Loading...
HomeMy WebLinkAbout20170957 Ver 1_Approval Letter_20170828Water Resources Environmental Quality August 28, 2017 James Gibson 58 Lyons Place Basking Ridge, NJ 07920 ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director DWR # 17-0957 Buncombe County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS Gibson Stream Restoration Dear Mr. Gibson: You have our approval for the impacts listed below for the purpose described in your application dated July 27, 2017, and received by the Division of Water Resources (Division) on August 10, 2017. These impacts are covered by the attached Water Quality General Certification Number 4087 and the additional conditions listed below. This certification is associated with the use of Nationwide Permit Number 27 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, and Trout Buffer regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02H .0506(b) and/or (c)] Type of Impact Amount Approved Amount Approved (units) (units) Permanent Temporary Streams Impact S1 250 (linear feet) 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the State of North Carolina I Environmental Quality I Water Resources 2090 U.S. Highway 70, Swannanoa, North Carolina 28778 828-296-4500 Gibson Stream Restoration DWR# 17-0957 401 Approval Page 2 of 4 Certification/Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification(s) and is responsible for complying with all conditions. [15A NCAC 02H .0507(d)(2)] 3. Natural fiber matting is required for streambank stabilization over plastic matting that can entrap small animals. [15A NCAC 02H .0506(b)(2)] 4. Visual monitoring of the stabilization project shall be conducted at a minimum of quarterly for the first year or two bankfull events (whichever is longer), and then annually until the site is stable (particularly after storm events) and vegetation is successful. Any failures of structures, streambanks, or vegetation may require future repairs or replacement, which requires coordination with the Asheville Regional Office to ensure the stability and water quality of the stream and downstream waters. [15A NCAC 02H .0506(b)(2) and (b)(3)] 5. Fueling, lubrication and general equipment maintenance should not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuel and oils. [15A NCAC 02H .0506 (b)(3) and (c)(3) and 15A NCAC 0213 .0200 (3)(f)] 6. All mechanized equipment operated near surface waters or wetlands will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids or other potential toxic chemicals. In the event of a hydrocarbon or chemical spill, the permittee/contractor shall immediately contact the Division of Water Quality, between the hours of 8 am to 5 pm at the Asheville Regional Office at 828.296.4500 and after hours and on weekends call (800) 858-0368. Management of such spills shall comply with provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act. [15A NCAC 02H .0506 (b)(3) and (c)(3), 15A NCAC 02B .0200 (3)(f), and GS 143 Article 21A] 7. The proposed project shall follow the recommendations stated in the North Carolina Wildlife Resources Commission (NCWRC) comment letter dated August 23, 2017 (attached) to the maximum extent practicable. [15A NCAC 02H .0506(b)(2)] This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Certification can be contested as provided in Articles 3 and 4 of General Statute 1508 by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the Gibson Stream Restoration DWR# 17-0957 401 Approval Page 3 of 4 original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:OOam and S:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service Office of Administrative Hearings 6714 Mail Service Center If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DENR: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review by the Division under section 401 of the Clean Water Act as described in 15A NCAC 02H .0500. Please contact Kevin Mitchell at 828-296-4650 or kevin.mitchell@ncdenr.gov if you have any questions or concerns. Sincerely, Zan Price, P.E., Assistant Regional Supervisor Water Quality Regional Operations Asheville Regional Office Enclosures: GC 4087 Certificate of Completion NCWRC letter dated August 23, 2017 Gibson Stream Restoration DWR# 17-0957 401 Approval Page 4 of 4 cc: Dena Chandler— Equinox Environmental (via email) Amanda Jones — USACE Asheville Regulatory Field Office (via email) Andrea Leslie — NCWRC (via email) Stan Aiken — Division of Energy, Mineral, and Land Resources (via email) DWR ARO 401 files DWR 401 and Buffer Permitting Unit (via email) G:\WR\WQ\Buncombe\401s\Non-DOT\Gibson Stream Restoration\APRVL.Gibson Stream Restoration 08.28.2017.docx