HomeMy WebLinkAbout20140957 Ver 5_Additional SW Plan Sheets_20170828Burdette, Jennifer a
From: Lucas, Annette
Sent: Monday, August 28, 2017 3:07 PM
To: Higgins, Karen; Burdette, Jennifer a
Cc: David Odom
Subject: Fw: Dry pond Revision
Attachments: STABLEHOUSE DRY POND.pdf, SALAMANDER DRY POND.pdf
Karen and Jennifer,
With the addition of these two plan sheets to the most recent submittals, I approve the stormwater plan for
Tryon Horse Farm. Please let me know if you have any questions.
Sincerely,
Annette
From: Larissa Coles <larissa@odomengineering.com>
Sent: Monday, August 28, 2017 2:53 PM
To: Lucas, Annette; Chris Waters
Subject: Dry pond Revision
Hi Annette,
Chris asked me to send you the revised detail for the dry pond. Please let us know if you need anything else.
Thank you,
Larissa Coles
From: Chris Waters
Sent: Monday, August 28, 2017 2:52 PM
To: Larissa Coles <larissa@odomengineering.com>
Subject: Dry pond Revision
Chris Waters
Senior Draftsman
Odom Engineering, PLLC
169 Oak Street, Forest City, NC 28043
Ph: 828.247.4495 Fx:828.247.4498
1
STAB LEH OU SE NORTH /
100' X 50'- I
6' DEPTH-
12"
ORIFICE---"
24 0 U TL E�T�
AREA TO BE
IMMEDIATELY SODDED
AFTER BEING
CONSTRUCTED
EMERGENCY
SPILLWAY
10' ACCESS
EASEMENT
\ LEVEL SPREADER
SALAMANDER NORTH
DRY DETENTION POND
INV.= 859 0'
i
AREA TO BE SODDED /
IMMEDIATELY AFTER BEING
OF UCTURE: =872. CONSTRUCTED.
I OUT. =859.5'
INV. IN: =869.0' i
/////// /' r
24" OUTLET PIPE