HomeMy WebLinkAbout20081213 Ver 2_Acceptance Letter_20081103?OF wArF9Q Michael F. Easley, Governor
`C? C. William G. Ross Jr., Secretary
r North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
November 3, 2008
Mecklenburg County
DWQ EXP # 08-1213v2
EXPRESS REVIEW ACCEPTANCE LETTER
Mr. David Niekamp
Crescent Resources, LLC
400 S. Tryon Street, Suite 1300
Charlotte, NC 28285
Subject Property: South Tract City Blvd Development (Stormwater Management Plan)
On August 25, 2008, the Division of Water Quality (DWQ) issued a 401 Water Quality Certification to
you to place fill within or otherwise impact 250 linear feet of an unnamed tributary to Doby Creek for the
purpose of constructing the proposed "South Tract Blvd. Apartment" in Meckelnburg County. In order to
meet Condition 6 of the 401 Certification for this project, the 401 Oversight/Express Permitting Unit of
the Division of Water Quality received a request from Mr. Matt Edwards, PE and Ms. Beverly
Rosenbloom, El, both of Kimley-Horn Associates, Inc. regarding the subject project for acceptance into
the Express Review Program. This letter advises you that your project will be accepted into the Express
Review Program once the following items are received:
a. The application fee of $1000.00 made payable to the North Carolina Division of Water
Quality [Stormwater management plan with two (2) drainage areas];
b. Three (3) complete and collated copies of the Express Review Stormwater Management Plan
Application [http://h2o.enr.state.ne.us/ncwetlands/documents/Exp Rev SWMA.pdfJ;
c. Three (3) copies of all supporting information pertaining to this project including
i. Design calculation sheets for all proposed BMP(s) sized for both on-site and off-
site drainage, if any;
ii. BMP Supplement for each proposed BMP including Design Summary and
Required Items Check List (available at
http://h2o.enr.state.nc.us/su/bmt) forms.htm) along with all required items;
iii. A signed and notarized Operation & Maintenance Agreement for each BMP;
d. Three copies of full size plans (with detailed construction information) shall include the
following:
i. Entire site plan with existing and proposed contours and delineated drainage
areas to the BMPs;
ii. Erosion and sediment control plans;
iii. Plan views and cross sectional details of all BMPs and associated structures
with elevations;
iv. Construction sequence and planting schedule for the proposed BMPs;
e. One (1) data CD of full size plans in TIFF Group 4 format (black and white, not grayscale or
color). If the plans are too large to store in TIFF format, they can be stored in PDF.
401401 Oversight / Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/ncwetlands
NorthCarolina
Naturally
An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper
Please be advised that all Stormwater BMPs must be designed, at a minimum, to remove 85% TSS, in
accordance with the most recent version of the NC Division of Water Quality Stormwater Best Management
Practices Manual. In addition, for projects located in a Trout (Tr) or Nutrient Sensitive Watershed (NSW),
the Stormwater BMP(s) you choose should be designed to meet at least 30% nutrient removal efficiency.
Details of the Express Review Program requirements can be found at:
http://h2o.enr.state.nc.us/ncwetlands/express review.htm
Additionally, a pre-application meeting (to include the property owner) is required prior to the submittal
of your completed application package. The clock for this project will not start until receipt of the
completed application package and required fee. If the drainage areas exceed what is indicated on the
Initial Interest Form and/or the services are different, you may be required to remit an additional fee.
You have the option of getting your Stormwater Management Plan approved by the City of Charlotte.
However, your SMP must meet their current Phase II SMP ordinance by designing your BMPs to treat all
impervious surfaces in accordance with the current NC DWQ BMP Manual.
Thank you for your attention to this matter. If you have any questions or wish to discuss these matters
further please do not hesitate to call Joseph Gyamfi or Lia M. Gilleski at 919-733-1786.
Sincerely,
f
Cyndi Karoly, Supervisor
401 Oversight/Express Review Program
CBK/jg
cc: File copy
Matt Mathews, DWQ - Wetlands & Stormwater Branch
Matt Edwards/Bev. Rosenbloom, 4651 Charlotte Park Dr., Suite 300, Charlotte, NC 28217