HomeMy WebLinkAbout20081585 Ver 1_More Info Received_20081107DWQ Project #08-1585
Subject: DWQ Project #08-1585
From: "Theresa Simmons" <tmsimmons@matternandcraig.com>
Date: Mon, 27 Oct 2008 16:33:03 -0400
To: <laurie.j.dennison@ncmai1,net>
CC: "'Seth Hendler" <SHendler@ashevillenc.gov>, "'Dana Bolden"' <djbolden@matternanderaig.com>
Ms. Dennison,
I am emailing to let you know that we will be sending in the additional information and correct permit fee for the Reed Creek
Greenway. I received the request for additional information today and am working to get the requested items out by the end of
the week or early next week. If you should have any additional questions please feel free to contact me at the number below.
Thank you and have a nice afternoon,
Theresa M. Simmons, E.I.
Project Engineer
Mattern & Craig, Inc.
12 Broad Street
Asheville, NC 28801
828-254-2201
828-254-4562 (fax)
tmsimmons@matternanderaig.com
www.matternanderaig.com
1 of 1 10/28/2008 7:04 AM
J. Wayne Craig
Michael S. Agee
Steven A. Campbell
Randy W.Beckner
Bradley C. Craig
Wm. Thomas Austin
Z(kSJ1N
E
Mattern & Craicf
CONSULTING ENGINEERS- SURVEYORS
000 - 1s 8S
David P. Wilson
James B. Voso
Edwin K. Mattern, Jr. (1949-1982)
Sam H. McGhee, III (Retired)
Gene R. Cress (Retired)
Stewart W. Hubbell (Retired)
.,PAID
October 27, 2008
Ms. Cyndi Karoly
Division of Water Quality, 401/Wetlands Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
?pd? 9
Npv ?, 2 2Q?$
VrODS WID
RE: Nationwide Permit
DWQ Project #08••1585
Reed Creek G.reenway Trail
Buncombe County, NC
Comm. No. 2856D
Dear- Ms. Karoly,
Please find enclosed four (4) additional copies of the DWQ/NW 14 Permit application sets per
your request. Also enclosed is the application fee for $570.00.
We look forward to your timely review and approval of this application. If you have any
questions or concerns please don't hesitate to contact me at tmsimmons2matternanderai .com.
Sincerely,
TTERN & CRAIG, INC.
Theresa M. Simmons. E.I.
Attachments as noted.
12 Broad Street Asheville, NC 28801
(828) 254-2201 Fax (828) 254-4562
www. matternandcraig. cold
Is this an after-the-fact permit application? Yes ? No
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development which could impact nearby downstream water quality? Yes ? No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http://h2o.enr.state.nc.us/ncwctlands. If no, please provide a short narrative description:
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
v Applicau /Ageni's?Signature DAte
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 13 of 13