Loading...
HomeMy WebLinkAboutNC0065587_Response to Comments_20170818A-11131 Dewberry August 18, 2017 NCDEQ Water Resources Division Attn: Trupti Desai 1617 Mail Service Center Raleigh, NC 27699-1617 RE: RESPONSE TO COMMENTS ATC Application Frye Bride WWTF NPDES No NCoo65587 Dear Trupti, Dewberry Engineers Inc 919 881 9939 2610 Wycliff Road, Suite 410 919 881 9923 fax Raleigh, NC 27607 www dewberry com RECEIVED/NCDEQ/DWR AUG 2 9 2017 Water Quality Permitting Section On behalf of Aqua North Carolina (Aqua), Dewberry Engineering (Dewberry) is pleased to provide the following response to your comments received via email on August 9, 2017 for the above mentioned project. The following paragraphs identify each comment and provide our response. Comment is DEQ reviewed the facility's flow history and found that the flow exceeds the maximum predicted hourly flow of 2.5 times the average daily flow. Our best estimate shows an hourly peaking factor of 3 0. Since peaking factor impacts the hydraulic profile and design of new and existing treatment units, please demonstrate that the proposed manual bar screen, equalization/aeration tank and pumps will be able to handle high flow situation when peaking factor is 3.0 Please confirm that the freeboard of 12 inches is maintained in all treatment units with the higher peak flow. Please note that you will need to submit corrected supporting documents including drawings to show this change. Response is The system hydraulics in the proposed aeration basin ultimately dependent on the head over the existing broad crest weir located at the clarifier effluent. Using a peaking factor of three (3) times the average daily flow (ADF) or o 81 MGD, the resultant head over the weir is o 21 inches, which equates to EL 737 26. The calculated hydraulic losses through the proposed 6" diameter aeration basin effluent pipe to the existing clarifier influent are negligible Thus, the calculated water level in the proposed aeration basin is equal to the clarifier water level over the effluent weir The proposed aeration tank has a top elevation of 738.56 FT, which results in a calculated freeboard of 15.6 inches This is greater than the required 12". Furthermore, at a peaking factor of 3, the peak flow is 56 gpm and calculated total dynamic head ranges from 4.7 to 11.7ft depding on basin water level. The attached pump curve provided in the ATC application cites a pump capable of 6o gpm at 115 ft TDH with increasing flow rates as head decreases Therefore the identified pump is adequate for the increased peaking factor. Also, the proposed manual bar screen is adequately sized for the peak flow. The following supporting documents are attached • Revised Table 1: Hydraulic Profile Calculations Page 1 of 2 Response to Comments ATC Application Frye Bridge WWTP NPIDES No NCO065587 August 18, 2017 Revised Sheet C -o6: Hydraulic Profile and Process Flow Diagram Comment 2: Second box in Section 3 - A. Cover Letter (Page 3) is checked in both permit applications but the list is not included in the cover letter. Please confirm. Response 2: There are no variances from any of the requirements listed in Section 3 Part A of the ATC application. Comment 3: Please clarify that the quantity of sludge will not increase after installing the new aeration basin. You will need to submit a sludge management plan if the quantity of sludge will change from the existing situation. Response 3: The quantity of sludge will not increase. The proposed project is a maintenance activity that provides in-kind replacement of the existing aeration basin. Comment 4: What is the volume capacity of the existing aeration basin? Response 4: Historical records of the existing aeration tank were not located. Data collected form the surveyor and owner indicate a total length, width, and height of 50 ft, 7.5 ft, and io ft respectively. It is estimated the existing tank volume is approximately 28,000 gallons. Comment 5: Does the backup power generator have the capacity to run all the demand in the plant including the two new EQ pumps? Response 5: Yes, please refer to electrical sheet E-4 detail 2 and panel schedule. According to this, the identified iso amp generator connection is sufficient to run the proposed and existing plant equipment. Note that the proposed auxiliary power plan for the facility is not being modified per this ATC request Dewberry and Aqua look forward to your concurrence on the proposed facility improvements. If you should have any additional questions or comments, please do not hesitate to contact me via phone and email at (984)-255-7056 or mpouhos@dewberry com Sincerely, -it Michael Pouhos, PE Project Manager Cc: Moses Thompson, Aqua America, Inc. g" Dewberry Page 2 of 2 AQUA NORTH CAROLINA, INC. 202 MACKENAN COURT, CARY, NC 27513 HYDRAULIC PROFILE CALCULATIONS REV. 1.0 FOR FRYE BRIDGE WWTP AERATION BASIN REPLACEMENT DEWBERRY PROJECT NO. 50087184 AUGUST 18, 2017 Prepared by. S. AV A 013093 �Dewberry Dewberry Engineers, Inc 2610 Wychff Road, Suite 410 Raleigh, NC 27607 Phone (919) 881-9939 Fax: (919) 881-9923 www dewbeLa.com 1 Use NPDES Permitted Average Daily Flow 0.027 0.081 MGD 2 Historical 12 -Month Flow 0.008 0.028 MGD, okay 30% NPDES flow. *Selected a PEAK FLOW of 3X ADF. i I Diameter of Pipe 8 inch 2 Min. Slope per 100 ft. 0.4 ft per 100 ft 3 Existing Pipe Invert Elevation _ 739.22 ft 4 Required Length 50 ft 5 Calculated Min. Invert Elevation 739.02 ft 6 Tank Top Elevation 738.56 ft 7 Tank Bttm Elevation 727.56 ft, assumes 11FT deep tank 8 Pipe Invert Above Tank 0.46 ft 9 Determined Pipe Inv. Elevation 738.60 ft, set pipe on top tank 10 Screen Burn Elevation 737.39 ft, assume 14" screen depth 11 Calculated Max Water Level in AB 737.26 ft, okay screen above. 1W CONTROLBOX WEIR 1 Flow Box Top El. 741.56 ft 2 Flow Box Bttm. EI. 738.56 ft 3 22.5 Degree V -Notch Weir Elevation* 739.56 ft, m_a_nuf_. to verify v 4 Head Over Weir 0.37 0.58 ft 4.46 6.92 in 5 Calculated Max. Water EI. 739.93 740.14 ft *Assumes weir crest is 12" above box bttm. THROUGHSESS DIA. PIPE FROMTO CLARIFIER 1 Diameter of pipe 6 inch 2 length of pipe 29 feet 3 Estimated velocity (Q/A) 0.053 0.160 fps 4 Reynolds Number 2216 6649 assume, turbulent S Hazen Williams Coefficient 120 120 6 Major Friction Loss 0.00 0.00 ft _ 7 Minor Friction Loss Fitting K -value # EK Vz 2 EK V' 2 90° Bends 0.9 3 0.00 0.00 ft Entrance Exits 1 2 0.00 0.00 ft 8 Total Losses 0.00 �^ 0.00 ft, insignificant ignore 9 Calculated Max. Water Level in AB 737.15 _ 737.26 ft, assume equal to Clarifier 10 Calculated Free Board 16.89 15.55 in, okay greater than 12" 11 Set Effluent Invert Elevation 737.05 ft, set equal to clarifier weir crest Dewberry Engineers, Inc. Page 1 of 3 Prepared By: Michael Poulios, PE Date: 8/18/2017 Rev 1.0 I Crest Elevation 737.05 737.05 ft 2 Head over weir 0.0085 0.0177 ft 3 Inf. Invert Pipe Elevation 735.95 735.95 ft 4 Eff. Invert Pipe Elevation 736.57 736.57 ft 5 Calculated Water Level in Clarifier 737.15 737.26 ft 6 Top of Tank 738.55 738.55 _ 7 Calculated Free Board 16.78 15.45 in, 1 Diameter of pipe 736.33 ft 2 length of pipe ft 0.643 0.643 3 Estimated velocity (Q/A) 735.69 735.69 0.053 4 Reynolds Number 0.38 ft 2216 5 Hazen Williams Coefficient ft 4.81 120 6 Major Friction Loss 0.310 0.00 7 Minor Friction Loss Fitting K -value # EK VZ 2 90° Bends 0.90 1 0.00 45° Bends 0.42 2 0.00 Entrance Exits 1 2 0.00 8 Total Losses 0.00 1 Top Tank Elevation 2 Influent Pipe Invert Elevation 3 Weir Height 4 60 Degree V -Notch Weir Crest Elevation 5 Head over weir 6 Calculated Maximum Water Level 7 Calculated Free Board 8 Maximum Allowable Flow _ than 12 6 inch 50 feet 0.160 fps 6649 assume, turbulent 120 0.00 ft 0.00 ft 0.00 ft 0.00 ft 0.00 ft, insignificant ignore 736.33 736.33 ft 736.16 ft 0.643 0.643 ft 735.69 735.69 ft 0.24 0.38 ft 735.93 736.06 ft 4.81 3.20 in 0.310 MG flows less than 0.07 1 Post Aeration Basin. Eff. Pipe Inv. Elevation 733.65 ft 2 Post Aeration Top Tank Elevation 735.82 ft, from survey 3 Outfall, Eff. Pipe Inv. Elevation 731.59 ft _ 4 Based on previous calculations, losses through 6" dia. Effluent pipe is negligible. Dewberry Engineers, Inc. Page 2 of 3 Prepared By: Michael Poulios, PE Date: 8/18/2017 Rev 1.0 1 Diameter of pipe 3 inch 2 length of pipe 15 feet 3 Required Pumping Rate _ 56 gpm (Peak flow = ADF X 3.0 1 4 Estimated velocity (Q/A) 2.553 fps 5 Reynolds Number 106387 assume, turbulent 6 Hazen Williams Coefficient 120 7 Major Friction Loss 0.006 ft i 8 Minor Friction Loss Fitting K -value # EK VZ 2 90° Bends 0.90 2 0.182 ft Check Valve 2.30 0 0.000 Plug valve 0.2 0 0.000 ft Entrance Exits 1 2 0.202 ft 1 9 Total Losses _ 10 Define Static Head Conditions a. Top Pump Discharge EI. b. Min Water Level c. Max Water Level i 11 Total Dynamic Head at Max Water EI. 12 Total Dynamic Head at Min. Water EI. Dewberry Engineers, Inc. Page 3 of 3 0.39 ft 741.56 ft 730.26 ft 737.26 ft 4.69 ft TDH 11.69 ft TDH Prepared By: Michael Poulios, PE Date: 8/18/2017 Rev 1.0