HomeMy WebLinkAbout20071114 Ver 1_More Info Received_20081112FREELAND and KAUFFMAN, INC.
EMGmzws • L wscAPE ARQ'pwrg
November 7, 2008
To: Annette Lucas, 401 Permitting Unit
NCDENR - Division of Water Quality
2321 Crabtree Blvd., Suite 250
Raleigh, NC 27604
(919-715-3425)
tg@[p
g pnpi
p
NOV 1 2 2008
DENR - YVP:CtF? QUGu I l7'
VVETLANDS AND STORM1ATER BRANCH
Re: Shoppes at Oxford
Oxford, NC
Request for Revision to Stormwater Approval Associated with 401
Certification
DWQ EXP No. 07-1114 - Granville County
On behalf of our client, Oxford Retail Investment, LLC, we are requesting a
revision to the stormwater approval associated with the 401 Certification for the
above-referenced project. Please find enclosed the following information:
• (1) copy of the Stormwater Management Report Addendum (including
detailed narrative and calculations)
(1) copy of the revised Grading and Drainage Plans
The purpose of the stormwater plan change is to modify the outlet design from the
detention pond to direct more water to the existing wetlands area in the post-
development condition. The enclosed Stormwater Management Report
Addendum provides detailed discussion and calculations of this change. Since the
changes are made only after stormwater discharges from the primary pond, the
original pond design and water quality treatment remains unaffected from the
original design and approval.
Should you have any questions or need additional information, please contact me
directly at 864.672.3441 or mranks _fk-inc.com. Thank you for your assistance.
Sincerely
M ael Ranks
209 West Stone Avenue • Greenville. South Carolina 29609 • Telephone 864-233-5497 • Fax 864-233-8915
STORMWATER MANAGEMENT REPORT
ADDENDUM
Shoppes at Oxford
Oxford, NC
November 6, 2008
Prepared by:
Freeland and Kauffman, Inc.
Engineers - Landscape Architects
209 West Stone Ave.
Greenville, SC 29609
864-233-5497
ic a"
?';• r k L
`'
TABLE OF CONTENTS
1. Narrative ..................................................................................................................................... 1-2
2. Stormwater Hydrograph Summary ............................................................................................3-4
3. Pipe flow Calculations ....................................................................................................................5
4. Win TR-55 Outputs ...................................................................................................................6-10
5. RipRap Apron Design on chart ............................................................................................. 11-12
6. Stormwater Hydrographs ......................................................................................................13-18
NARRATIVE D1 _o 1?-
There is an existing wetland area which is located on the southern portion of this project. A single
detention pond has been designed to collect stormwater runoff from the developed condition of this
project and discharge it at appropriate pre-development flow-rates. However, the discharge line from
the pond bypasses the existing wetlands area, and the result is that the wetlands area receives a
reduced amount of stormwater runoff than it did in the pre-development condition.
We are, therefore, proposing to modify the discharge from this project's detention pond to direct the
majority of flow during the 2 and 10 year storm events toward the existing wetlands area. This should
better approximate the pre-development hydrology of the wetlands.
In order to accomplish this, we propose to install an additional 18" discharge line from the pond
which will be directed directly to the wetlands. A small berm (6' width) has been added within the
pond extension area (grassed swale). This berm will act as a weir to insure that the initial runoff from
all storm events is first directed to the wetlands. Larger flow rates will spill over the berm and
continue to discharge to the original location (which bypasses the wetlands).
Supporting calculations are included in this report. A summary of the design calculations is as follows:
CALCULATION SUMMARY
2-Year Storm Event:
• Total drainage area to the wetland in pre-development condition = ±11.80 AC
• 2-yr pre-developed runoff rate to wetland area = ± 17.27 cfs (SCS method, CNw 75, T? = 20
min.)
• 2-yr pre-developed runoff volume to wetland area = ± 55,714 cf
• Drainage area which direct-discharges into the wetland in post-developed condition = ±33
AC
• 2-yr post-developed direct runoff rate to wetland area = ± 7.42 cfs (SCS method, CNw 79, Tc
= 10 min,)
• 2-yr post-developed direct runoff volume to wetland area = ± 19,345 cf
• 2-yr pond discharge flow rate = ± 1.49 cfs
• 2-yr pond discharge volume = ± 308,289 cf
• The maximum flow rate out of the pond during the 2-year storm event is calculated to be 1.49
cfs. Therefore, the additional 18" RCP discharge line should convey all runoff during the 10-
year storm event to the wetlands area, as the capacity of an 18" RCP at 0.5% slope = 9.66 cfs
(manning's equation).
