Loading...
HomeMy WebLinkAbout20081585 Ver 1_More Info Received_20081107DWQ Project #08-1585 Subject: DWQ Project #08-1585 From: "Theresa Simmons" <tmsimmons@matternandcraig.com> Date: Mon, 27 Oct 2008 16:33:03 -0400 To: <laurie.j.dennison@ncmai1,net> CC: "'Seth Hendler" <SHendler@ashevillenc.gov>, "'Dana Bolden"' <djbolden@matternanderaig.com> Ms. Dennison, I am emailing to let you know that we will be sending in the additional information and correct permit fee for the Reed Creek Greenway. I received the request for additional information today and am working to get the requested items out by the end of the week or early next week. If you should have any additional questions please feel free to contact me at the number below. Thank you and have a nice afternoon, Theresa M. Simmons, E.I. Project Engineer Mattern & Craig, Inc. 12 Broad Street Asheville, NC 28801 828-254-2201 828-254-4562 (fax) tmsimmons@matternanderaig.com www.matternanderaig.com 1 of 1 10/28/2008 7:04 AM J. Wayne Craig Michael S. Agee Steven A. Campbell Randy W.Beckner Bradley C. Craig Wm. Thomas Austin Z(kSJ1N E Mattern & Craicf CONSULTING ENGINEERS- SURVEYORS 000 - 1s 8S David P. Wilson James B. Voso Edwin K. Mattern, Jr. (1949-1982) Sam H. McGhee, III (Retired) Gene R. Cress (Retired) Stewart W. Hubbell (Retired) .,PAID October 27, 2008 Ms. Cyndi Karoly Division of Water Quality, 401/Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 ?pd? 9 Npv ?, 2 2Q?$ VrODS WID RE: Nationwide Permit DWQ Project #08••1585 Reed Creek G.reenway Trail Buncombe County, NC Comm. No. 2856D Dear- Ms. Karoly, Please find enclosed four (4) additional copies of the DWQ/NW 14 Permit application sets per your request. Also enclosed is the application fee for $570.00. We look forward to your timely review and approval of this application. If you have any questions or concerns please don't hesitate to contact me at tmsimmons2matternanderai .com. Sincerely, TTERN & CRAIG, INC. Theresa M. Simmons. E.I. Attachments as noted. 12 Broad Street Asheville, NC 28801 (828) 254-2201 Fax (828) 254-4562 www. matternandcraig. cold Is this an after-the-fact permit application? Yes ? No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwctlands. If no, please provide a short narrative description: XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). v Applicau /Ageni's?Signature DAte (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 13 of 13