Loading...
HomeMy WebLinkAbout20140957 Ver 5_Additional SW Plan Sheets_20170828Burdette, Jennifer a From: Lucas, Annette Sent: Monday, August 28, 2017 3:07 PM To: Higgins, Karen; Burdette, Jennifer a Cc: David Odom Subject: Fw: Dry pond Revision Attachments: STABLEHOUSE DRY POND.pdf, SALAMANDER DRY POND.pdf Karen and Jennifer, With the addition of these two plan sheets to the most recent submittals, I approve the stormwater plan for Tryon Horse Farm. Please let me know if you have any questions. Sincerely, Annette From: Larissa Coles <larissa@odomengineering.com> Sent: Monday, August 28, 2017 2:53 PM To: Lucas, Annette; Chris Waters Subject: Dry pond Revision Hi Annette, Chris asked me to send you the revised detail for the dry pond. Please let us know if you need anything else. Thank you, Larissa Coles From: Chris Waters Sent: Monday, August 28, 2017 2:52 PM To: Larissa Coles <larissa@odomengineering.com> Subject: Dry pond Revision Chris Waters Senior Draftsman Odom Engineering, PLLC 169 Oak Street, Forest City, NC 28043 Ph: 828.247.4495 Fx:828.247.4498 1 STAB LEH OU SE NORTH / 100' X 50'- I 6' DEPTH- 12" ORIFICE---" 24 0 U TL E�T� AREA TO BE IMMEDIATELY SODDED AFTER BEING CONSTRUCTED EMERGENCY SPILLWAY 10' ACCESS EASEMENT \ LEVEL SPREADER SALAMANDER NORTH DRY DETENTION POND INV.= 859 0' i AREA TO BE SODDED / IMMEDIATELY AFTER BEING OF UCTURE: =872. CONSTRUCTED. I OUT. =859.5' INV. IN: =869.0' i /////// /' r 24" OUTLET PIPE