November 17, 2008
DWQ EXP No. 08-0911
Wake County
Mr. R. Kirk Leone
5832 Carriage Farm Drive
Raleigh, NC 27603
Subject Property: Bailey's Landing, Phase 3
UT to Swift Creek [030402, 27-43-5-(1.5), WS-III, NSW]
Approval of 401 Water Quality Certification and Authorization Certification per the Neuse River
Buffer Protection Rules (15A NCAC 2B .0233) with Additional Conditions
Dear Mr. Leone:
You have our approval, in accordance with the attached conditions and those listed below, to place fill
within or otherwise impact 0.37 acres of wetlands, 279 linear feet of perennial stream and 13,638 ft2 of
Zone 1 and 6,025 ft2 of Zone 2 of the protected riparian buffers for the purpose of constructing the road
for the proposed subdivision, as described within your Pre-construction Notification Application dated
June 2, 2008 and received by DWQ on July 7, 2008, with additional information received by DWQ on
July 9, 2008, November 14, 2008, and November 17, 2008. The impacts are covered by: General Water
Quality Certification Number 3704 (GC3704). General Certification 3704 allows you to use Nationwide
Permit NW 14 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain
or otherwise comply with any other required federal, state or local permits before you go ahead with your
project including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. Also,
this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in
your application shall expire upon expiration of the 404 Permit.
This approval is for the purpose and design that you described in your PCN application (June 2, 2008)
with modifications received by DWQ on November 13, 2008 (PCN page 8 of 12). If you change your
project, you must notify us and you may be required to send us a new application. If the property (or a lot
on the property) is sold, the new owner must be given a copy of this Certification and approval letter and
is thereby responsible for complying with all conditions. If total fills for this project (now or in the
future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required
as described in 15A NCAC 2H.0506 (h). This approval requires you to follow the conditions listed in
the attached Water Quality Certification (GC3704) and any additional conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (and Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/ncwetiands
Noce hCarolina
Naturally
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Bailey's Landing, Phase 3
DWQ EXP# 08-0911
Page 2 of 5
November 17, 2008
Impact Type Amount Approved nits Plan Location or Reference
Wetland (temporary) 0.06 acres November 13, 2008 PCN page 8 of 12
Wetland (permanent) 0.31 (acres) November 13, 2008 PCN page 8 of 12
Stream (perennial) 279 linear feet November 13, 2008 PCN page 8 of 12
Riparian buffer (Zone 1) 13,638 (square feet) June 2, 2008 PCN age 11 of 12
Riparian buffer (Zone 2) 6,025 (square feet) June 2, 2008 PCN age 11 of 12
2. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond
the footprint of the impacts depicted in the Pre-Construction Notification and authorized by this
approval letter. All construction activities, including the design, installation, operation, and
maintenance of sediment and erosion control Best Management Practices, shall be performed so
that no violations of state water quality standards, statutes, or rules occur.
3. No Sediment and Erosion Control Measures in Wetlands and Waters
Sediment and erosion control measures shall not be placed in wetlands or waters without prior
approval from the Division. If placement of sediment and erosion control devices in wetlands
and waters is unavoidable, design and placement of temporary erosion control measures shall not
be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks,
adjacent to or upstream and down stream of the above structures. All sediment and erosion
control devices shall be removed and the natural grade restored within two (2) months of the date
that the Division of Land Resources or locally delegated program has released the project.
4. Erosion and sediment control practices must be in full compliance with all specifications governing
the proper design, installation and operation and maintenance of such Best Management Practices
in order to protect surface waters standards:
a. Erosion and sediment control measures for the project must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Sediment
and Erosion Control Planning and Design Manual.
b. Design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor-owned or leased borrow pits associated with the project.
c. Sufficient materials required for stabilization and/or repair of erosion control measures and
stormwater routing and treatment shall be on site at all times.
Construction Stormwater Permit NCGO10000
Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land
Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an
NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued
to the project. This General Permit allows stormwater to be discharged during land disturbing
construction activities as stipulated by conditions in the permit. If your project is covered by this
permit [applicable to construction projects that disturb one (1) or more acres], full compliance
with permit conditions including the sedimentation control plan, self-monitoring, record keeping
and reporting requirements are required. A copy of this permit and monitoring report forms may
be found at http: //h2o. enr. state. nc. us/su/FormsvDocuments. htm.
6. Compensatory Mitigation Using the Ecosystem Enhancement Program (EEP)
Mitigation must be provided for the proposed impacts as specified in the table below. We
understand that you wish to make a payment to the NCDENR Wetlands Trust Fund administered
Bailey's Landing, Phase 3
DWQ EXP# 08-0911 '
Page 3 of 5
November 17, 2008
by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has
been determined by the DWQ to be a suitable method to meet the mitigation requirement. Until
the EEP receives and clears your check (made payable to: DENR - Ecosystem Enhancement
Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP
should be contacted at (919) 716-1921 if you have any questions concerning payment into the
fund. You have 60 days from the date of this approval to make this payment. For accounting
purposes, this Authorization Certificate authorizes payment into the NCDENR Wetlands
Trust Fund to meet the following compensatory mitigation requirement:
Type of Impact Com ensato Mitigation Required River and Sub-basin Number
Stream 279 (linear feet) Neuse / 03020201
Wetlands 0 acres Neuse / 03020201
Waters 0 (acres) Neuse / 03020201
Riparian Buffer 49,951.5 (square feet) Neuse / 03020201
7. Diffuse Flow
All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at
non-erosive velocities through the protected stream buffers such that it will not re-concentrate
before discharging into a stream as identified within 15A NCAC 2B .0233 (5). If this is not
possible, it may be necessary to provide stormwater facilities that are considered to remove
nitrogen. This may require additional approval from this Office.
8. Culvert Installation
All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP
measures from the most current version of NCDOT Construction and Maintenance Activities
manual (bqp://www.ncdot.org/doh/operations/BMP _ manual/downloadBMP_Manual.pdf)
such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent
excavation in flowing water.
Culverts required for this project shall be installed in such a manner that the original stream
profiles are not altered. Existing stream dimensions (including the cross section dimensions,
pattern, and longitudinal profile) must be maintained above and below locations of each culvert.
Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent
head cutting of the streams. If any of the existing pipes are or become perched, the appropriate
stream grade shall be re-established or, if the pipes installed in a perched manner, the pipes shall
be removed and re-installed correctly.
Placement of culverts and other structures in waters, streams, and wetlands must be placed below
the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches,
and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow
low flow passage of water and aquatic life. Design and placement of culverts and other structures
including temporary erosion control measures shall not be conducted in a manner that may result
in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream
of the above structures. The applicant is required to provide evidence that the equilibrium shall be
maintained if requested in writing by DWQ.
9. If concrete is used during the construction, then a dry work area should be maintained to prevent
direct contact prevent direct contact between curing concrete and stream water. Water that
inadvertently contacts uncured concrete should not be discharged to surface waters due to the
potential for elevated pH and possible aquatic life/fish kills.
Bailey's Landing, Phase 3
DWQ EXP# 08-0911
Page 4 of 5
November 17, 2008
10. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within these
boundaries approved under this authorization shall be clearly marked with orange warning fencing
(or similar high visibility material) for the areas that have been approved to infringe within the
buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A
NCAC 2B.0233 and GC 3704.
11. Deed Notifications
Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands,
waters and riparian buffers in order to assure compliance for future wetland, water and riparian
buffer impact. These mechanisms shall be put in place prior to impacting any wetlands and/or
waters approved for impact under this Certification Approval.
12. Notification of Construction
The applicant and/or authorized agent shall contact the DWQ Express Review Program in writing
at the letterhead address within ten (10) days of the commencement of construction.
13. Certificate of Completion
Within thirty (30) days of the completion of all work approved within the 401 Water Quality
Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is
required to return the attached certificate of completion to the 401 Oversight/Express Review
Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh,
NC, 27699-1650.
The applicant/permittee and their authorized agents shall conduct all activities in a manner consistent with
State water quality standards (including any requirements resulting from compliance with §303(d) of the
Clean Water Act), and any other appropriate requirements of State and Federal Law. If the Division
determines that such standards or laws are not being met, including failure to sustain a designated or
achieved use, or that State or Federal law is being violated, or that further conditions are necessary to
assure compliance, then the Division may reevaluate and modify this General Water Quality Certification.
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct
impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon
expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved wetland or
stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that
you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of
the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a
hearing.
Any disputes over determinations regarding this Authorization Certificate (associated with the approved
buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is
subject to review as provided in Articles 3 and 4 of G.S. 150B.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. If you have
any questions, please telephone Lia Myott Gilleski or Joseph Gyamfi at 919-733-1786.
Bailey's Landing, Phase 3
DWQ EXP# 08-0911
Page 5 of 5
November 17, 2008
Sincerely,
Coleen H. Sullins
CHSlcbelmg
Enclosures: Certificate of Completion
GC 3704
cc: James Shern, USACE Raleigh Regulatory Field Office
Lauren Witherspoon, DWQ Raleigh Regional Office
File Copy
Matt Matthews, DWQ Branch Manager
Brandon McLamb, Stewart-Proctor Engineering, 319 Chapanoke Road, Suite 106, Raleigh, NC
27603
File: 080911 BaileysLandingPhase3(Wake)EXP+401(N W 14)+NBR.doc
O?O? W A T ?;qpG
0
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
North Carolina Division of Water Quality
401 Water Quality Certification
Summary of Permitted Impacts and Mitigation Requirements
In accordance with 15A NCAC 2H.0500, Mr. R. Kirk Leone, has permission to fill or otherwise impact 0.06 acres
of wetland (temporary), 0.31 acres of wetland (permanent), 279 linear feet of perennial stream, 13,638 ft2 of Zone 1
and 6,025 ft2 of Zone 2 of the protected riparian buffers for the purpose of constructing the road for the proposed
subdivision on the site, which is located off Old Tryon Road in Raleigh, Wake County, North Carolina. All
activities associated with these authorized impacts must be conducted with the conditions listed in the attached
Permit transmittal letter. THIS CERTIFICATION IS NOT VALID WITHOUT THE ATTACHMENTS.
COMPENSATORY MITIGATION REQUIREMENTS, ECOSYSTEM ENHANCEMENT PROGRAM
NC EEP NAME Bailey's Landing Phase 3
DWQ PROJECT #: 20080911
LOCATION: Raleigh
COUNTY Wake
BASIN/ SUB BASIN Neuse/03020201
As required by 15A NCAC 2H.0500, and the conditions of this Certification, you are required to compensate for
the above mitigable impacts through the restoration, creation, enhancement or preservation of wetlands, surface
waters and riparian buffers as outlined below prior to conducting any activities that impact or degrade the waters of
the state.
Note: Acreage requirements proposed to be mitigated through the Ecosystem Enhancement Program must be
rounded to one-quarter acre increments and linear foot requirements must be rounded up to the nearest
foot according to 15 2R.0503(b).
Impacts Mitigation
279 Linear Feet Perennial Stream 279 Linear Feet Perennial Stream
13,638 square feet Zone 1 buffers 40,914 square feet buffers
6,025 square feet Zone 2 buffers 9,038 square feet buffers
One of the options you have available to satisfy the compensatory mitigation requirement is through the payment of
a fee to the Wetlands Restoration Fund per NCAC 2R.0503. If you choose this option, please sign this form and
mail the form along with a copy of your 401 Certification or Buffer Approval to the Ecosystem Enhancement
Program at the address below. An invoice for the appropriate amount of payment will be sent to you upon receipt
of this form. PLEASE NOTE, THE ABOVE IMPACTS ARE NOT AUTHORIZED UNTIL YOU RECEIVE
NOTIFICATION THAT YOUR PAYMENT HAS BEEN PROCESSED BY THE ECOSYTEM ENHANCMENT
PROGRAM.
Signature
Date
ECOSYSTEM ENHANCEMENT PROGRAM
1652 Mail Service Center
RALEIGH, N.C. 27699-1652
(919) 715-1973
Filename: 080911BaileysLandingPh3(Wake)401&NBR EEP.doc
No One
hCarolma
401 Oversight/Express Review Permitting Unit
QtuCQlll,
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone (919) 733-1786 / Fax (919) 733-6893
Internet: http://www.ncwaterquality.org
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper