HomeMy WebLinkAbout20110801 Ver 1_Compliance Inspection Letter_20170824Water Resources
Environmental Quality
Beverly Cahoon
George Davis
Calvin Davis
19770 US Highway 264
Swan Quarter, NC 28885
August 24, 2017
Subject: 401 Water Quality and
Buffer Authorization Certification Inspection
Cahoon -Davis Marsh Restoration
DWR Project # 11-0801
Dear Messrs. Davis and Ms. Cohoon:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. JAY ZIMMERMAN
Director
On January 17, 2017, Anthony Scarbraugh of the Division of Water Resources (DWR) inspected proposed
construction of a rip -rap sill and pier with platform located at western intersection of Irvin Garrish
Highway and Silver Lake Drive in Ocracoke, Hyde County. This project was inspected for compliance with
the General Water Quality Certification (GC) #3641 and Buffer Authorization with Additional Conditions
issued on October 4, 2011 for the proposed project.
The GC approved impacts of 0.08 acres of open water and 300 square feet of buffer impact to complete
your project as described in your application received by DWR on August 16, 2011.
The inspection revealed that the project has been completed. Impacts did not exceed beyond the
footprint of those approved. The inspection revealed that the inspected portion of this project is currently
compliant with the GC #3641 and buffer authorization.
As a reminder, if you change your project you must notify us and you may be required to send us a new
application. If the property is sold, the new owner must be given a copy of the Certification and approval
letter and is thereby responsible for complying with all conditions. Upon completion of all work approved
within the 401 WQC, and any subsequent modifications, the applicant is required to return the enclosed
certificate of completion to the 401 & Buffer Permitting Unit, North Carolina Division of Water Resources,
1617 Mail Service Center, Raleigh, NC 27699-1617. This document can also be accessed through the DWR
401 & Buffer Permitting Unit website at http://portal.nedenr.ora/web/wq/401buffeipermitting.
Violations of any condition set forth in the Certifications and Additional Conditions may result in
revocation of this Certifications and may result in criminal and/or civil penalties. The authorizations to
proceed with your proposed impacts or to conduct impacts to water and buffer as depicted in your
application and as authorized by this Certifications shall expire upon the expiration of the 404 or CAMA
Permit and Buffer Authorization. 'Nothing Compares
State of North Carolina I Environmental Quality I Water Resources -Water Quality Regional Operations Section -Washington Regional Office
943 Washington Square Mall, Washington, North Carolina 27889
252-946-6481
Should you have any questions regarding these matters, please contact me at (252) 946-3924.
Sincerely,
Anthony Scar�raugh, Environmental Senior Specialist
ater Quality: Regional Operations Section
Division dater Resources, NCDEQ
Enclosure: Certificate of Completion
cc: WaRO File
Laserfiche
Raleigh Bland, USACE Washington Regulatory Field Office (via email)
Steve Trowell, DCM WaRO
Shelton Sullivan, 401 & Buffer Permitting Unit