HomeMy WebLinkAboutNC0004961_Permit Modification_19880329State of North Carolina
Department of Natural Resources and Community Development
Division of Environmental Management
512 North Salisbury Street • Raleigh, North Carolina 27611
James G. Martin, Govemor March 29, 1988 R. Paul Wilms
S. Thomas Rhodes, Secretary Director
Mr. B. K. Sipe
Duke Power Company
Post Office Box 33189
Charlotte, NC 28242
SUBJECT: Permit Modification
NPDES Permit No. NC0004961
Riverbend Steam Station
Gaston County
Dear Mr. Sipe:
The subject permit was issued to you on June 12, 1987. Duke Power adjudicated
the permit based on certain conditions contained in Part III of the permit that
related to groundwater monitoring. During a meeting between the Division and Duke
Power, it was agreed to delete conditions D, S, and T from Part III and to add a
surface water monitoring requirement.
This letter is to provide formal notification that the Division is hereby
modifying the subject permit to delete conditions D, S, and T of Part III and to add
condition V as follows:
V. A study will be completed to further define the assimilative
capacity of the Catawba River for pollutants potentially reaching
the river, and the current impact of the discharge from both
surface and subsurface sources. A study plan will be submitted
to the permitting agency by June 1, 1988, outlining parameters, e'a�°��'�s7s §
locations and frequency of monitoring. The study will be comped F
and results submitted to the permitting agency at the 180 day'"
prior to permit reissuance.��i
n It�ne "�•
This letter should be placed with your permit. All other terms ane- c � ofx`.��
your permit remain in full force and effect. A.formal withdrawal of your:adjudicatic;A-41
must be filed to close out this matter.
Continued . . .
Pollution Prei"twx Pays
x
If you have any questions, please
contact Mr. Arthur Mouberry at 733-5083 or
Yvonne Bailey at 733-7247.
Sincealy,
R. Paul,Wilms
cc: EPA
Mooresville Regional Supervisor
Yvonne Bailey
Groundwater Section
Compliance
i!
e
E
i
b
i
k
i
DIVISION OF ENVIRONMENTAL MANAGEMENT
March 25, 1988
MAR 28 1988
MEMORANDUM
TO: Yvonne Bailey
Legal Affairs
FROM: Steve W. Tedder
SUBJECT: Duke Power Company/Riverbend
This correspondence is to advise you that I was contacted by Mr. Ralph
Roberts of Duke Power on March 25, 1988. He called to inform me that the
draft language concerning the stream monitoring for this facility was
acceptable as submitted.
The following is the language I submitted to our permits staff and I
assume this is what will be in the permit condition:
A study will be completed to further define the assimilative of the
Catawba River for pollutants potentially reaching the river, and the current
impact of the discharge from both surface and subsurface sources. A study
plan will be submitted to the permitting agency by June 1, 1988 outlining
parameters, locations, and frequency of monitoring. The study will be
completed and results submitted to the permitting agency at least 180 days
prior to permit reissuance.
SWT/gh
cc: (. hXirl Mouberry
�' T' 4y