10-Year Storm Event:
• Total drainage area to the wetland in pre-development condition = ±11.80 AC
• 10-yr pre-developed runoff rate to wetland area = ± 39.10 cfs (SCS method, CNw 75, T? _
20min.)
• 10-yr pre-developed runoff volume to wetland area = ± 122,425 cf
• Drainage area which direct-discharges into the wetland in post-developed = ±33 AC
• 10-yr post-developed direct runoff rate to wetland area = ± 15.39 cfs (SCS method, CNw 79,
Tc = 10 min.)
• 10-yr post-developed direct runoff volume to wetland area = ± 39,983 cf
• 10-yr pond discharge flow rate = ± 6.61 cfs
• 10-yr pond discharge volume = ± 539,121 cf
• The maximum flow rate out of the pond during the 10-year storm event is calculated to be
6.61 cfs. Therefore, the additional 18" RCP discharge line should convey all runoff during the
10-year storm event to the wetlands area, as the capacity of an 18" RCP at 0.5% slope = 9.66
cfs (manning's equation).
2
Hydrograph Summary Report
Hyd.
No. Hydrograph
type
(origin) Peak
flow
(cis) Time
Interval
(min) Time to
peak
(min) Volume
(cult) Inflow
hyd(s) Maximum
elevation
(it) Maximum
storage
(cult) Hydrograph
description
1 SCS Runoff 17.27 2 726 55,714 -- --- -- Pre DA -WETLAND
2 SCS Runoff 7.42 2 720 19,345 -- - - -- Post DA -WETLAND
3 Manual 1.49 2 1244 308,289 - --- - - Pond Discharge
Wetland flow calcs.gpw Return Period: 2 Year Friday, Nov 7 2008, 11:18 AM
Hydraflow Hydrographs by Intelisolve
3
Hydrograph Summary Report
Hyd.
No. Hydrograph
type
(origin) Peak
flow
(cfs) Time
interval
(min) Time to
peak
(min) Volume
(cuft) Inflow
hyd(s) Maximum
elevation
(ft) Maximum
storage
(cuft) Hydrograph
description
1 SCS Runoff 39.10 2 724 122,425 ---- ------ -- Pre DA -WETLAND
2 SCS Runoff 15.39 2 720 39,983 ---- ------ Post DA -WETLAND
3 Manual 6.61 2 862 539,121 ---- ------ ------ Pond Discharge
Wetland flow calcs.gpw Return Period: 10 Year Friday, Nov 7 2008, 2:33 PM
Hydraflow Hydrographs by Intelisolve
q
Worksheet for Circular Pipe - 1
Project Description
Friction Method Manning Formula
Solve For Discharge
Input Data
Roughness Coefficient
Channel Slope
Normal Depth
Diameter
Results
Discharge
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Percent Full
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Ma)amum Discharge
Discharge Full
Slope Full
Flow Type
GVF Input Data
Downstream Depth
Length
Number Of Steps
GVF Output Data
Upstream Depth
Profile Description
Profile Headloss
Average End Depth Over Rise
Normal Depth Over Rise
Downstream Velocity
Upstream Velocity
SubCritical
0.010
0.00500 ft/ft
1.50 ft
1.50 ft
9.66 ft/s
1.77 ftz
4.71 ft
0.00 ft
1.20 ft
100.0 %
0.00524 ft/ft
5.46 ft/s
0.46 ft
1.96 ft
0.00
10.39 ft'/s
9.66 ft/s
0.00500 ft/ft
0.00 ft
0.00 ft
0
0.00 ft
0.00 ft
0.00 %
100.00 %
Infinity ft/s
Infinity ft/s
Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.066.001
1117/2008 11:01:43 AM 27 Slemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2
J
WinTR-55 Current Data Description
Identification Data ---
User: Prakash Date: 10/28/2008
Project: Units: English
SubTitle: Areal Units: Acres
