Loading...
HomeMy WebLinkAbout20081213 Ver 2_Stormwater Info_20081110¦ Stormwater Management Calculations South Tract City Boulevard Development Prepared for: Crescent Resources, LLC 400 S. Tryon Street, Suite 1300 Charlotte, North Carolina 28202 © Kimley-Hom and Associates, Inc. 2008 ? ? ? Kimley-Horn and Associates, Inc. o ? G o08 OS 9 S5I This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific ' purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Hom and Associates, Inc. shall be without liability to Kimley-Hom and Associates, Inc. ' SOUTH TRACT CITY BOULEVARD DEVELOPMENT CHARLOTTE, NORTH CAROLINA ' STORMWATER MANAGEMENT CALCULATIONS Prepared for: Crescent Resources, LLC 400 S. Tryon Street, Suite 1300 Charlotte, North Carolina 28202 r ' Prepared by: Kimley-Horn and Associates, Inc. ' 4651 Charlotte Park Drive, Suite 300 Charlotte, North Carolina 28217 C A R O : Q S A O ' NOVEMBER 2008 KHA Ref: 018253026 TABLE OF CONTENTS OVERVIEW SITE MAPS SITE VICINITY MAP SCS SOIL SURVEY FEMA FIRM PANEL WATERSHED MAPS PRE-DEVELOPMENT WATERSHED MAP POST-DEVELOPMENT WATERSHED MAP WATER QUALITY WET POND CALCULATIONS ANTI-FLOTATION DEVICE CALCULATIONS VOLUME AND SURFACE AREA TABLES WET DETENTION BASIN SUPPLEMENT FORMS WATER QUANTITY CURVE NUMBER CALCULATIONS TIME OF CONCENTRATION CALCULATIONS HYDROCAD HYDROLOGY REPORT STORMWA TER M,4NAGEA ENT CALCULATIONS i South Tract city Boulevard Development, Charlotte, NC OVERVIEW ' Background This report contains the approach and results of a stormwater analysis conducted for the South Tract City Boulevard Development. The 41-acre project site is located in the south east quadrant of the interchange of Interstate 85 and City Boulevard in the City of Charlotte (see vicinity map). The site has been mass graded per City of Charlotte permit number GRS-2007223. ' Existing Conditions 1 1 The existing on-site conditions (before mass grading) consisted of woods and meadow therefore this ground cover was used in the analysis. The site topography varies from elevation 770 ft to elevation 720 ft. Site runoff discharges into an existing stream in the middle portion of the site. This stream drains to a culvert under City Blvd. Floodplain/Floodway The proposed site does not lie within a 100-year floodway boundary as determined by FIRM Panel # 3717900070C. Water Quality Water quality treatment by means of permanent Best Management Practices (BMP's) will be provided using two wet ponds as treatment. The ponds are designed to treat the first inch of runoff per the Stormwater Model Ordinance for North Carolina and will draw down over a period of two to five days. Wet Detention Basin 1 and Wet Detention Basin 2 have been designed to provide a minimum 90% average annual removal of Total Suspended Solids (TSS). Water Quantity The proposed wet detention ponds have been designed to address the water quantity requirements to match pre- and post-development peak runoff rates for the 1-year, 24-hour storm events. (These ponds will also control the peak runoff rates for the 10- and 25-year, 6-hour storm events per the City of Charlotte rezoning notes on Petition 2006-155. However, these water quantity requirements will be reviewed by the City of Charlotte when the site develops.) The 100-year, 24-hour storm event was checked for 6" of freeboard at the top of bank. Results Pre-development 1-yr, 24-hr storm Post-development 1-yr, 24-hr storm DA-1 2.63 cfs 1.00 cfs DA-2 1.57 cfs 1.43 cfs ' STORMWA TER MANAGEMENT CALCULATIONS South Tract City Boulevard Development, Charlotte, NC Conclusion The proposed wet detention basins were designed using methods prescribed by the aforementioned resources. HydroCAD software was utilized to evaluate the pre-development and post-development flow rates. HydroCAD utilizes TR-55 methods of calculating times of concentration (based on sheet, shallow concentrated, and channelized flows) and SCS curve number method of generating hydrographs (results are provided in Appendix C). Based on the analyses provided herein, the proposed system will be adequate to address the stormwater requirements of the North Carolina Department of Environment and Natural Resources, Division of Water Quality. STORMWA TER MANAGEMENT CALCULATIONS South Tract City Boulevard Development, Charlotte, NC Ki\CHL-LDEV\018253 Crescent\022\1Parcel J\Cnlculntlons\Eroslon Control\Solls and Vlclnlty Mnp.dwg C? L ' m CRESCENT RESOURCES VICINITY MAP FIGURE ?mrl Kimley-Horn and Associates, Inc. SOUTH TRACT PARCEL NTS 1 ' TMS DOCUMENT. TOGETHER RLTH THE CONCEPTS AND DE9GS PRESENTED HEREK AS AN INSTRUMENT OF SERVICE, IS INTENDED OILY FOR THE PURPOSE AND CLIENT FOR NEYCII IT WAS PREPARED. REUSE OF AND WPROPER RELIANCE ON THIS DOGAIDR WITHOUT NUrIEN AUMMZA71ON AND ADAPTATION BY IOYtEY-NORM AND ASSOCIATES. INC SHALL BE WTHOUT LIABILITY TO M LEY-HORN AND ASSOCIATES INC. rlmm0 CRESCENT RESOURCES SCS SOIL SURVEY FIGURE Kimley-Horn and Associates, inc. SOUTH TRACT PARCELS NT$ 2 TILS DOMMENT. TOGETHER RTTI THE OONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN NSIRUWNT OF SERVICE, IS INTENDED ONLY FOR THE PURPOSE AND CLIENT FOR NXCH IT WAS PREPARED. REUSE OF AND NPROPET RELIANCE ON THIS DOQRIENT IMTHOUT NWf1EN AUTHORIZATION AND ADAPTATION BY pMIEY-HORN AND ASSOgA7E3. INC. SHAH BE VATHOUT LIABILITY TO RIYIEY-HORN AND ASSDUATS. NO 1 1 1 1 1 1 1 1 1 1 1 1 1 dg N y C 3 m DJ D N `• y t a C N G U y E v o E D O y _ oD c ?LLL C a. D vm o ? Q n _ „rho 0 fd U D m y c 7 Z D 0 d d 4 3 fn LO 'o 2 wi .00 lo- U Cc a? U*) `e aE?op c _ C4 X V mEmLL y E T- c`c< CL ? z Q N C C r W p c W o??3LL 1. aO t C Y O-p Q ° mH ?e-Y o W U m ?-O Z U) o?EmL ?LL >iIL u O y dcPda Q E N C E m m LL o D C 0-6E O C R` D Y c y m r c o E Y N m N N d O N N N p! p a0 ?3 `cod N v w i?\ .\ ?` \ Q? Z N CL p, q . OZ ; y ,r rr \ \ \? o 6, ' ' Z ?.? , Z V? 1560 y 664 a r? x O J W uj z > pLL x a 6 N Z' D? 5 x co ?cb , . C?? -? N ? x q Z? `° Z5 J ,? ?o ,? O? N` z C j LL ° 3- ... p W ?•. u G O y y g .p=„ o m d' Q O v Q °?o 'G O 0 N OD ? W W z a N o a?? w ? = a m ! Q Z °t > L.? 2 00 Z z ? a . 0 w Q ? oC = W p Psi o 0 o ?- i nog "_ °µc'a` "°ae. } ?` C3 d ? W U U ? ?_ m ? ` `fie E C ? '?+ Q ? O W F J ? Z ? 0= °° 4 O z u=? 5 ? {? ur i ? Q Q a w o o v e 6a ?®? 9 ? Q ? d o o c 1 1 1 IaDm U g' E ? H WV a' m D a ?``Q Q ? try o H } I :°° °°'s ?! ~°o a mc ?O ¢ON ? E?voE .. m ? a o Itl W O w ! p F z n ? crmaa E G)-Q In m N i Q W O En °3? a mo ove ?? u uj C m ?zD m0 mV5 _ 7 p l U V a ?.,? c? p i LWt? m v.9 mm am a N W a O O o p? ,m ? ° ? d 0 E$? o m D 7 C Oro = r Q D. j = a t?? Cq Z U W VUy X r u i as o 'go 2 D S D B U m and <°_ Ep M "`ntt u a?µ en v a E E U. ap`Q `o m c? ? F* C? IL = - . E r a ob Q . 1 o U A ?+ 2 t- W 3 f3 ` l t= m - = u b'k, a"? u '"` nOtE-C Cl) O Z. ?" u U Z C ou[ Q u o a y V u F s ASE ? ° ? o oaH I O L . .: . u z ? W I a ? E ?•ti z ° u - O y d 0ou D In Q C ® ; .c m E 0 z C C G E P O C® 9 Y C @10 ? Y @ 9 r m D O o? LL D D o E 0 m 9o m m m0E? U _mma aD a0 ?3oa m Q o 9 0 0 0 0 0 0 o v v a m m m ^^^^^ m m m o 0 o In cv _m _w m m _a _m m m m w m m m m m > a < ' Q LL C O V m m m fq m co m m m m m t7 ID m c, Ih ro 19 iD 0 ID 1A 10 ID m ID N N N N N N N N m w m m m U N N N N N v D: / ? ._ • ?•• \\ -- m? Q m m m m m ^ m m m !0 ^ m co 10 N ^ m^ N m Q m¢ ^ D - O m m m m m a Q ID m (7 N m O ^ a m N m m 10 1D c O ,? `? • m m r m m V m F N a N n I N N (7 ID m m m ^ N^ N n ^ N N l`7 m m m 10 m ID m ID d &? ? ` 0 w w w = \ ?` v eb 0 w w w . b D' m- U U U o c ../ ?L J D m LL } Q m U O W LL CJ =- 7 Y J } Q} Q m U O W LL (,'J S Y u m m co -?ls WO HDnoi-ino:)w b s?' \ N ` D?7. N'1 ?,` •` \ \\ x c W C, V. cr) LU W W a ? LY ° OQ °X' N o N O C=D L D- 'o v E` 6 j Ln u O A 7 D C a° O >LL D y y C D N U O 0 O LO II 11J J Q U C0 0_ i d P K n$ LY^ W ??. `cf ?. i D '? v] D y - LL Q7 F, O u m C Q N u ... i9m I g5 Z^ ??' 6 Z ? d _ 1A W I L? ',Z. a e N o o L.J = 7 W W _ as '° ti o: m ° LL o b m r C? d' F ¢ Fin e. ? 0 m W U O ? c •.? u _' , N? h•Y r D 4y ° `MGM ?o??. b C H % FII C p u U D v s o p: m o ? . ? U In Z ? z C c a i F g z Y e° t o i F ? Q LaJ ? D s ++ • ? °* I W + Y pp LL. i z C ? S f SS w a r 9 ' ® 0 6 Q a o 06 MIMI 1@1 OUT a W L) '.1 Luf cr. C> o4f/ q m 6 E D N v a 102- D E v o E V m DLL c ? Y d « 2- « m 0 C D m m m c ?Z D m 7 "' m O WS m O a V .? ? m 4amm? O m m p V m m m O EE LL cj? Q o m m c ccap?«w Y J Y 7 L D C m D v a0L D `of E mz LL L D o C, -D _ DcLmr. m 3 $ m mom E m E:cLL D °6E C 6 y Y m S c D E m m m m D C7 C `?, by ?, ? 0 ^ \ \\\\ ?\\\ \' '\\? \ L O N \ `?' `' O M N 4? 0 PRE-DEVELOPMENT ' WATERSHED MAP ' STORMWA TER MANAGEMENT CALCULATIONS South Tract City Boulevard Development, Charlotte, North Carolina ? ` ! ?Sg E tO 4 a Y sq ° e ??? ? 88ZBZ0N'31101UVH0 OOEL'31S'133U1S NOAUI'5001, 011 630Uf1063U 1N3363U0 ZBZBZ'VNIWUV3 HIUON 1.1Nf10O9N11SN3lNO3W'31101UVHO 'OAIB A113 ONV 58.1 uJ `S N ?' dVW V311V ` ° d m t I I 3OVNIVH0IN3WdOl3A3O-3*dd \/ ? E le ? SNV ld 1N3W30VNVW V31VMWVOIS m m c sz a? ? o a MVI Na3N1f1OS • 31VOI39 i Q ? u a r ? Z z // \\/,, f?/ /1 S LLJ 1..L1 w U o F. ?> ? t i i ErJ? . r U s ?$ -- 9 a - ?r n•wa\wiun•n?\ww ?ww•sewn ..?o.w,.?s •?onna\•?•nna szo\?•••••n ccroioWO'r'iw\s 0 POST-DEVELOPMENT WATERSHED MAP 1 1 STORMWA TER MANAGEMEATT CALCULATIONS South Tract City Boulevard Development, Charlotte, North Carolina -RIM. Uv0 'Of1 110 ?j w ¦ ? 931S 'ON'311 ' ZBZBZ VNO HINON Q OOEL'316 '133H16 NOAUi NOAMl6006 A1N000'Ol18N3T4031N03W'9'3-101tltlH0 `V Z Jll'S30Ll1063L 1N3063tl0 'OAIa ALIJ ONV 9B-I g E ?4 F dVW V3NV 1 DTI 3JVNIVa01N3WdOl3A30-1SOd X m o C J SNVId iN3W3f)VNVW V31VMWHOLS a /\ ?? Ya8iy o a 19V111 NVBHinos • 31V013e 1 1 a a»roe :ruu ui Q z w CD LLJ J W Q z Q Q 0 W U o a o z 0 I I I I SZE 'Y NORNE poLIC RAN ? I 1 ( I ' r l s b !I 4 sew ?• ? - P I -t^ f , u U v ,. u o Q 1- 0i i ? ? *0? I n, ? y.l L /I ? ? ? I f y Jt 4x? t t ¦ : t? J r ? I ? r • - LrJ ? n ,. I I! ,K ? y k ¦` C L? - _ s I -------- _ I ;vv 1 Z Q O ¦ i I.. --4--,-•-_.. Z L6 N 4 U lul f QQ 1 O Z ''I + - 7- i i 17 f, i s. f} , s /....,\ I I N 00 I i it s ,, \ I U II O ?t'I ?I I N Q Z 4 I?'IL n i I? I LLJJ IILLJJII 7 -, - _ _ r? ? l? I -r 5 ? ?? ? I I I - I I I.. ? 1 I I I ?I '1 • I ? ?I ? _ ? I I I I I ? r' I I ? ?I I I I a Am, I 1 7 I As. _ • . .... . I I ; I I 1' I' 7,,,, \ 3 line an -m t _ y 77 - ?- _ Ri .. 1{ L: ?O?I?? ® ???? e t ? V ? I • '--o, -::....:. ? ...._• -? ?e ? •.avi•.re ocovW...r, roeo?ounr,w?:. D WET POND CALCULATIONS ' STORMWA TER MANAGEMENT CALCULATIONS South Tract City Boulevard Development, Charlotte, North Carolina 1 Kimley-Horn and Associates, Inc. WET DETENTION BASIN Project Information Project Name: Belgate - Southern Tract KHA Project #: 018253026 Designed by: BRR Date: 10/8/2008 Revised by: BRR Date: 10/27/2008 Revised by: Date: Site Information Sub Area Location: Drainage Area 1 Drainage Area (DA) = 7.2 Acres Impervious Area (IA) = 5.8 Acres Percent Impervious (1) = 80.0 % Required Surface Area Permanent Pool Depth: 4.25 ft SA/DA = 3.65 (90% TSS Removal via Pond) Min Req'd Surface Area = 11448 sf (at Permanent Pool) Required Storage Volume: Design Storm = 1 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 + . 009 (1) = 0.77 in/in Storage Volume Required = 20125 cf (above Permanent Pool) Elevations Area (s.f.) Bank Elevation = 732.00 ft Top of Pond Elevation = 732.00 ft ' Temporary Pool Elevation = 727.60 ft 16,278 Permanent Pool Elevation = 726.00 ft 11,541 Shelf Beginning Elevation = 726.50 ft Forebay Weir = 728.00 ft Shelf Ending Elevation = 725.50 ft Bottom Elevation = 718.00 ft ' Wet Basin Areas/Volumes Area @ Top of Temporary Pool = 16278 sf (Elevation = 727.60) Area @ Top of Permanent Pool = 11541 sf (Elevation = 726.00 ) Volume of Temporary Storage = 22255 cf Side Slopes of Pond = 3 :1 Side Slopes of Shelf = 1 0 :1 Side Slopes of Pond (below shelf) = 3 :1 ' Is Permanent Pool Surface Area Sufficient (yes/no)? Yes ( 11541 > 11448) sf Volume of Storage Provided 22255 cf ' Total Volume Sufficient (yes/no)? Yes Orifice Size = 2.30 inches i WET DETENTION BASIN Project Information Project Name: Belgate - Southern Tract KHA Project #: 018253026 Designed by: BRR Date: 4/1/2008 Revised by: Date: Revised by: Date: Site Information Sub Area Location: Drainage Area 1 Drainage Area (DA) = 7.2 Acres Impervious Area (IA) = 5.8 Acres Percent Impervious (1) = 80.0 % (Drainage Area) Orifice Sizing Q2 Days = 0.1288 cfs Q5 Days = 0.0515 cfs Orifice Size = 2.30 in Q orifice = 0.098 cfs Drawdown Time = 2.6 days (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) less than 5 days (yes/no) ? yes greater than 2 days (yes/no) ? yes Orifice Equation: Q=CAgd(2gh) Q2 < Q < Q5 c = 0.6 A9= Area of Pipe = n/4D2 g = gravity = 32.2 ft/s2 h = orifice head = 1/3 (TPE-PPE-1/2D) TPE = Temporary Pool Elevation PPE = Permanent Pool Elevation D = Diameter 1 1 1 1 1 1 1 1 1 1 1 1 1 KimleyHorn CE" and Associates, Inc. WET DETENTION BASIN Project Information Project Name: Belgate - Southern Tract KHA Project #: 018253026 Designed by: BRR Date: 10/8/2008 Revised by: BRR Date: 10/19/2008 Revised by: Date: Site Information Sub Area Location: Drainage Area 2 Drainage Area (DA) = 23.9 Acres Impervious Area (IA) = 16.1 Acres Percent Impervious (1) = 67.5 % Required Surface Area Permanent Pool Depth: 4.25 ft SA/DA = 2.975 (90% TSS Removal via Pond) Min Req'd Surface Area = 30985 sf (at Permanent Pool) Required Storage Volume: Design Storm = 1 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 +.009 (1) = 0.66 in/in Storage Volume Required = 57036 cf (above Permanent Pool) Elevations Area (s.f.) Bank Elevation = 725.00 ft Top of Pond Elevation = 725.00 ft Temporary Pool Elevation = 720.70 ft 39,047 Permanent Pool Elevation = 719.00 ft 31,750 Shelf Beginning Elevation = 719.50 ft Forebay Weir = 722.00 ft Shelf Ending Elevation = 718.50 ft Bottom Elevation = 712.00 ft Wet Basin Areas/Volumes Area @ Top of Temporary Pool = 39047 sf (Elevation = 720.70) Area @ Top of Permanent Pool = 31750 sf (Elevation = 719.00) Volume of Temporary Storage = 60177 cf Side Slopes of Pond = 3 : 1 Side Slopes of Shelf = 1 0 : 1 Side Slopes of Pond (below shelf) = 3 : 1 Is Permanent Pool Surface Area Sufficient (yes/n o)? Yes ( 31750 > 30985) sf Volume of Storage Provided 60177 cf Total Volume Sufficient (yes/no)? Yes Orifice Size = 2.70 inches r 1 1 1 1 WET DETENTION BASIN Project Information Project Name: Belgate - Southern Tract KHA Project #: 018253026 Designed by: BRR Date: Revised by: Date: Revised by: Date: Site Information Sub Area Location: Drainage Area 2 Drainage Area (DA) = 23.9 Acres Impervious Area (IA) = 16.1 Acres Percent Impervious (1) = 67.5 _% (Drainage Area) Orifice Sizing Q2 Days = 0.3482 cfs (Flowrate required for a 2 day drawdown) Qs Days = 0.1393 cfs (Flowrate required for a 5 day drawdown) Orifice Size = 2.70 in (Diameter) Q orifice = 0.139 cfs Drawdown Time = 5 days less than 5 days (yes/no) ? yes greater than 2 days (yes/no) ? yes Orifice Equation: Q=cAgV(2gh) Q2 < Q < Q5 c = 0.6 A9= Area of Pipe = n/4D2 g = gravity = 32.2 ft/s2 h = orifice head = 1/3 (TPE-PPE-1/2D) TPE = Temporary Pool Elevation PPE = Permanent Pool Elevation D = Diameter 10/19/2008 ANTI-FLOTATION DEVICE CALCULATIONS 1 STORMWA TER MANAGEMENT CALCULATIONS South Tract City Boulevard Development, Charlotte, North Carolina 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 P-=FJ mole}-H- IN.- WASOa W,1. Project Information Pond 1 NCDENR ANTIFLOATATION DEVICE DESIGN CALCULATIONS (per NCDENR Manual) Project Name: Belgate - Southern Tract KHA Project #: 018253026 Designed by: BRR Date: 11/3/2008 Revised by: Date: Revised by: Date: Revised by: Date: Drainage Area Information: Drainage Area (ac) = 7.20 Flow (Qs) (cfs) = 12.8 Storage Dimensions: Basin Side Slopes LX: 1 ) = 3.0 (3:1 max side slopes) Storage Depth 'R' (ft) = 8.0 Top of Basin Elevation Temporary Pool Elevation Permanent Pool Elevation Bottom of Basin Elevation Elev (it) Area SF Cumulative Volume (CF) 732.00 27,972 730.00 23,807 125,006 727.60 16,278 76,904 726.00 11,541 54,649 723.00 8,218 25,011 720.00 4,215 6,361 718.00 2,146 0 Sizing of Antiflotation Block: Control Structure Length (in) = 48 Control Structure Width (in) = 36 Riser Area (sf) = 12.00 (Check riser geometry vs. area equation) Volume of Water Displaced (of) = 96.0 Weight of Water Displaced (lb) = 5,990 Min. Required Weight of Anchor Block (lb) = 6,589 (1.1 factor of safety) Anchor Size: Width (If) = 4.4 Length (If) = 4.4 Height (If) = 4.D0 Weight of Anchor (lb) = 6,784 O.K. - Minimum Required Weight Sizing of Emergency Spillway: Q50 (ds) = 12.8 Q.N..y (ds) = 12.8 (Riser ignored) Water Depth Over Spillway (ft) = 0.5 Spillway Length (ft) = 15.0 (10 ft minimum spillway length, Cw=2.7) Spillway Crest Elevation (ft) = 730.5 (1 it min. above sediment storage depth) Freeboard (ft) = 1.04 (1 ft minimum) Page 1 of 1 t 1 1 1 1 1 1 1 1 1 1 1 1 1 i 1 1 `? 8b 0.SSOO8IPS, IK. NCDENR ANTIFLOATATION DEVICE DESIGN CALCULATIONS (per NCDENR Manual) Project Information Project Name: Belgate - Southern Tract KHA Project #: 018253026 Designed by: BRR Date: 11/312008 Revised by: Date: Revised by: Date: Revised by: Dale: Pond 7 Drainage Area Information: Drainage Area (ac) = 23.90 Flow (Q.) (cfs) = 16.7 Storage Dimensions: Basin Side Slopes LX-: 1 ) = 3.0 (3:1 max side slopes) Storage Depth *R' (ft) = 7.0 Elev (ft) Area (SF) Cumulative Volume (CF) Top of Basin Elevation 725.00 60,143 723.00 53,616 319,446 Temporary Pool Elevation 720.60 38,785 208,565 Permanent Pool Elevation 719.00 31,750 152,137 716.00 22,055 71,429 714.00 17,794 31,580 Bottom of Basin Elevation 712.00 13,786 0 Sizing of Antiflotation Block: Control Structure Length (in) = 48 Control Structure Width (in) = 36 Riser Area (sf) = 12.00 (Check riser geometry vs. area equation) Volume of Water Displaced (cf) = 84.0 Weight of Water Displaced (lb) = 5,242 Min. Required Weight of Anchor Block (Ib) = 5,766 (1.1 factor of safety) Anchor Size: Width (If) = 4.1 Length (If) = 4.1 Height (If) = 4.00 Weight of Anchor (lb) = 5,890 O.K. > Minimum Required Weight Sizing of Emergency Spillway: Q? (cfs) = 16.7 Q...,y (cfs) = 16.7 (Riser ignored) Water Depth Over Spillway (ft) = 0.5 Spillway Length (ft) = 40.0 (10 It minimum spillway length, Cw=2.7) Spillway Crest Elevation (ft) = 723.7 (1 ft min. above sediment storage depth) Freeboard (ft) = 1.01 (1 ft minimum) Page 1 of 1 1 1 1 1 1 VOLUME AND SURFACE AREA TABLES ' STORMWA TER MANAGEMENT CALCULATIONS South Tract City Boulevard Development, Charlotte, North Carolina 0 c 16 c _m t0 •U = o a?i ¢ ? a Y m pp? u 00 O O N N O r fL Q) Q) 000 N m Co L Q 0) U (l L a CO N _w f 0 O i n -0 c m C? of co w E O c 0 R ai z? 0 z v a a ? Y ° c v v U D_ to N y Q1 > V) d L o M C) CL: of 0 D_ Y ` (L C V) f0 m c O c Q) v N v j E 1, N L U 7 0 -* lD n Xn N Ln Zt r\ <o N N c-I 1:T M V M Q M 00 -I y ri . j r N f L r C Ol a, "- ? ? H a) r I oN Ln N ? U O d -I . f Ln N V) 00 N _ v ? M Ln r, Dl e--I ei a--I N y > O F - U f6 N cn 01 n N [t V l0 fT M 00 00 :1, e-i 00 tp LD l0 Ln f0 0 0 0 0 0 0 O O O W v c o o o o 0 0 0 0 j Q R.0 N .•-? M f? ei fT O ? N r, N O N N l0 n M e1 Q `•-' N -tt l0 00 O N N m W 0 to O ei N M Ln LD n 00 0 c a 0 Qj L Qj f. Q? L fL D_ 0 O n 00 71 N CIO 1:31 O1 ail O Ln u fu ? a = 0 E I o Vl 2 > Q) O Y _0 > fn al E L L L O a) O LL. a LL v E C m r` Ln m to O 00 11 Ln N N rq 00 C14 r-I N fn Lj O C o O •--? N N m f? LO of r- r-I Lo ? cn Ln Ln O ? 'T 00 00 a' L/1 to 01 00 1.0 V) ?t Q O LD N N lD -4 f, V' N rl LO O f? : (?"1 O fT N r, 't > rl 11 N M -It -It Ln Ln l0 f, 00 0) r, f\ r-i e-i cu tD 0 l0 00 al co oo m v fl ro Ln r. o O o m r-1 Lfl m r-4 O -4 '1 of N LD 00 g Ln N N M -4 3 U o to lD fb r-I Ln N N N rl M ?t lD 'T 00 00 0) .. V N M 'tT Lo r, 00 00 IT Ln l0 r, fT lD of N l.0 f0 r-I N N N YO F- W fo m m 00 m c-f n n n l0 0l of O 1l -;T N Ln Ln e1 7 of 1:1* O r- LD Ln LD 00 00 00 Ln ct 00 M M O -4 LD M N ? fQ O O of O N a-1 m e, w -! 00 -! w e-1 O N LD N N M m n M m M O Ln Ch Ln of Ln ct lD O W- O O o o o o o O o O 0 0 0 0 0 0 0 0 Q Q f0 Lo Ln Ln l0 m 00 co co Ln tb ?' 0p m N N m N a Q1 w 00 Ln r-1 Ln lzr N O f\ O M o Ln rl L H v ,--f O N t n N N N of O W 0 1 Z Q N M 'tT Ln lD W 00 00 00 d' m LO ^ ?..,.? ?..{ r-I N N N N W Z 00 Q1 O --I N C? w m r-I N . N fV m N N to N Ln lD r4 ? o f? f N 00 Ql O .--? N W V N f? N n f? N n f? N n - N V n N fV t\ N t\ M n M f? m a 1 0 0 O µ 0 O Y 0 N D_ 0 D_ c fZ 0 c N L co .L Q) m 4-- E = 0 0 Q' f 0 E 0 ° 0 0 0 v W co CL f 00 M ICT 'IT LIB o - ri fL E O > c a, c fo E L cu a Q ul c N c fv E L 0) a U C m O S y m Q E- Y m ppp- N f0 N Q u w 7 N C [0 N E 7 O m d co O O N O O r O 0) 0) (o 6 N in cl 0 N N N IX O0 m O c O +r ?" v -0 -0 - 4- Z 0 0 (ii -a r c v v a o ? > a) Gi d d Y O CL` N E N ro m c O c a? v 0 N oo Ln m Ln Ln N N N D1 tT U 7 0 ^ ? M M N O O Q N l0 O tfl O O O O c i N N N E Ql 00 r-i N 00 m m -i r- rn rn r- O U O n d' ri Dl 00 00 - v N m 4 4 to lD 0 H to N rl 00 lD N d' co Ln o .o :* 0) Lu Ln r, 00 O N d* kDD V a O O O ri ri ri ri O O O o 0 0 0 J Q ? r, r, Ol w 1.0 L0 N LD i N O r- Ln L M m d' ln lD n m W cc o LL to l0 rl CO rn O ri N M ri ri ri r` eq N N N N 0 C 0 O o Q y aj u N E L a) D_ 0 m m 01 00 ri I I ri m ul ri rn 0) O r''! Oo 00 N ? r-I I I Q1 E Q v 0 E o in > 01 O . + 23 > N ? T r6 c t0 -0 m -0 a E a) LL D_ U- 0) m Ol m r? 00 ri ri m N Ln r\ N O r\ r, E ^ Ln m m " N 'l. ri Ol A 0) 0) N O r, r-4 O O ? O r` u? m m C) to m m Ln N ri m m t.0 Ii ri Q _ p ct ri O r-I ? a) m DD u1 M O N m c-I LD L6 Lf) m Ln r- m ri i m -I d• -I lD -I 00 -I ri N lD r-i I0 N N r r r r r N N N M M cT 01 M rl 1* V 00 O co m O 00 m m m O m n E c- r- r- ?* rl vi ri r, rl N oo m m oo r- m m _ 7 _ U O t\ N 00 O1 ri lzj? t!1 00 m r It oa ri O N d' O v r ? ? O m ? - 00 t.0 1-1 r-i co Ln ° > I r- I r -I ?V N N e -i r-I ri q N ri v -4 Ln LLn F- LU Ln 00 Ln r- M O O m am rn ? 'IT lD N Q1 ri r, r0 U LD H 00 L0 lD rl O l0 00 1* d' LD V' lD O Ln O a) 1-4 LD O Ln O In ci m N N Ln rn ri rl m O 00 J Q m r! v LA Ln LD LD r- 00 co 0o m m N m m O o o 0 o o o o o 0 0 6 0 o o r i r-i r-+ O Z LD oo rn Ln v rn m In ri D ri O O ri rn i r, ri ' v 1 Lo O m CL 2 N r- r, Dl 00 Ln O l N ^ Ln Ct r, Ln r, m rn r N ct O t co r 4 ri Ul ?t A Q v ro Ln r- (n C-4 N LA ,D co r i H N fV N m M M m m ?r LO LO w Z 0bD N m -7 In LD r\ co 00 M . A O N O ri N m Ln ro r-I r-I H ri H ri ri ri N r4 N N N N N W r, r, r, r, ^ r, ^ r- r, r- r- r, r, a 0 0 p V a w a N v } Q 0 0 Y c s to v ? ? Y U E c O 0 c v 0 E CL - f co 0 0 o E 0 d co a Q 0 H n rI O Q1 to M r, 00 ri M r1 a) I E >IV) cl c v v c c EI E vl v o_ o_ ' WET DETENTION BASIN SUPPLEMENT FORMS ' STORMWATER MANAGEMENT CALCULATIONS South Tract City Boulevard Development, Charlotte, North Carolina OTIMA Affl*W r_ A NCDENR Permit No. (to be provided by DWQ) o?oF W A rFRO? O T STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. L PROJECT INFORMATION Project name Belgate Southern Tract Contact person Beverly Rosenbloom, El Phone number 704-319-7699 Date 10/24/2008 Drainage area number 2 Ih DESIGN INFORMATION Site Characteristics Drainage area 1,041,519.60 ff2 Impervious area 702,622.80 f 2 % impervious 67.46 % Design rainfall depth 1.00 in Storage Volume: Non-SR Waters Minimum volume required 57,036.00 ft3 Volume provided 60,177.00 ft3 Storage Volume: SR Waters 1-yr, 24-hr runoff depth in Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations 1-yr, 24-hr rainfall depth 2.58 in Rational C, pre-development 0.28 (unitless) Rational C, post-development 0.74 (unitless) Rainfall intensity: 1-yr, 24-hr storm 0.12 in/hr Pre-development 1-yr, 24-hr peak flow 1.57 ft3/sec Post-development 1-yr, 24-hr peak flow 21.76 ft3/sec Pre/Post 1-yr, 24-hr peak flow control 20.19 ft3/sec Basin Elevations Basin bottom elevation 712.00 ft Sediment cleanout elevation 713.00 ft Bottom of shelf elevation 718.50 ft Permanent pool elevation 719.00 ft SHWT elevation 708.00 ft Top of shelf elevation 719.50 ft Temporary pool elevation 720.70 ft Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) II. DESIGN INFORMATION Volume and Surface Area Calculations SA/DA ratio 2.98 (unitless) Surface area at the bottom of shelf 27,740.00 ft2 Volume at the bottom of shelf 133,518.00 ft3 Permanent pool, surface area required 30,985.00 ff Permanent pool, surface area provided 31,750.00 ff OK Permanent pool volume 148,391.00 ft3 Average depth for SA/DA tables 4.67 ft OK Surface area at the top of shelf 35,931.00 ff2 Volume at the top of shelf 165,311.00 ft3 Forebay volume 28,095.00 ft3 Forebay % of permanent pool volume 18.93 % OK Temporary pool, surface area provided 39,047.00 ft2 Drawdown Calculations Treatment volume drawdown time Treatment volume discharge rate Pre-development 1-yr, 24-hr discharge Post-development 1-yr, 24-hr discharge Additional Information Diameter of orifice Design TSS removal Basin side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies 5.00 days OK 0.14 ft3/s 1.57 ft3/s OK 1.43 ft3/s OK 2.7 in 90 % 3.00 :1 OK 10.00 :1 OK 10.00 ft OK 4.10 :1 OK 3.20 :1 OK Y (Y or N) OK 1.40 ft OK N (Y or N) Design must be based on 90% TSS removal Y (Y or N) OK Y (Y or N) OK 24-HR EMERGENCY PUMP Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 Permit (to be provided by DWQ) Ill. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. _C-3 1. Plans (1" 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. B12 tZ C-4 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. 9rZK- C-4 3. Section view of the dry detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. $IZ-l? - _C-3 _C-4 Sce a'1tvckod AL afl IL _Calc book- -Attached- , U- -Attached- 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). X12 ?- -Attached- 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County ' soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.4 Part III. Required Items Checklist, Page 1 of 1 Permit ' NCDENR (to be provided by DWQ) O?OF W ATF9OG O T STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. ' The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. G'PROJECT INFORMATION Project name Belgate Southern Tract Contact person Beverly Rosenbloom, El Phone number 704-319-7699 Date 11/6/2008 ' Drainage area number 1 II, DESIGN INFORMATION Site Characteristics ' Drainage area 313,632.00 fe Impervious area 250,905.60 fe % impervious 80.00 % Design rainfall depth 1.00 in ' Storage Volume: Non-SR Waters Minimum volume required 20,125.00 ft3 Volume provided 22,255.00 ff3 Storage Volume: SR Waters 1-yr, 24-hr runoff depth in Pre-development 1-yr, 24-hr runoff ff3 ' Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations 1-yr, 24-hr rainfall depth 2.58> in Rational C, pre-development 0.28 (unitless) Rational C, post-development 0.82 (unitless) Rainfall intensity: 1-yr, 24-hr storm 0.12 in/hr Pre-development 1-yr, 24-hr peak flow 2.63 ft3/sec Post-development 1-yr, 24-hr peak flow 8.46 ft3/sec Pre/Post 1-yr, 24-hr peak flow control 5.83 ft3/sec Basin Elevations Basin bottom elevation 718.00 ft Sediment cleanout elevation 719.00 ft Bottom of shelf elevation 725.50 ft Permanent pool elevation 726.00 ft SHWT elevation 712.00 ft Top of shelf elevation 726.50 ft Temporary pool elevation 727.60 ft Form SW401-Wet Detention Basin-Rev.4 Parts i. & H. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) II. DESIGN INFORMATION Volume and Surface Area Calculations SA/DA ratio 3.65 (unitless) Surface area at the bottom of shelf 8,955.00 ff2 Volume at the bottom of shelf 45,466.00 ft3 Permanent pool, surface area required 11,448.00 ftz Permanent pool, surface area provided 11,541.00 ff2 OK Permanent pool volume 50,590.00 ff3 Average depth for SA/DA tables 4.38 ft OK Surface area at the top of shelf 14,328.00 ft2 Volume at the top of shelf 57,058.00 ff3 Forebay volume 9,344.00 ft3 Forebay % of permanent pool volume 18.47 % OK Temporary pool, surface area provided 16,278.00 ff Drawdown Calculations Treatment volume drawdown time 2.60 days OK Treatment volume discharge rate 0.10 ft3/s Pre-development 1-yr, 24-hr discharge 2.63 ft3/s OK Post-development 1-yr, 24-hr discharge 1.00 ft3/s OK Additional Information Diameter of orifice 2.3 in Design TSS removal 90 % Basin side slopes 3.00 :1 OK Vegetated shelf slope 10.00 :1 OK Vegetated shelf width 10.00 ft OK Length of flowpath to width ratio 4.40 :1 OK Length to width ratio 3.30 :1 OK Trash rack for overf low & orifice? Y (Y or N) OK Freeboard provided 2.25 ft OK Vegetated filter provided? N (Y or N) Design must be based on 90% TSS removal Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies 24-HR EMERGENCY PUMP Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) I]I. REQUIRED' iTEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will ¦ result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a ' requirement has not been met, attach justification. Paget Plan Initials Sheet No. C-3_ 1. Plans (1" 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), ' Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, ' High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), ' Overflow device, and Boundaries of drainage easement. Ott C-4 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, ' Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and ' Filter strip. C-4_ 3. Section view of the dry detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, ' Pretreatment and treatment areas, and Inlet and outlet structures. _ C-3 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. _ _C-4 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, eu a{fgc to verify volume provided. ' q bra ed EG -?S 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. ' _Calc book- 7. The supporting calculations. -Attached- 8. A copy of the signed and notarized operation and maintenance (O&M) agreement. -Attached- 9. A copy of the deed restrictions (if required). ?7 4- -Attached- 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County ' soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.4 Part III. Required Items Checklist, Page 1 of 1 CURVE NUMBER CALCULATIONS STORMWA TER MANAGEMENT CALCULATIONS South Tract City Boulevard Development, Charlotte, North Carolina /i?? Kimley-Hom r2 and Associates, Inc. Pre vs. Post Runoff Analysis Composite Curve Number (CN) Project Information Project Name: Parcel J KHA Project #: 018253020 Designed by: BRR Date: 10/6/2008 Revised by: Date: Revised by: Date: Drainage Area Name Drainage Location Cover/Soil Name (Type) Cover Description' Hydrologic Soil Group Curve # (CN)" Area (ac) Product of CN x area Composite Curve Number (CN) PRE-DEVELOPMENT DA-1 OUTFALL 1 Mecklenburg, Enon, Wilkes Woods Good Condition C 70 5.04 353 70 Meadow Good Condition B 71 5.04 358 71 10.08 711 70.5 DA-2 OUTFALL 1 Mecklenburg, Enon, Wilkes Woods Good Condition C 70 2.95 207 70 Mecklenburg, Enon, Wilkes Meadow Good Condition C 71 ' 2.95 209 71 Cecil Meadow Good Condition B 58 10.69 620 58 Cecil Woods Good Condition B 55 10.69 588 55 27.28 1624 59.5 Total Pre-development Area = 37.36 POST DEVELOPMENT DA-1 POND 1 Impervious 98 5.76 564 98 Mecklenburg, Enon, Wilkes Open Space - Good Condition C 74 1.44 107 74 7.20 670.77 93.20 UND DA-1 OUTFALL 1 Mecklenburg, Enon, Wilkes Open Space - Good Condition C 74 1.10 81 74 { - 1.10 81.50 74.00 DA-2 POND 2 Impervious 98 13.23 1297 98 Mecklenburg, Enon, Wilkes Open Space - Good Condition C 74 0.90 67 74 Cecil Open Space - Good Condition B 61 5.71 348 61 Roadway - Impervious 98 2.90 284 98 Mecklenburg, Enon, Wilkes Roadway - Open Space C 74 1.06 78 74 Cecil Roadway - Open Space B 61 0.10 6 61 ? - 23.91 2080.60 87.03 UND DA-2 OUTFALL 2 Mecklenburg, Enon, Wilkes Open Space - Good Condition C 74 2.65 196 74 Cecil Open Space - Good Condition B 61 3.76 230 61 6.42 425.96 66.38 Total Post-development Area = 38.62 Cover Descriptions per TR-55 Manual " From TR-55 Manual, Table 2-2 a & c K:\CHL_LDEV\018253 Crescent\026 Belgate\Belgate Stormwater Management Plan\Calculations\Parcel AStormwater Calculations_2008-10-06.As 1 of 1 TIME OF CONCENTRATION CALCULATIONS EROSION CONTROL CALCULATIONS New Towne Gardens, Union County, North Carolina £-2 YE 11 ij N N T = a7 O C w Q ? O G) C V 3 ? O w U N 0 O p IL d > E (D a 0 N O O m m d 000 U a N# a T>, E 5 a a a 0 (D Z aa) m o c may'>> r a= p K K o Y W E `o C m O a` m m N co O N N O 1n Cl. N N (j N 11 11 C C o a E v a E v ?o ? v m F% c 0 c 0 r ? c c o CO lp c v c o o U o U o `o E E N n 00 W CC) ? Cl) O cp o 0 ? 0 O O O 'O O N O O C') O O O O O m O C o 'o $ o m c c L U o o 0 o m c c L U 8 5 z z m 3 m L 3 m N L (IJ m y L U c C t (n 0 m L U c C A C t n c L U U 0 U U ? J N O J LL LL O O N Iz W 6 c J W W O W a O HYDROCAD HYDROLOGY REPORT EROSION CONTROL CALCULATIONS New Towne Gardens, Union County, North Carolina is) 2S (4S) Pre-dev DA-1 Post-d v DA-1 Post-dev ND DA-1 3P 8P Pond 1 Outfall 1 (5S) 6S i Pre-dev DA-2 Post-d v DA-2 Post-dev ND DA-2 -?7 41 7P 9P Pond 2 Outfall 2 Subca Reach and Link Belgate - Southern Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr- 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/5/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 2 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre-dev DA-1 Runoff Area=10.080 ac 0.00% Impervious Runoff Depth>0.53" Tc=25.2 min CN=71 Runoff=2.63 cfs 0.443 of Subcatchment 2S: Post-dev DA-1 Runoff Area=7.200 ac 0.00% Imperious Runoff Depth>1.85" Tc=5.0 min CN=93 Runoff=8.46 cfs 1.112 of Subcatchment 4S: Post-dev UND DA-1 Runoff Area=1.100 ac 0.00% Imperious Runoff Depth>0.65" Tc=5.0 min CN=74 Runoff=0.45 cfs 0.060 of Subcatchment 5S: Pre-dev DA-2 Runoff Area=27.280 ac 0.00% Imperious Runoff Depth>0.19" Tc=25.0 min CN=60 Runoff=1.57 cfs 0.441 of Subcatchment 6S: Post-dev DA-2 Runoff Area=23.910 ac 0.00% Imperious Runoff Depth>1.38" Tc=5.0 min CN=87 Runoff=21.76 cfs 2.744 of Subcatchment 8S: Post-dev UND DA-2 Runoff Area=6.420 ac 0.00% Imperious Runoff Depth>0.36" Tc=5.0 min CN=66 Runoff=1.22 cfs 0.191 of Pond 3P: Pond 1 Peak Elev=727.95' Storage=32,636 cf Inflow=8.46 cfs 1.112 of Outflow=0.93 cfs 0.443 of Pond 7P: Pond 2 Peak Elev=721.82' Storage=106,572 cf Inflow=21.76 cfs 2.744 of Outflow=0.31 cfs 0.297 of Pond 8P: Outfall 1 Inflow=1.00 cfs 0.503 of Primary=1.00 cfs 0.503 of Pond 9P: Outfall 2 Inflow=1.43 cfs 0.489 of Primary=1.43 cfs 0.489 of Total Runoff Area = 75.990 ac Runoff Volume = 4.991 of Average Runoff Depth = 0.79" 100.00% Pervious= 75.990 ac 0.00% Impervious= 0.000 ac Belgate - Southern Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/5/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 1S: Pre-dev DA-1 ' Runoff = 2.63 cfs @ 12.77 hrs, Volume= 0.443 af, Depth> 0.53" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" ' Area (ac) CN Description 10.080 71 10.080 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 25.2 Direct Entry, From spreadsheet Subcatchment 1 S: Pre-dev DA-1 Hydrograph I ? Runoff 2.63 cfs Charlotte 24-hr 1-yr 24.00 hrs 1 yr 24 hr ? Rainfall =2.58" 2 Runoff Area=10.080 ac Runoff Volume=0.443: of 'rl Runoff Depth>0.53" Tc=25.2_min CN=71 l 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) 1 Belgate - Southern Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/5/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 4 ' Summary for Subcatchment 2S: Post-dev DA-1 [49] Hint: Tc<2dt may require smaller dt Runoff = 8.46 cfs @ 12.40 hrs, Volume= 1.112 af, Depth> 1.85' Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 7.200 93 7.200 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, From spreadsheet 1 1 1 1 1 1 1 Beigate - Southern Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr- 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/5/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 4S: Post-dev UND DA-1 [49] Hint: Tc<2dt may require smaller dt Runoff = 0.45 cfs @ 12.45 hrs, Volume= 0.060 af, Depth> 0.65" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 1.100 74 1.100 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Post-dev UND DA-1 of 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) 1 Belgate - Southern Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr- 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/5/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 5S: Pre-dev DA-2 Runoff = 1.57 cfs @ 13.04 hrs, Volume= 0.441 af, Depth> 0.19" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs ' Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 27.280 60 27.280 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 25.0 Direct Entry, From Spreadsheet ' Subcatchment 5S: Pre-dev DA-2 Hydrograph ', I 0 Runoff 1.57 cfs Charlotte 24-hr 1-yr 2.4.00 hrs 1 yr - 24 hr f? Rainfall=2.58' ' ...Runoff Area. 27,280 ac ?Y .. Runoff Volume=0.441: of f v Runoff Depth>0.19" r ' Tc 25.0. min CN=60 o 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Belgate - Southern Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/5/2008 HydroCAD® 8.50 s/n 005123 © 2007 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 6S: Post-dev DA-2 [49] Hint: Tc<2dt may require smaller dt Runoff = 21.76 cfs @ 12.41 hrs, Volume= 2.744 af, Depth> 1.38" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 23.910 87 23.910 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 23 22 21 19 18 17 16 15 w 14 0 13 " 3 12 rL 11 10 Subcatchment 6S: Post-dev DA-2 Hydrograph ------- _ Runoff i 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Belgate - Southern Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr- 24 hr Rainf611=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/5/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 8S: Post-dev UND DA-2 [49] Hint: Tc<2dt may require smaller dt Runoff = 1.22 cfs @ 12.51 hrs, Volume= 0.191 af, Depth> 0.36" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 6.420 66 6.420 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (fUsec) (cfs) 5.0 Direct Entry, Subcatchment 8S: Post-dev UND DA-2 Hydrograph Runoff 1.22 cfs Charlotte 24-hr 1-yr_24.0.0 _hrs 1 yr - 24_hr. ....... ' Rainfall'=2.58" Runoff Area=6! 420 ac a N Runoff Vol ume=0.191 of LL Runoff Depth>0.36" Tc=5.0 min t?f CN=66 o- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Belgate - Southern Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr- 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/5/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 9 Summary for Pond 3P: Pond 1 Inflow Area = 7.200 ac, 0.00% Impervious, Inflow Depth > 1.85" for 1 yr - 24 hr event Inflow = 8.46 cfs @ 12.40 hrs, Volume= 1.112 of Outflow = 0.93 cfs @ 14.23 hrs, Volume= 0.443 af, Atten= 89%, Lag= 109.4 min Primary = 0.93 cfs @ 14.23 hrs, Volume= 0.443 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 727.95'@ 14.23 hrs Surf.Area= 19,319 sf Storage= 32,636 cf Plug-Flow detention time= 322.2 min calculated for 0.443 of (40% of inflow) Center-of-Mass det. time= 198.3 min ( 1,009.9 - 811.6 ) Volume Invert Avail.Storage Storage Description #1 726.00' 128,745 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 726.00 13,220 0 0 727.00 17,234 15,227 15,227 728.00 19,423 18,329 33,556 729.00 21,832 20,628 54,183 730.00 23,807 22,820 77,003 731.00 25,853 24,830 101,833 732.00 27,972 26,913 128,745 Device Routing Invert Outlet Devices ' #1 Primary 726.00' 36.0" x 51.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 725.00' S=0.0196'/' Cc= 0.900 n=0.013 #2 Device 1 726.00' 2.3" Vert. Orifice/Grate C= 0.600 #3 Device 1 727.75' 2.50' W x 0.75'H Vert. Orifice/Grate C=0.600 #4 Device 1 729.00' 2.50' W x 0.67'H Vert. Orifice/Grate C=0.600 #5 Device 1 729.50' 3.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 Primary OutFlow Max=0.92 cfs @ 14.23 hrs HW=727.95' (Free Discharge) 'L1=Culvert (Passes 0.92 cfs of 23.17 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.19 cfs @ 6.56 fps) 3=Orifice/Grate (Orifice Controls 0.73 cfs @ 1.44 fps) -Orifice/Grate ( Controls 0.00 cfs) =Orifice/Grate ( Controls 0.00 cfs) Belgate - Southern Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr- 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/5/2008 HydroCAD® 8.50 s/n 005123 © 2007 HydroCAD Software Solutions LLC Page 10 Pond 3P: Pond 1 Hydrograph Inflow p Primary w v 3 0 U. 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Belgate - Southern Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/5/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 11 Summary for Pond 7P: Pond 2 Inflow Area = 23.910 ac, 0.00% Impervious, Inflow Depth > 1.38" for 1 yr - 24 hr event Inflow = 21.76 cfs @ 12.41 hrs, Volume= 2.744 of Outflow = 0.31 cfs @ 24.00 hrs, Volume= 0.297 af, Atten= 99%, Lag= 695.2 min Primary = 0.31 cfs @ 24.00 hrs, Volume= 0.297 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 721.82'@24.00 hrs Surf.Area= 42,040 sf Storage= 106,572 cf Plug-Flow detention time= 420.6 min calculated for 0.297 of (11% of inflow) Center-of-Mass det. time= 249.5 min ( 1,088.9 - 839.5 ) Volume Invert Avail.Storage Storage Description #1 719.00' 275,997 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 719.00 31,750 0 0 720.00 37,219 34,485 34,485 ' 721.00 39,841 38,530 73,015 722.00 42,524 41,183 114,197 723.00 53,616 48,070 162,267 724.00 56,850 55,233 217,500 725.00 60,143 58,497 275,997 Device Routing Invert Outlet Devices #1 Primary 719.00' 36.0" x 147.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 716.00' S=0.0204'/' Cc= 0.900 n=0.013 #2 Device 1 719.00' 2.7" Vert. Orifice/Grate C= 0.600 #3 Device 1 723.60' 4.00' x 3.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 #4 Device 1 722.00' 1.50' W x 0.50'H Vert. Orifice/Grate C=0.600 Primary OutFlow Max=0.31 cfs @ 24.00 hrs HW=721.82' (Free Discharge) t1=Culvert (Passes 0.31 cfs of 39.42 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.31 cfs @ 7.92 fps) 3=Orifice/Grate ( Controls 0.00 cfs) -Orifice/Grate (Controls 0.00 cfs) Belgate - Southern Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Belgate - Southern Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr- 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/5/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 13 Summary for Pond 8P: Outfall 1 [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 8.300 ac, 0.00% Impervious, Inflow Depth > 0.73" for 1 yr - 24 hr event Inflow = 1.00 cfs @ 14.16 hrs, Volume= 0.503 of Primary = 1.00 cfs @ 14.16 hrs, Volume= 0.503 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Pond 8P: Outfall 1 Hydrograph F-s Inflow 10 Primary w v 3 0 U. U 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Belgate - Southern Tract SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr- 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 11/5/2008 HydroCAD® 8.50 s/n 005123 @2007 H droCAD Software Solutions LLC Page 14 Summary for Pond 9P: Outfall 2 [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 30.330 ac, 0.00% Impervious, Inflow Depth > 0.19" for 1 yr - 24 hr event Inflow = 1.43 cfs @ 12.52 hrs, Volume= 0.489 of Primary = 1.43 cfs @ 12.52 hrs, Volume= 0.489 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Pond 9P: Outfall 2 Hydrograph Fq- Inflow 10 Primary N V O U. U 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours)