Loading...
HomeMy WebLinkAbout20080911 Ver 1_Approval Letter_20081117O?0F WA TF,4pG Michael F. Easley, Governor William G. Ross Jr., Secretary t - North Carolina Department of Environment and Natural Resources p Coleen H. Sullins, Director Division of Water Quality November 17, 2008 DWQ EXP No. 08-0911 Wake County Mr. R. Kirk Leone 5832 Carriage Farm Drive Raleigh, NC 27603 Subject Property: Bailey's Landing, Phase 3 UT to Swift Creek [030402, 27-43-5-(1.5), WS-III, NSW] Approval of 401 Water Quality Certification and Authorization Certification per the Neuse River Buffer Protection Rules (15A NCAC 2B .0233) with Additional Conditions Dear Mr. Leone: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 0.37 acres of wetlands, 279 linear feet of perennial stream and 13,638 ft2 of Zone 1 and 6,025 ft2 of Zone 2 of the protected riparian buffers for the purpose of constructing the road for the proposed subdivision, as described within your Pre-construction Notification Application dated June 2, 2008 and received by DWQ on July 7, 2008, with additional information received by DWQ on July 9, 2008, November 14, 2008, and November 17, 2008. The impacts are covered by: General Water Quality Certification Number 3704 (GC3704). General Certification 3704 allows you to use Nationwide Permit NW 14 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 Permit. This approval is for the purpose and design that you described in your PCN application (June 2, 2008) with modifications received by DWQ on November 13, 2008 (PCN page 8 of 12). If you change your project, you must notify us and you may be required to send us a new application. If the property (or a lot on the property) is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h). This approval requires you to follow the conditions listed in the attached Water Quality Certification (GC3704) and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (and Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/ncwetiands Noce hCarolina Naturally An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Bailey's Landing, Phase 3 DWQ EXP# 08-0911 Page 2 of 5 November 17, 2008 Impact Type Amount Approved nits Plan Location or Reference Wetland (temporary) 0.06 acres November 13, 2008 PCN page 8 of 12 Wetland (permanent) 0.31 (acres) November 13, 2008 PCN page 8 of 12 Stream (perennial) 279 linear feet November 13, 2008 PCN page 8 of 12 Riparian buffer (Zone 1) 13,638 (square feet) June 2, 2008 PCN age 11 of 12 Riparian buffer (Zone 2) 6,025 (square feet) June 2, 2008 PCN age 11 of 12 2. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification and authorized by this approval letter. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 3. No Sediment and Erosion Control Measures in Wetlands and Waters Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval from the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project. 4. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. Erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. Construction Stormwater Permit NCGO10000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self-monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at http: //h2o. enr. state. nc. us/su/FormsvDocuments. htm. 6. Compensatory Mitigation Using the Ecosystem Enhancement Program (EEP) Mitigation must be provided for the proposed impacts as specified in the table below. We understand that you wish to make a payment to the NCDENR Wetlands Trust Fund administered Bailey's Landing, Phase 3 DWQ EXP# 08-0911 ' Page 3 of 5 November 17, 2008 by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement. Until the EEP receives and clears your check (made payable to: DENR - Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 716-1921 if you have any questions concerning payment into the fund. You have 60 days from the date of this approval to make this payment. For accounting purposes, this Authorization Certificate authorizes payment into the NCDENR Wetlands Trust Fund to meet the following compensatory mitigation requirement: Type of Impact Com ensato Mitigation Required River and Sub-basin Number Stream 279 (linear feet) Neuse / 03020201 Wetlands 0 acres Neuse / 03020201 Waters 0 (acres) Neuse / 03020201 Riparian Buffer 49,951.5 (square feet) Neuse / 03020201 7. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not re-concentrate before discharging into a stream as identified within 15A NCAC 2B .0233 (5). If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. 