October 27, 2008
Haywood County
DWQ Project No 081583
NCSR 1336 (Wesley Creek Road)
APPROVAL of 401 Water Quality Certification with Additional Conditions
Mr J B Setzer, P E
Division 14 Engineer
N C Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
Dear Mr Setzer
You have our approval, in accordance with the attached conditions and those listed below, for the following impacts in
Mooney Branch, in four (4) unnamed tributaries to Mooney Branch and in two (2) unnamed tributaries to Wesley Creek,
for the purpose of making improvements to NCSR 1336 (Wesley Creek Road) in Haywood County
Stream Impacts in the French Broad River Basin
Site Stream Permanent Fill in Permanent Fill in Temporary Total Stream Stream
Relocation Intermittent Stream Perennial Stream Dewatering in Impact Impacts
(linear ft) (linear ft) (linear ft) Perennial Stream (linear ft) Requiring
(linear ft) Mitigation
linear ft
1 - STA 0 0 35 80 115 0
3+48
2 - STA 0 0 14 65 79 0
8+25
3 - STA 0 0 15 80 95 0
14+10
4 - STA 0 0 48 115 163 0
36+06
5 - STA 0 0 16 71 87 0
38+28
6 - STA 0 0 40 92 132 0
60+00
6A- STA 85 0 0 110 195 0
60+05 to
60+90
7- STA 0 0 20 65 85 0
74+45
Total 85 0 188 678 951 0
Total Stream Permanent Impact for Protect. 188 linear feet. Temporary Impact for Protect: 678 linear feet.
Total Stream Relocation for Protect: 85 linear feet
North Carolina Division of Water Quality 2090 US Highway 70 Swannanoa, NC 28778
Internet www ncwaterquality org
NOne
hCarolina
"atura!!y
Phone (828) 2964500 Customer Service
FAX (828) 299-7043 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer
Mr J B Setzer, P E
October 27, 2008
Page Two
The project should be constructed in accordance with your application dated October 15, 2008 (received October 17,
2008), including the environmental commitments made in the application letter After reviewing your application, we
have decided that these impacts are covered by General Water Quality Certification No 3704, corresponding to the U S
Army Corps of Engineers Nationwide Permit Number 14 In addition, you should acquire any other federal, state or
local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-
Discharge and Water Supply Watershed regulations This certification does not authorize the discharge of waste rock
and dirt into the stream or riparian zone except for permitted areas associated with the bank stabilization work
This approval is valid solely for the purpose and design described in your application (unless modified below) Should
your project change, you must notify the DWQ and submit a new application If the property is sold, the new owner
must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all
conditions If total wetland fills for this project (now or in the future) exceed one acre, or if total impacts to streams (now
or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H 0506
(h) (6) and (7) For this approval to be valid, you must follow the conditions listed to the attached certification and any
additional conditions listed below
There shall be no excavation from or waste disposal into, jurisdictional wetlands or waters associated with this
permit without appropriate modification Should waste or borrow sites, or access roads to waste or borrow sites, be
located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road
construction activities
2 Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this
Certification If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall
be removed and the natural grade restored upon completion of the project
3 Adequate sedimentation and erosion control measures must be installed and maintained on the project site to
minimize sediment transport to downstream aquatic resources Temporary cover (wheat, millet or similar annual
grain) or permanent herbaceous cover shall be planted on all bare soil as soon as possible following ground
disturbing activities Erosion control mating shall be used in conjunction with appropriate seeding on disturbed soils
in steep slope and riparian areas Matting should be secured in place with staples or wherever possible, live stakes of
native trees Straw mulch and tall fescue shall not be used in riparian areas
4 If multiple pipes or barrels are required, they shall be designed to mimic the natural stream cross section as closely as
possible including pipes or barrels at flood plain elevation and/or sills where appropriate Widening the stream shall
be avoided Stream channel widening at the inlet or outlet end of structures typically decreases water velocity
causing sediment deposition that requires increased maintenance and disrupts aquatic life passage
5 In-stream work and land disturbance with the 25-foot wide buffer zone are prohibited during the trout-spawning
season of January 1 through April 15 to protect the egg and fry stages of trout from off site sedimentation during
construction of the roadway
6 For projects impacting waters classified by the NC Environmental Management Commission as Trout (Tr), High
Quality Waters (HQW) or Water Supply I or II (WS-I, WS-II), stormwater shall be directed to vegetated buffer
areas, grass-lined ditches or other means appropriate to the site for the purpose of pre-treating stormwater runoff
prior to discharging directly into streams Mowing of existing vegetated buffer areas is strongly discouraged
7 Native riparian vegetation (e g rhododendron, dog hobble, willows, alders, sycamores, dogwoods, black walnut and
red maple) must be reestablished within the construction limits of the project by the end of the growing season
following completion of construction
8 The use of riprap above the Normal High Water Mark shall be minimized Any riprap placed for stream stabilization
shall be placed in stream channels in such a manner that it does not impede aquatic life passage
9 Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes
aquatic life passage Bioengineering boulders or structures should be properly designed, sized and installed
10 Heavy equipment shall be operated from the banks rather than in the stream channels in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream
11 All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials
12 The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted
for approval
Mr J B Setzer, P E
October 27, 2008
Page Three
13 Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters
is prohibited
14 No rock, sand or other materials shall be dredged from the stream channel, except where authorized by this
certification
15 All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3 1, unless otherwise
authorized by this certification
16 The outside buffer, wetland or water boundary located within the construction corridor approved by this
authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities Impacts to
areas within the fencing are prohibited unless otherwise authorized by this certification
17 A copy of this Water Quality Certification shall be maintained on the construction site at all times In addition, the
Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer
and the on-site project manager
18 The issuance of this certification does not exempt the Permittee form complying with any and all statutes, rules,
regulations or ordinances that may be imposed by other government agencies (i a local, state, and federal) having
jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and
sedimentation control requirements, etc
19 The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality
standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any
other appropriate requirements of State or Federal law If DWQ determines that such standards or laws are not being
met (including failure to sustain a designated or achieved use) or that State of Federal law if being violated, or that
further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification
20 The Permittee shall report any violations of this certification to the Division of Water Quality within 24-hours of
discovery
21 Upon completion of the project, the NCDOT Division Engineer shall complete and return the enclosed "Certificate of
Completion Form" to notify NCDWQ when all work included in the §401 Certification has been completed This
form shall be returned to the Transportation Permitting Unit of the NC Division of Water Quality, 2321 Crabtree
Blvd , Suite 250, Raleigh, North Carolina 27604
If you do not accept any of the conditions of this certification, you may ask for an adJudicatory hearing You must act
within 60 days of the date that you receive this letter To ask for a hearing, send a written petition, which conforms to
Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service
Center, Raleigh, N C 27699-6714 This certification and its conditions are final and binding unless you ask for a
hearing
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act If you have
any questions, please telephone Mr Mike Parker of the Asheville Regional Office at 828 296 4500
Sincerely,
.'. 4)?_A
Coleen H Sullins, Director
Division of Water Quality
cc Mark Davis, Division 14, DEO
Ed Ingle, Roadside Environmental
David Baker, USACE, Asheville Field Office
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
081583 (Setzer) NCSR 1336 (Wesley Creek Road)