this project were minimized by reducing impacts that includes use of headwall at stream crossing to reduce impacts, avoiding wetland impacts directly within the subdivision design, limiting impervious surface area, and removal of an existing crossing. 4. Please provide an approximate total in acres/linear feet of aquatic resources avoided by the use of headwalls and retaining walls. The road crossing (SI) is for a 50' paved roadway with curb and gutter with a S' sidewalk (see attachments Sl and cross section of stream crossing drawing). The use of headwall at SI reduced impacts from the road culvert from 98 LF to 75 IF while retaining necessary roadway width and sidewalk. The 35 IF of rip -rap diffuser meets the calculated need to dissipate erosive forces based on slope and watershed. Total impact was reduced from 133 IF to 110 IF due to the use of headwalls at this crossing. 5. Please provide a discussion regarding the continued viability of the 0.296 -acre wetland within the "Open Space Nature Preserve" once the hydrology source from the relatively permanent water, which discharges into this wetland, is entirely removed as proposed. Please note that the Corps may require monitoring of this wetland to ensure secondary adverse impacts are not occurring over time due to the removal of hydrology. A design modification has been added to provide drainage from the post -construction watershed to this wetland. The preconstruction watershed was calculated to be 12.3 acres. The post -construction watershed is estimated to be 8.2 acres. Impervious surface will be less than 24 percent. Stormwater runoff is collected along through the street culvert system and discharged into the Open Space lot into a Swale with a diffuser pad above the wetland. The watershed will include approximately 75 percent of the original area with under 24 percent impervious area. Much of the surface drainage will be divert through culverts, but surface flows from the adjacent lots will drain directly to the wetland. No attempt will be made to reduce localized groundwater seepage. This design should provide adequate hydrology to maintain this wetland in addition to providing opportunityfor functional treatment of runoff. 6. Please further discuss the removal of the existing 42" HDPE as it relates to avoidance and minimization of project impacts and identify the location of the restoration work. The existing 34.14 IF of 42"HDPE used as a farm crossing will be removed and banks graded to a stable grade. Native grasses will be planted to provide long-term stabilization. Grade control will only be used if streambed stabilization is needed. All stream work will be done in the dry. N Corps comments June 27, 2017 7. For the purpose of coordinating for the Northern long-eared bat, please provide the following information: a. Will the proposed project require tree cutting/removal at the proposed impact locations? If so, please provide either an estimated number of trees or the area of cutting/removal in acreage. Within the Southern Acres development, the site is absent of trees due to past agricultural use. The waterline extension traverse areas of forested land and will result in a minimal number of trees cut to install the waterline and maintain access. The project will cut up to 0.162 acres of forest as a result of the waterline extension for this project. Temporary forest removal= 0.081 Permanent forest removal= 0.081 Total forest removal= 0.162 b. Will the project require blasting at the proposed impact locations? No blasting for construction of this project are anticipated. With the wetland crossing locations for the water line, they are outside areas needed for vehicular traffic or future construction. compaction equipment will not be utilized or required. c. Will there be other percussive activities conducted by machines, such as jackhammers or mechanized pile drivers? Jackhammers and mechanized pile drivers are not expected to be used for construction of this project. Compaction of the roadbed is necessary and standard roller compaction equipment for the construction will be utilized. 3 1 200 p I � Y q'J �� T, Flrc Hjtlrmt � aj a I I°ae I t2 S a ro I Garry Edwards and p v I I N I if. Cathy Edwards o "� ., m I I Deed Book 1844, Page 512 j °° II P. C. F. Slide 597-8 �I I I I 4x Ex.50' Access I I -_--_nd Utility Easement I 1 I 'T" —__— -------- Douglas F. Miller Debra B. Miller Deed Book 3170, Page 278 I; © O Map Number 2013-264 I ii I ® O I; III a� a I� Douglas F. Miller Debra B. Mil/er Deed Book 3119, Page 126 WY Map Number 2013-163 flit I 15 16 o I i• - 18 nig Douglas F. Miller Debra B. Miller Deed Book 3170, Page 278 ly \ Map Number 2013-264 - s5 \ \ ;III 9�� 30' Creek Buffer me _ ;, from Top of Bank = T \ _ I — DeedNed A. vpJh,yws and — _ 6 O I it III Sooks1806, otthews Emen 61 I ® I 35 Plat Cabinet F^ Page 667 �, — \� 1 - ' --- — Sllde 346 ------ - 0 X0 0 0z I I I z z w o h I O II 'I i 60 I © © I I 11 s6 I r > In �z I I II I DoHd %ath Faster and wife Ann H. ® 31 1 m a w F w ii PERMANENT • 01 i ---' *--------___ _ 4 STORM CROSSING 45 C PERMANENT STREAM IMPACT S1 ® i O (SEE SHEET S-2) ® \ ( \ o¢ -VK t: 3 F •1 `\ o v�mi 0��rnrc n w,xc s 1 l�,-30' Creek Buffe Q o ®/ z �u d o�� 8 O / _1------ 000 X00 / I v / 1 0 100 200 400 800 \ \0 g\ I Plot Cabinet F' Slide 36-A Plat Cabinet F' Slide ,257-C ' Plat Cabinet F"� Slide 1457-C / I Plat Cabinet F' Slide P15 -C I I ( I1y FEET ) I inch = 200 ft. E o :I !I ------------------------------ o > r a 8 1z - �--� Wad - ;III 9�� 30' Creek Buffer me _ ;, from Top of Bank = T \ _ I — DeedNed A. vpJh,yws and — _ 6 O I it III Sooks1806, otthews Emen 61 I ® I 35 Plat Cabinet F^ Page 667 �, — \� 1 - ' --- — Sllde 346 ------ - 0 X0 0 0z I I I z z w o h I O II 'I i 60 I © © I I 11 s6 I r > In �z I I II I DoHd %ath Faster and wife Ann H. ® 31 1 m a w F w ii PERMANENT • 01 i ---' *--------___ _ 4 STORM CROSSING 45 C PERMANENT STREAM IMPACT S1 ® i O (SEE SHEET S-2) �gl 1 ek Buffer measured j l A 1 from Top of Bank`_ 1 O (n each side of creek 'r / �i / EE PROJECT: 4350 S-1 OF 4 ® \ ( \ o¢ -VK t: 3 F •1 `\ o v�mi 0��rnrc n pCALL, '� � / � LR �P ft , o�� 8 O / I ,1 000 X00 / I / Kennis Creek Subdivi ion Plat Cabinet "C", Slide 43-A 0 100 200 400 800 \ \0 g\ I Plot Cabinet F' Slide 36-A Plat Cabinet F' Slide ,257-C ' Plat Cabinet F"� Slide 1457-C / I Plat Cabinet F' Slide P15 -C I I ( I1y FEET ) I inch = 200 ft. �gl 1 ek Buffer measured j l A 1 from Top of Bank`_ 1 O (n each side of creek 'r / �i / EE PROJECT: 4350 S-1 OF 4 ® \ ( \ o¢ -VK t: 3 F •1 `\ o v�mi 0��rnrc n e� E ------------------------------ rTl o E �gl 1 ek Buffer measured j l A 1 from Top of Bank`_ 1 O (n each side of creek 'r / �i / EE PROJECT: 4350 S-1 OF 4 NOTE: FOR ANY RIP -RAP TO BE PLACED IN THE STREAM BED - THE FINISHED TOP ELEVATION OF THE RIP -RAP SHOULD NOT EXCEED THAT OF THE ORIGINAL STREAM BED NOTE: TEMPORARY FILLS MUST BE REMOVED IN THEIR ENTIRETY AND THE AFFECTED AREAS RETURNED TO PRE -CONSTRUCTION ELEVATIONS. THE AREAS AFFECTED BY TEMPORARY FILLS MUST BE RE -VEGETATED, AS APPROPRIATE. ® PERMANENT IMPACTS (S1) GRAPHIC SCALE 30 0 15 30 60 ( II\ FEET ) I inch — 30 ft. 120 EEPROJECT: 4350 S-2 OP 4 SWALE CALCULATION TABLE LOT # 01O(CFS) SWALE SLOPE n NORVAL DEPTH (FT) VELOCITY SHEAR STRESS (FT/S) REQUIRED (PSF) SWALE TYPE SHEAR STRESS PROVIDED (PSF) OS 23.6 1.5% 0.03 0.94 3.7 0.88 A 1.45 � vv� "STRAW W/NET" TEMP. LINER AS SHOWN - - -- ..ly 3 4' SEE PER PERMANENT SWALE "A" PROJECT NTS SPECS 5� 60 r� MPACT AREA 01 CB28-1 1 1 I CB35 _ tCB4 CB26 (28 CB24 Co - 55 01(-575e4LF) zo CB37 _ CB36 CB2 4 g �Xx 4(S �Q N 4� PERMANENT PACTS (01) 46 V / I C) GR�PHIC SCALE s a ,sz � 50 0 25 /50 100 200 ( II\ TEST ) 1 inch = 50 ft. a a =U U ZZ jn � Z z� v ¢ U m1 = a K w J cwi U N w o a g' - n zo W U - E O ~+ o O Q E ee rkc.ia;T 4350 S -3 OF 4 \ \ \ \ \ \ EX. 15�" INV\ \\- -' ug/bg r. m =276.0;EXI:5�"!V \De a B� Miller. ed ook\\31199,3- 13 L12 \ \ \ \ \,, I .13 M�p�uML x \ 1 r \\ \\ \ \ a �z \ 6\ \ zzri w _ z z -dam 1Dq /POST—CONSTRUCTION DRAINAGE AREA \ \ \ \ o D73 72 / \ \ \ \\ \ \ \ F247— / \ 8 1 \ \ wa zea u9Y� LL �w 4aw v PRE—CONSTRUCTION DRAINAGE AREA \ \� 6— 6 81 \ \ /'the wife Anfesa and / — / 3,o Beed Book Matthews &A—GE_cE fas ME EM— I \ \ \\\ / \ %'�t �a�e t ,F,06, Page 67 \ ( 300 2 5\ \ \ \\ -- / \ Slide 346-A 1 ��\\ AREA FLOWING TO OPEN SPACE WETLANDS F.-rz PRE—CONSTRUCTIONDRAINAGE AREA TO WETLANDS=12.3 AC. \\58 d ROW CROPS (C=0.35) Q=CIA=(0.35)(7.2 IN/HR)(12.3AC.)=31.0 CFSElY POST CONSTRUCTIONUvmm ll 27 ` 2�lo o to-.. DRAINAGE AREA TO WETLANDS=8.2 AC. r \ \ \ \ \ \ \ 24% MAX. IMPERVIOUS\ 5 — IMPERVIOUS C=0.95 5p0 LAWN C=0.20 T4 WEIGHTED C FACTOR C=(0.24*0.95)+(0.76*0.20)=0.38 (USE 0.40) \ \ \ \ \ \ \ Q=CIA=(0.40)(7.2 IN/HR)(8.2AC.)=23.6CFS-10 \ goo \ \ SCALE \ \ �\ 51 0 \ \ \ I \ I I s'SA` �m I+T�I a h 100 50 100 0400 ' 0 ---------- _ _ 1 I /717.117 : 71. I inch= 100 f q)\ \ 1` / i \ \ \! / C \ ✓� / ! / I/ I / \ 265 264 263 262 261 260 259 258 257 256 255 254 253 252 251 250 249 248 247 246 245 Q w 0 cn 0+00 0+50 265 264 263 262 261 260 259 258 257 256 255 254 253 252 251 250 249 248 247 246 1 +00 245 CROSS SECTION OF STREAM CROSSING 1" = 30' HOR. 1" = 3' VER. STREET 2 J J Q 0 Q J �6o o SND ° 0 0+00 0+50 265 264 263 262 261 260 259 258 257 256 255 254 253 252 251 250 249 248 247 246 1 +00 245 CROSS SECTION OF STREAM CROSSING 1" = 30' HOR. 1" = 3' VER.