8. Culvert Installation All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual (bqp://www.ncdot.org/doh/operations/BMP _ manual/downloadBMP_Manual.pdf) such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent head cutting of the streams. If any of the existing pipes are or become perched, the appropriate stream grade shall be re-established or, if the pipes installed in a perched manner, the pipes shall be removed and re-installed correctly. Placement of culverts and other structures in waters, streams, and wetlands must be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium shall be maintained if requested in writing by DWQ. 9. If concrete is used during the construction, then a dry work area should be maintained to prevent direct contact prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete should not be discharged to surface waters due to the potential for elevated pH and possible aquatic life/fish kills. Bailey's Landing, Phase 3 DWQ EXP# 08-0911 Page 4 of 5 November 17, 2008 10. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A NCAC 2B.0233 and GC 3704. 11. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and riparian buffers in order to assure compliance for future wetland, water and riparian buffer impact. These mechanisms shall be put in place prior to impacting any wetlands and/or waters approved for impact under this Certification Approval. 12. Notification of Construction The applicant and/or authorized agent shall contact the DWQ Express Review Program in writing at the letterhead address within ten (10) days of the commencement of construction. 13. Certificate of Completion Within thirty (30) days of the completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. The applicant/permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal Law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, then the Division may reevaluate and modify this General Water Quality Certification. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. If you have any questions, please telephone Lia Myott Gilleski or Joseph Gyamfi at 919-733-1786. Bailey's Landing, Phase 3 DWQ EXP# 08-0911 Page 5 of 5 November 17, 2008 Sincerely, Coleen H. Sullins CHSlcbelmg Enclosures: Certificate of Completion GC 3704 cc: James Shern, USACE Raleigh Regulatory Field Office Lauren Witherspoon, DWQ Raleigh Regional Office File Copy Matt Matthews, DWQ Branch Manager Brandon McLamb, Stewart-Proctor Engineering, 319 Chapanoke Road, Suite 106, Raleigh, NC 27603 File: 080911 BaileysLandingPhase3(Wake)EXP+401(N W 14)+NBR.doc O?O? W A T ?;qpG 0 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality North Carolina Division of Water Quality 401 Water Quality Certification Summary of Permitted Impacts and Mitigation Requirements In accordance with 15A NCAC 2H.0500, Mr. R. Kirk Leone, has permission to fill or otherwise impact 0.06 acres of wetland (temporary), 0.31 acres of wetland (permanent), 279 linear feet of perennial stream, 13,638 ft2 of Zone 1 and 6,025 ft2 of Zone 2 of the protected riparian buffers for the purpose of constructing the road for the proposed subdivision on the site, which is located off Old Tryon Road in Raleigh, Wake County, North Carolina. All activities associated with these authorized impacts must be conducted with the conditions listed in the attached Permit transmittal letter. THIS CERTIFICATION IS NOT VALID WITHOUT THE ATTACHMENTS. COMPENSATORY MITIGATION REQUIREMENTS, ECOSYSTEM ENHANCEMENT PROGRAM NC EEP NAME Bailey's Landing Phase 3 DWQ PROJECT #: 20080911 LOCATION: Raleigh COUNTY Wake BASIN/ SUB BASIN Neuse/03020201 As required by 15A NCAC 2H.0500, and the conditions of this Certification, you are required to compensate for the above mitigable impacts through the restoration, creation, enhancement or preservation of wetlands, surface waters and riparian buffers as outlined below prior to conducting any activities that impact or degrade the waters of the state. Note: Acreage requirements proposed to be mitigated through the Ecosystem Enhancement Program must be rounded to one-quarter acre increments and linear foot requirements must be rounded up to the nearest foot according to 15 2R.0503(b). Impacts Mitigation 279 Linear Feet Perennial Stream 279 Linear Feet Perennial Stream 13,638 square feet Zone 1 buffers 40,914 square feet buffers 6,025 square feet Zone 2 buffers 9,038 square feet buffers One of the options you have available to satisfy the compensatory mitigation requirement is through the payment of a fee to the Wetlands Restoration Fund per NCAC 2R.0503. If you choose this option, please sign this form and mail the form along with a copy of your 401 Certification or Buffer Approval to the Ecosystem Enhancement Program at the address below. An invoice for the appropriate amount of payment will be sent to you upon receipt of this form. PLEASE NOTE, THE ABOVE IMPACTS ARE NOT AUTHORIZED UNTIL YOU RECEIVE NOTIFICATION THAT YOUR PAYMENT HAS BEEN PROCESSED BY THE ECOSYTEM ENHANCMENT PROGRAM. Signature Date ECOSYSTEM ENHANCEMENT PROGRAM 1652 Mail Service Center RALEIGH, N.C. 27699-1652 (919) 715-1973 Filename: 080911BaileysLandingPh3(Wake)401&NBR EEP.doc No One hCarolma 401 Oversight/Express Review Permitting Unit QtuCQlll, 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone (919) 733-1786 / Fax (919) 733-6893 Internet: http://www.ncwaterquality.org An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper