Loading...
HomeMy WebLinkAbout20072209 Ver 1_Buffer Determination_20081105 0[ �k dhmii 0 RosOr,1,"rdary 7 \orflii.'arofina 0,parirrwn;os f nwannwill and NaLural R ,tU%C, Coieen H Suilins,Director Division of Water Quality Chuck Wakdd,RE.,Deputy Dmector Divisor of Water Quality November 5. 2008 DWQ Proliect ;1 2007-2209 Craven Count, Page I ol'2 Andrew Purifoy..Jr. 5591 NC I IWY 118 Grifton, NC 28530 Subject Property: Carolina Stone, LLC(Fort Barnwell Mine), Fort Barnwell, NC Ul'to Neuse River, Neuse River Basin (03-04-05, C. S%N: NSNN7: 27-85) On-Site Determination for Applicability to the Neuse River Riparian Area Protection Rules (15A NCAC 2B.0233) Dear Mr. Purifoy: At your request I conducted an on-site determination to review features located oil the subject property for applicability to the Neuse Buffer Rules (15A NCAC 213 .0233). The features are labeled as­2007-2209- on the attached map initialed by me on November 5. 2008. The Division of Water Quality (DWQ) has determined that the portion of the surface water that is highlighted in pink and labeled as "2007-2209" on the attached map is Exempt from the Neuse Buffer Rule. These features and their associated buffers should be identitied on any future plans for this property. The o\Amer(or future ow-nerd should notify the D\VQ (and other relevant agencies)of this decision in any future correspondences concerning this property. '['his on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the D\VQ or Delegated Local Authority that a surface water exists and that it is subject to the buffer rule may request a determination by the Director. A request for a determination by the Director shall be referred to the Director in writing c,�o Cyndi Karoly. D\VQ. 401 Oversi ght,,T.x press Review Permitting 1--nil. 2321 Crabtree Blvd., Suite 250, Raleigh, NC 27604-2260. Individuals that dispute -a determination by the DXVQ or Delegated Local Authority that -exempts- a surface water 1roin the buffer rule may ask for an u4judicatory hearing. You must act within 60 days of the date that ,.ou receive this letter. Applicants are hereby notified that the 60-day statutory appeal time does not start until the affected party (including downstream and adjacent landowners) is notified of' this decision. DWQ recommends that the applicant conduct this notification in order tc1 be certain that third party appeals are made in a timely manner. To ask I'or a hcaring.. send a written petition. which conforms to Chapter 15013 of the North Carolina General Statutes to the Oftice of 443 A a.,1ingiotl Square\ILIJI llhoiw 252=946-6481 011e FAX 2i2-k;4o,-921 i NorthCarofina An Equai OppiunoiAtfirritative Acton Employer—50%Recyc a 101%Ror.Consurrw Paper Naturally Carolina Stone- Fon Barnwell %-tine Page November 5.2008 Administrative Hearings, 6714 Mail Service Center. Raleigh. N.C. 27699-6714. This determination is final and binding unless you ask for a hearing within 60 days. This letter only addresses the applicability, to the buffer rules and does not approve any activity within the buffers. Nor does this letter approve any activity within Waters of the United States or Waters of the State. If you have any additional questions or require additional information please call me at(252) 94$-3920. Sincerely, Chris Pullinger•'Gnvironrnental Specialist Division of Water Quality Surface Water Protection Washington Regional Office Enclosures: copy of 1:24.000 scale L'SGS Topographic Survey map. Fort Barnwell quad cc: UWQ 401 Oversight/Express Unit WaRO File Copy Michael Rice,Robert M.Chiles PE.417-A Broad St.,PO Box )496,New Bern,NC: 28564-3496 4 � lie a.. .__..._. "a iF n '• 0 m V J • A m � 4