State: North Carolina
County: Granville
Filename: G:\Projects\Wal-Mart\Oxford NC\Documents\SWM Design\TC-Wetland.w55
--- Sub-Area Data ---
Name Description Reach Area(ac) RCN Tc
------------------------------------------------------------------------------
Wetland-Pr 11.79 75 0.335
Wetland-Po 3.3 79 0.162
Total area: 15.09 (ac)
--- Storm Data --
Rainfall Depth by Rainfall Return Period
2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr
(in) (in) (in) (in) (in) (in) (in)
--------------------------------------------------------------------------------
3.5 9.7 5.5 6.3 7.1 7.9 3.0
Storm Data Source: Granville County, NC (NRCS)
Rainfall Distribution Type: Type II
Dimensionless Unit Hydrograph: <standard>
WinTR-55, Version 1.00.08 Page 1 11/7/2008 11:02:17 AM
6
Prakash
Granville County, North Carolina
Storm Data
Rainfall Depth by Rainfall Return Period
2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr
(in) (in) (in) (in) (in) (in) (in)
--------------------------------------------------------------------------------
3.5 4.7 5.5 6.3 7.1 7.9 3.0
Storm Data Source: Granville County, NC (NRCS)
Rainfall Distribution Type: Type II
Dimensionless Unit Hydrograph: <standard>
WinTR-55, Version 1.00.08 Page 1 11/7/2008 11:02:17 AM
Prakash
Granville County, North Carolina
Sub-Area Summary Table
Sub-Area Drainage Time of Curve Receiving
Identifier Area Concentration Number Reach
(ac) (hr)
-------------------------------------------------------
Wetland-Pr 11.79 0.335 75
Wetland-Po 3.30 0.162 79
Total Area: 15.09 (ac)
Sub-Area
Description
WinTR-55, Version 1.00.08 Page 1 11/7/2008 11:02:17 AM
8
Prakash
Granville County, North Carolina
Sub-Area Time of Concentration Details
Sub-Area Flow Mannings's
Identifier/ Length Slope n
------------ (ft)
---------- (ft/ft)
--------
-----------
Wetland-Pr
SHEET 100 0.0330 0.400
SHALLOW 677 0.0450 0.050
Wetland-Po
SHEET 100 0.0350 0.170
SHALLOW 300 0.0483 0.050
End Wetted Travel
Area Perimeter Velocity Time
(sq ft) (ft) (ft/sec) (hr)
--------------------------------------
0.280
0.055
WinTR-55, Version 1.00.08 Page 1
Time of Concentration 0.335
0.138
0.024
Time of Concentration 0.162
11/7/2008 11:02:17 AM
9
Prakash
Granville County, North Carol ina
Sub-Area Land Use and Curve Number Details
Sub-Area Hydrologic Sub-Area Curve
Identifier Land Use Soil Area Number
----------------
------------------------------
------ Group
----------- (ac)
-----------
------
Wetland-PrPaved parking lots, roofs, driveways C .41 98
Woods - grass combination (good) C 7.12 72
Woods (poor) C 4.26 77
Total Area / Weighted Curve Number 11.79 75
Wetland-PoPaved parking lots, roofs, driveways C .41 98
Woods - grass combination (good) C .63 72
Woods (poor) C 2.26 77
Total Area / Weighted Curve Number 3.3 79
WinTR-55, Version 1.00.08 Page 1
11/7/2008 11:02:17 AM
(0
t .
'P. ----IT
t•
La= 9f
I
N
a
ro
a
0
N
? 3? CASE fa,?
1000
Figure 4.5-2 Design of Riprap Apron under Minimum Tailwater Conditions
(Source: USDA, SCS, 1975)
Discharge (0 /sec)
Curves may not be extrapolated.
f
,_,'
_ ?.? ? ?. ?
FREELAND and KAUFFMAN, INC.
