Loading...
HomeMy WebLinkAboutNC0004961_Permit Modification_19880329State of North Carolina Department of Natural Resources and Community Development Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Govemor March 29, 1988 R. Paul Wilms S. Thomas Rhodes, Secretary Director Mr. B. K. Sipe Duke Power Company Post Office Box 33189 Charlotte, NC 28242 SUBJECT: Permit Modification NPDES Permit No. NC0004961 Riverbend Steam Station Gaston County Dear Mr. Sipe: The subject permit was issued to you on June 12, 1987. Duke Power adjudicated the permit based on certain conditions contained in Part III of the permit that related to groundwater monitoring. During a meeting between the Division and Duke Power, it was agreed to delete conditions D, S, and T from Part III and to add a surface water monitoring requirement. This letter is to provide formal notification that the Division is hereby modifying the subject permit to delete conditions D, S, and T of Part III and to add condition V as follows: V. A study will be completed to further define the assimilative capacity of the Catawba River for pollutants potentially reaching the river, and the current impact of the discharge from both surface and subsurface sources. A study plan will be submitted to the permitting agency by June 1, 1988, outlining parameters, e'a�°��'�s7s § locations and frequency of monitoring. The study will be comped F and results submitted to the permitting agency at the 180 day'" prior to permit reissuance.��i n It�ne "�• This letter should be placed with your permit. All other terms ane- c � ofx`.�� your permit remain in full force and effect. A.formal withdrawal of your:adjudicatic;A-41 must be filed to close out this matter. Continued . . . Pollution Prei"twx Pays x If you have any questions, please contact Mr. Arthur Mouberry at 733-5083 or Yvonne Bailey at 733-7247. Sincealy, R. Paul,Wilms cc: EPA Mooresville Regional Supervisor Yvonne Bailey Groundwater Section Compliance i! e E i b i k i DIVISION OF ENVIRONMENTAL MANAGEMENT March 25, 1988 MAR 28 1988 MEMORANDUM TO: Yvonne Bailey Legal Affairs FROM: Steve W. Tedder SUBJECT: Duke Power Company/Riverbend This correspondence is to advise you that I was contacted by Mr. Ralph Roberts of Duke Power on March 25, 1988. He called to inform me that the draft language concerning the stream monitoring for this facility was acceptable as submitted. The following is the language I submitted to our permits staff and I assume this is what will be in the permit condition: A study will be completed to further define the assimilative of the Catawba River for pollutants potentially reaching the river, and the current impact of the discharge from both surface and subsurface sources. A study plan will be submitted to the permitting agency by June 1, 1988 outlining parameters, locations, and frequency of monitoring. The study will be completed and results submitted to the permitting agency at least 180 days prior to permit reissuance. SWT/gh cc: (. hXirl Mouberry �' T' 4y