HomeMy WebLinkAbout20071134 Ver 1_Email_20081024[Fwd FW Ball Creek Culvert]
Subject: [Fwd FW Ball Creek Culvert]
From: Mike Parker <Mike Parker@ncmail net>
Date: Fri, 24 Oct 2008 15 16 52 -0400
To: Brian Wrenn <Brian Wrenn@ncmail net>
Brian, see attached e-mail from Randy McKinney for the Bald Creek Culvert (Ball Creek) work on the
US 19 project Mike
Mike Parker - Mike Parker@ncmail net
North Carolina Dept of Environment and Natural Resources
Asheville Regional Office
Division of Water Quality - Water Quality Section
2090 U S Highway 70
Swannanoa, NC 28778
Tel 828-296-4500
Fax 828-299-7043
Subject: FW Ball Creek Culvert
From: "Mckinney, Randall J" <rmckinney@ncdot gov>
Date: Fri, 24 Oct 2008 14 36 45 -0400
To: "ARO, Mike Parker" <Mike Parker@ncmail net>, "Mckinney, Randall J" <rmckinney@ncdot gov>
Mike
Here is an email copy of the sequence plan for the Ball creek Culvert that is going
to be replaced by the bridge It is basically using the existing culvert to manage
water flow during construction I am also sending you a hard copy This will dust
give you that extra Day or three before the mail arrives Is there anything else you
need regarding this'> Also will you send me an official acceptance?
Thanks
Randy McKinney PE
Mike Parker <Mike Parker a,ncmail net>
NC DENR - Asheville Regional Office
Division of Water Quality - Water Quality Section
FW: Ball Creek Culvert.eml
r2518b_bald_creek_RCBC.pdf 1
1 of I 11/3/2008 3 04 PM
[Fwd Re FW Ball Creek Culvert]
Subject: [Fwd Re FW Ball Creek Culvert]
From: Brian Wrenn <bnan wrenn@ncmail net>
Date: Mon, 03 Nov 2008 13 37 29 -0500
To: Sonia Gregory <Sonia Gregory@ncmail net>, faye stephenson@ncmail net
please scan and file the attached email Thanks
B
Subject: Re FW Ball Creek Culvert
From: Mike Parker <Mike Parker@ncmail net>
Date: Thu, 30 Oct 2008 09 05 40 -0400
To: "Mckinney, Randall J" <rmckmney@ncdot gov>, Brian Wrenn <Brian Wrenn@ncmail net>
Randy, staff of the Division of Water Quality have reviewed the sequencing plan for
the Bald Creek Bridge replacement project and the plan appears to be satisfactory
Please take the necessary steps to minimize any impacts to state surface waters when
working in and around Bald Creek If you have questions, please do not hesitate to
call me at 828-296-4500
Thanks,
Mike Parker
Mckinney, Randall J wrote
Mike
Here is an email copy of the sequence plan for the Ball creek Culvert that is
going to be replaced by the bridge It is basically using the existing culvert to
manage water flow during construction I am also sending you a hard copy This
will dust give you that extra Day or three before the mail arrives Is there
anything else you need regarding this> Also will you send me an official
acceptancer'
Thanks
Randy McKinney PE
Mike Parker - Mike Parker@ncmail net
North Carolina Dept of Environment and Natural Resources
Asheville Regional office
Division of Water Quality - Water Quality Section
2090 U S Highway 70 Swannanoa, NC 28778
Tel 828-296-4500
Fax 828-299-7043
Mike Parker <Mike Parker@ncmail net>
NC DENR - Asheville Regional Office
Division of Water Quality - Water Quality Section
Content-Type: message/rfc822
Re: FW: Ball Creek Culvert.eml
Content-Encoding: 7bit
1 of 1 11/3/2008 2 52 PM
FW Ball Creek Culvert
Subject: FW Ball Creek Culvert
From- "Mckinney, Randall J" <rmckinney@ncdot gov>
Date: Fn, 24 Oct 2008 14 36 45 -0400
To: "ARO, Mike Parker" <Mike Parker@ncmail net>, "Mckinney, Randall J" <rmckinney@ncdot gov>
Mike
Here is an email copy of the sequence plan for the Ball creek Culvert that is going
to be replaced by the bridge It is basically using the existing culvert to manage
water flow during construction I am also sending you a hard copy This will dust
give you that extra Day or three before the mail arrives Is there anything else you
need regarding this' Also will you send me an official acceptance's
Thanks
Randy McKinney PE
r2518b bald_creek_RCBC.pdf
1 of 1 11/3/2008 3 02 PM
x. ?o
II I o,
3 m 3
m i E
33 m 3
G O +? m E
7
U
y 'e
7
Q w
C
O
U
L
N
CO i m m m U1 ¢ u ¢ ¢ n
U
m
-1
sr ?'
w $
Of
I o
? o
go
I?
i
i
I?
III
g I ?
I ?
1 I
'1 I _ o