ENGINEERS • LANDSCAPEARCHITECTS
209 West Stone Avenue Job: Shoppes at Oxford, Oxford, NC Job No.: Date: 11 /6/2008
Greenville, South Carolina 29609
864-233-5497 Computed By: PCK
864-233-8915 Checked By: MCR
Calculation for: RIP-RAP APRONS
DS #44 Q10 (CFS) = 6.61
PIPE DIA (IN) = 18
LA (FT) = 9
We (FT) = 4.5 (3 * PIPE DIAMETER)
W end = 8.1 (Wc + (0.4 * LM
D 50 (IN) = 6
D MAX (IN) = 9 (1.5 * D50)
DEPTH (IN) = 13.5 0.5 * D MAX)
I Z-
Hydrograph Plot
Hydraflow Hydrographs by Intelisolve Friday, Nov 7 2008, 11:22 AM
Hyd. No. 1
Pre DA -WETLAND
Hydrograph type = SCS Runoff Peak discharge = 17.27 cfs
Storm frequency = 2 yrs Time interval = 2 min
Drainage area = 11.79 ac Curve number = 75
Basin Slope = 0.0% Hydraulic length = 0 ft
Tc method = USER Time of conc. (Tc) = 20 min
Total precip. = 3.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Hydrograph Volume = 55,714 cuft
Pre DA -WETLAND
Q (cfs) Q (cfs)
Hyd. No. 1 -- 2 Yr
18.00
15.00
12.00
9.00
6.00
3.00
0.00
18.00
15.00
12.00
9.00
6.00
3.00
0.00
0 2 5 7 9 12 14 16 19 21 23 26
Hyd No. 1 Time (hrs)
1
13
Hydrograph Plot
Hydraflow Hydrographs by Intelisolve Friday, Nov 7 2008, 11:22 AM
Hyd. No. 1
Pre DA -WETLAND
Hydrograph type = SCS Runoff Peak discharge = 39.10 cfs
Storm frequency = 10 yrs Time interval = 2 min
Drainage area = 11.79 ac Curve number = 75
Basin Slope = 0.0% Hydraulic length = 0 ft
Tc method = USER Time of conc. (Tc) = 20 min
Total precip. = 5.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Hydrograph Volume =122,425 cuft
Q (cfs)
40.00
30.00
20.00
10.00
Q (cfs)
40.00
30.00
20.00
10.00
0.00 ' - ' ' ' ' 0.00
0 2 5 7 9 12 14 16 19 21 23 26
Hyd No. 1 Time (hrs)
Pre DA -WETLAND
Hyd. No. 1 -- 10 Yr
3
q
Hydrograph Plot
2
Hydraflow Hydrographs by Intelisolve
Hyd. No. 2
Post DA -WETLAND
Hydrograph type = SCS Runoff
Storm frequency = 2 yrs
Drainage area = 3.30 ac
Basin Slope = 0.0%
Tc method = USER
Total precip. = 3.50 in
Storm duration = 24 hrs
Friday, Nov 7 2008, 11:22 AM
Peak discharge = 7.42 cfs
Time interval = 2 min
Curve number = 79
Hydraulic length = 0 ft
Time of conc. (Tc) = 10 min
Distribution = Type II
Shape factor = 484
Hydrograph Volume = 19,345 cuft
Q (cfs)
8.00
Post DA -WETLAND
Hyd. No. 2 -- 2 Yr
6.00
4.00
2.00
Q (cfs)
8.00
6.00
4.00
2.00
0.00 ` 0.00
0 2 5 7 9 12 14 16 19 21 23 26
Hyd No. 2 Time (hrs)
157
Hydrograph Plot
Hydraflow Hydrographs by Intelisolve Friday, Nov 7 2008,11:22 AM
Hyd. No. 2
Post DA -WETLAND
Hydrograph type = SCS Runoff Peak discharge = 15.39 cfs
Storm frequency = 10 yrs Time interval = 2 min
Drainage area = 3.30 ac Curve number = 79
Basin Slope = 0.0% Hydraulic length = 0 ft
Tc method = USER Time of conc. (Tc) = 10 min
Total precip. = 5.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Hydrograph Volume = 39,983 cuft
Post DA -WETLAND
Q (cfs) Hyd. No. 2 -- 10 Yr Q (cfs)
18.00
15.00
12.00
9.00
6.00
3.00
0.00
18.00
15.00
12.00
9.00
6.00
3.00
0.00
0 2 5 7 9 12 14 16 19 21 23 26
Hyd No. 2 Time (hrs)
4
1(0
Hydrograph Plot
Hydraflow Hydrographs by Intelisolve Friday, Nov 7 2008, 2:36 PM
Hyd. No. 3
Pond Discharge
Hydrograph type = Manual Peak discharge = 1.49 cfs
Storm frequency = 2 yrs Time interval = 2 min
Hydrograph Volume = 308,289 cult
Pond Discharge
Q (cfs)
Hyd. No. 3 -- 2 Yr
2.00
1.00
0.00
Q (cfs)
2.00
1.00
0.00
0 10 19 29 39 48 58 68 77 87 97
Hyd No. 3 Time (hrs)
1
1-7
Hydrograph Plot
Hydraflow Hydrographs by Intelisolve Friday, Nov 7 2008, 2:36 PM
Hyd. No. 3
Pond Discharge
Hydrograph type = Manual Peak discharge = 6.61 cfs
Storm frequency = 10 yrs Time interval = 2 min
Hydrograph Volume = 539,121 cuft
Pond Discharge
Q (cfs) Hyd. No. 3 -- 10 Yr Q (cfs)
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
0 10 19 29 39 48 58 68 77 87 97
Time (hrs)
Hyd No. 3
2
le