Loading...
HomeMy WebLinkAbout20060629 Ver 1_More Info Letter_20081110O?OF WATF?9oG Michael F. Easley, Governor .y William G. Ross Jr., Secretary ?- North Carolina Department of Environment and Natural Resources D U- G -i 'C Coleen H. Sullins, Director Division of Water Quality November 10, 2008 DWQ EXP No. 06-0629 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED A.B. Perry Construction Attn: Mr. Brian Perry 5600 Rock Service Station Road Raleigh, NC 27603 Subject Property: Hilltop Pointe Estates, Fuquay-Varina, NC EXPRESS REVIEW PROGRAM NOTIFICATION Dear Mr. Perry: On June 6, 2006, the Division of Water Quality (DWQ) issued your 401 Water Quality Certification and Authorization Certificate per the Neuse River Buffer Protection Rules as required to construct the residential subdivision on the subject property. Within the approval letter that you received, there are conditions that read: 1.. Notification of Construction The applicant and/or authorized agent shall contact the DWQ Express Review Program in writing at the letterhead address within ten (10) days of the commencement of construction. 2. Certificate of Completion "Upon completion of the project, the Applicant shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. Please send photographs upstream and downstream of each culvert site to document correct installation along with the Certificate of Completion form." Please return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 3. Resolution of the Notice of Violation The restored buffer shall be monitored for three (3) years. Two (2) copies of an annual report shall be submitted-one to the attention of the DWQ Raleigh Regional Office, and one to the attention of Ms. Cyndi Karoly, DWQ Central Office. This is a part of the Express Review Program that is required to ensure compliance during construction and post construction. Therefore, if you have begun construction of your project or have completed your project, you are required to notify this office in writing by January 1, 2009. If you do not notify this office in writing and construction has started, you are in violation of the Water Quality Certification Rules 401 Oversight / Express Review Permitting Unit t 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/ncwetlands Nre ohCarolina Naturally An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper A.B. Perry Construction Page 2 of 2 November 10, 2008 as required by 15A NCAC 2H .0507(c). Additionally, your annual riparian buffer monitoring reports must be submitted to this office for the past two years. This letter is to notify you and make you aware of the conditions that are in the Water Quality Certification issued within the Express Review Program. Please call Lia Myott Gilleski at (919) 733- 9502 if you have any questions regarding this matter. Sincerely, 4"4 , /jam Cyndi B. Karoly, 401 Oversight/Express Review Permitting Unit CBK/Img Enclosures: Certificate of Completion cc: File Copy Matt Matthews, DWQ Branch Manager Debbie Edwards, S&EC, 11010 Raven Ridge Road, Raleigh, NC 27614 Filename: 060629HilltopPointeEstates(W ake)EXP+NOT. doc C\ ¦ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ¦ Print your name and address on the reverse so that we can return the card to you. ¦ Attach this card to the back of the mailpiece or on the front if space permits. A. Sign t re\\ B. Recei ive A ?? If Y?9` J Agent ? Addressee a ) C. Date of Delivery efs ` ??9 3oi? di i t from item 1? El Yes rv ess below- ? No 1. Article Addressed to: A.B. Perry Construction Attn: Mr. Brian Perry 5600 rock Service Station Road Raleigh,NC 27603 DWQ# 06-0629-Wake . s 1c - ied Mail Express Mail Registered Return Receipt for Merchandise ? Insured Mail C.O.D. 4. Restricted Delivery? (Extra Fee) ? Yes 2. Article Number (rransfer from service lab 7008 1830 0003 8753 2188 UNITED STATE&J QsTAL SERv1CE; • Sender: Please print your name, address, and Zl01irrNs box 4 NC DENR Division of Water Quality 401 Oversight/Express Unit 2321 Crabtree Boulevard, Suite 250 Raleigh, NC 27604 1t?11?1}i?lii}l??}fifllFlfl?!{1l?i1tl?ilFl11!llflf?i)f!tf??l?